Search Results
Results
1651 to 1675 of 2644
- seattletimes-building-complex-printing-plant feet in area. As any proposed demolition of the subject building described within this report will require a ... 0.00220923638 | | a/74591
- boren-investment-nomination ” for commercial projects over 4,000 square feet in area. As any proposed alterations or demolition of the subject building ... 0.00220923638 | | a/75832
- lpbcurrentnom_pacifictelephonetelegraph and Development (DPD) permit records; property tax records from the Puget Sound Regional Archives; digital documents from ... 0.00220923638 | | a/74519
- project_copper_sdci_mup_comments regarding the application submitted by Children’s Hospital (“Children’s”) for a Land Use permit to allow a three-story ... 0.00220923638 | | a/77140
- cprs annual report 2018 , Sound Transit 3, SR99 Demolition, Decommissioning, and Surface Street Project, and SR-520 projects, and executed an ... 0.00220923638 | | a/100842
- 2018-12-10 draft sir - parking enforcement - for working group ... locations. 3. Restricted Parking Zones ("RPZ") means a portion of the street commonly used for vehicular parking where vehicles properly ... 0.00220923638 | | a/117004
- 300_pine_unit_1_summary on floor 1. Core and Shell for Office R & D Tenant - Floors SB, Metro & Part of Floor 2: Demolition (Completed): ... 0.00220923638 | | a/75095
- lidi5feasibilitystudysummaryreportfinal ). Over the same period, 59,000 housing units were added, a 19 percent increase (Washington State Office of Financial Management (OFM), ... 0.00220923638 | | a/87192
- mhcminutes10-23-19 , housing a-b, social a, retail a-d, other a-b uses permitted. Space is 1,262 square feet. No proposed changes to use. ... 0.00220897328 | | a/73586
- context-south-lake-union of each newly identified property. In most cases only the exterior of the property was examined. Surveyors also noted any major alterations ... 0.00220897328 | | a/74345
- mo major institutions and school program ord , a single Advisory Committee serving more than one institution may 7 be permitted. 8 3. The institution, in consultation ... 0.00220897328 | | a/173778
- ast 2 - cover sheet . • A demolition permit must be issued. (Our destructive training is considered ... 0.00220897328 | | a/63976
- mhc102225sr %). Additional relevant information: • Zone 3, street level, All Uses permitted. • Prior use: Food (e) • Proposed use: ... 0.00220897328 | | a/174284
- sepachecklistonlowriseamendment , the recommended outcome of this proposal is not expected to substantively alter decisionmaking on any individual pending application. 10. ... 0.00220897328 | | a/88030
- sectionsudistrictdrafteis3-2populationhousingemployment permitted citywide were in larger multi-family structures. Approximately 16,965 new residential units were ... 0.00220897328 | | a/87799
- desrptyeslersteam storage area as well as chimney access. The metal door to the chimney is stamped "Alphons Custodis Chimney Const. Co., Chicago, Ill." ... 0.00220897328 | | a/76320
- yesler-terrace-steam-plant-designation subbasement provides storage area as well as chimney access. The metal door to the chimney is stamped "Alphons Custodis Chimney Const. Co., ... 0.00220897328 | | a/76597
- ast 3 - flow chart ASBESTOS SURVEY The city of Seattle require an asbestos survey prior to the issuance of a Demo Permit. The SFD requires a ... 0.00220897328 | | a/63977
- 2021 first hill landmark preservation dns to demolition of an existing low-scaled masonry building with future grading and construction of a new highrise structure ... 0.00220897328 | | a/87069
- id1.12.16 are prohibited as principal uses, but may be permitted as accessory uses. Applicant Comment: Malcom Harris explained the ... 0.00220897328 | | a/72917
- hmc_dpd_annual_status_report_updated_8_13_20 : Ongoing Compliance 5. Approval of the Master Plan is not approval of the proposed demolition or any alteration to ... 0.00220897328 | | a/76774
- harborviewsacannualreportpresentation Compliance 5. Approval of the Master Plan is not approval of the proposed demolition or any alteration to Harborview Hall ... 0.00220897328 | | a/76768
- harborview medical center dpd annual status report june 2021 - ... to SMC 23.69.035. Status: Ongoing Compliance 5. Approval of the Master Plan is not approval of the proposed demolition or ... 0.00220897328 | | a/135328
- harborview medical center dpd annual status report june 2022 - ... of the proposed demolition or any alteration to Harborview Hall or the East Hospital (Center Wing). If either of those ... 0.00220897328 | | a/147413
- lpbminutes7-17-19 the 1939 conversion from public market to performance venue, the building has experienced several subsequent alterations. In 1959 the north ... 0.00220897328 | | a/75043