Filter Results

1701 to 1725 of 2582
ccdesignguidelines_9.25
a feeling of association and sense of place. In accordance with Seattle Municipal Code 25.20.(SMC 25.20) no changes may be made (including ...
0.00219586631 |
a/172829
lpbminutes_10-19-22
, is required prior to the issuance of any city building, demolition, street use, or other permits for ...
0.00219586631 |
a/139564
desrpt_cassel_crag(0)
for ease of access, and floors carpeted, but many original finishes remain intact. Summary of primary alterations The subject building is ...
0.00219586631 |
a/76328
desrpt_cassel_crag
of access, and floors carpeted, but many original finishes remain intact. Summary of primary alterations The subject building is largely ...
0.00219586631 |
a/76329
lpbminutes11-20-19
to 1020 South Main Street, also in the Nihonmachi area. This building was destroyed as part of the demolition making way ...
0.00219586631 |
a/75006
lpbminutes_6-5-24
report includes that requirement. Ms. Wasserman said she was very bothered by the removal and that it is against policy. She said it was ...
0.00219586631 |
a/163996
2014-council-work-program
on enforcement complaint response time.ChairPermit Review Times and the Permit Review ProcessReview DPD quarterly reports o ...
0.00219586631 |
a/53339
pspbminutes_3-1-23
Standards. Because of the condition of the existing building, demolition and sidewalk replacement is happening now. There ...
0.00219586631 |
a/145826
cmpcucacreportaug2017
in the University District Northwest Urban Center Village (UDNUCV), including the number and types of units built, the number, types and ...
0.00219586631 |
a/77694
southparkrfptechanalysis2022
with the permitting and scheduling of large infrastructure projects; and the standards, design processes, methodologies and ...
0.00219586631 |
a/133382
dpr_projects
resulting from this project are paid by the General Subfund, per Ordinance 121488.4th Quarter 20063rd Quarter 2008BCL/Program Name:West ...
0.00219586631 |
a/61250
dpr_projects
, per Ordinance 121488.4th Quarter 20063rd Quarter 2008BCL/Program Name:West Point Settlement ProjectsDiscovery Park - Building 653 ...
0.00219586631 |
a/61306
seattle questions aeg response design and transpo
is the anticipated building permit application submittal date? We anticipated pulling the building permit ...
0.00219586631 |
a/56278
1_summary_adu_feis_2018
modify the rules that regulate when and where a property owner can create an ADU to make it easier for property owners to ...
0.00219586631 |
a/53163
shs_lwb_pilot_input
, jogging and biking. By keeping the road closed more people can safely use it. Also now that biking around Seward Park is no longer ...
0.00219586631 |
a/104122
isrd102325__606-12thaves._addlphotos
St along East Property Line View on S Weller facing Southwest View from S Lane St near SE corner of property 6) Signage: The ...
0.00219586631 |
a/174484
2005annualreportweb
was installed and abatement and demolition of the shop building began. TheFremont Bridge Operations and Maintenance Shop ...
0.00219586631 |
a/99359
equitabledevelopmentindicators
of units represented in permits flagged for TRAO (permits are flagged if changes may require tenants to ...
0.00219586631 |
a/108549
opcdlakecityrezonedirectorsreport
likely be financed in part with support by the Office of Housing. The potential developer is interested in constructing a 7-story apartment ...
0.00219586631 |
a/171555
water
. WDSOT, in conjunction with the Seattle Department of Transportation, is conducting a plan and study for demolition and ...
0.00219586631 |
a/60554
sustainableinfrastructureinitiativereport
and Development is also ultimately responsible for the permitting of private sector development projects, which largely dri ...
0.00219586631 |
a/88176
fas_cip
also fulfills the City’s permitting commitments to the Muckleshoot Tribe from the construction of the Elliott Bay Seawall to ...
0.00219586631 |
a/173304
constlupermitcklistphasedprojects
the applicant in preparing a complete application. It is the responsibility of the applicant to prepare a complete submittal. For further ...
0.00219586631 |
a/97911
uw-annual-report-2024-final
development schedule set forth in the Master Plan. • The CMP permits the University to develop up to 6 million square ...
0.00219586631 |
a/156091
appendix_cip
that will permit the use of water as a fire protection system, providing an improvement in worker safety. Also, if the ...
0.00219586631 |
a/147698