Filter Results

1626 to 1650 of 2651
finalstormwatermanualappendixa
. • “Building permit” means a document issued by SDCI authorizing construction or other specified activity in accordance ...
0.00219743326 |
a/96537
adrule9.07
, and, if available, two elevators if the TCO area is proposed to be above the 7th floor. 2. In buildings required to be sprinklered ...
0.00219743326 |
a/64130
lpb060226_guidelines
to alternation, demolition, construction, reconstruction, restoration, remodeling, painting, or signing) to the exterior of ...
0.00219743326 |
a/181489
isrdminutes_8-23-22
of the project. The project was presented to the Board on July 12th for Use, Demolition and Final Design. The applicant ...
0.00219743326 |
a/139604
building owner decarb grant 2024 contract template
than in association with the Project, unless otherwise permitted in writing by the City. 12. RECIPIENT’S OBLIGATION TO ...
0.00219743326 |
a/168839
lpb040726_guidelinedraft
to alternation, demolition, construction, reconstruction, restoration, remodeling, painting, or signing) to the exterior of ...
0.00219743326 |
a/179222
annexiv.esf14.2018-final
and in an equitable way. • Seattle Department of Construction and Inspections o Lead for post-disaster inspections and ...
0.00219743326 |
a/57040
water_project_detail
of Transportation (SDOT), is conducting a plan and study for demolition and replacement of the existing facility. At this ...
0.00219743326 |
a/60931
notes_71014
, or the demolition of garages. A: SDOT is currently working on a Commercial Business District Curbspace Study, which will ...
0.00219743326 |
a/103586
idminutes12-10-19
removal of seven (7) trees on the site and in the right-of-way. A new landscaping plan, including tree replacement, is proposed. The ...
0.00219743326 |
a/73111
spu_w_project_detail
of Transportation, is conducting a plan and study for demolition and replacement of the existing facility. At this early ...
0.00219743326 |
a/60991
2021 update.annexiv.esf14.signed
-disaster inspections and permitting. o Coordinates with Emergency Management on damage assessment information. o ...
0.00219743326 |
a/57058
05-10_wf_adopted_project_detail_final
a plan and study for demolition and replacement of the existing facility. At this early stage,a number of options are ...
0.00219743326 |
a/60808
fas-pc-contracting-emergency-red-package-boilerplate
) • @@Technical Specifications (if applicable) • @@Drawings (if applicable) • @@Surveys (if applicable) • @@Existing Conditions (if ...
0.00219743326 |
a/139390
05-10_proposed_cip_spu_wf_project_detail
, is conducting a plan and study for demolition and replacement of the existing facility. At this early stage, a number of ...
0.00219743326 |
a/60871
2026_bdg_contract_template
with the Project, unless otherwise permitted in writing by the City. 12. RECIPIENT’S OBLIGATION TO TRACK AND DISBURSE ...
0.00219743326 |
a/179735
annualreportjuly2015june2016
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.00219743326 |
a/77160
pikepinesepachecklist
be considered “vested” and subject to review under current codes and regulations. 10. List any governmental approvals or ...
0.00219743326 |
a/87333
2017-11-06_annexiv.eop_earthquake incident annex
permit. To the degree practical, shelters will be established nearest to the community in need. Residents will be ...
0.00219743326 |
a/57071
adoptedufcmeetingnotes081623
Available CAUTION: External Email Thank SCALE design for retaining exceptional trees at 9017 13th AVE NW With six new townhomes! Building ...
0.00219743326 |
a/148246
constpermitcklistnewcommproject
Occupancy this permitMeans of Egress/Exiting covered Accessibility/Barrier free design covered Mixed construction typeHeight/Area/Type of ...
0.00219743326 |
a/97915
responsesquireparkcomments-2014-02-24
for the traffic circulation. Acquiring new right-of-way could require the demolition of existing housing. PDEIS, Appendix ...
0.00219743326 |
a/77576
pinepineconservationstudyphase2
, downtown development projects currently permitted or in the permit process were evaluated to determine ...
0.00219743326 |
a/87339
newhalem_20221212_sclresponsefercadditionalinfo
Estimate.Cost ItemDescription Item Total 1 Project Management, Site Identification, Design, and ...
0.00219743326 |
a/145996
constpermitcklistsmallmf
/Type of Construction covered Demolition is required – Tip 337 Sprinklers Deep excavation at property line Unit separations ...
0.00219743326 |
a/97919