Filter Results

1601 to 1625 of 2624
psb10-7-15_minutes
with these goals, installation of permanent metal security bars in storefront windows is prohibited. Permanent ornamental gates are ...
0.00216312683 |
a/73748
rko-distributing-company-building-designation
, made by the resident blacksmiths, decorates the facade and the roofline, made in the blacksmith shop. The south façade, which adjoined ...
0.00216312683 |
a/76512
desrptrko
, decorates the facade and the roofline, made in the blacksmith shop. The south façade, which adjoined another building until its recent ...
0.00216312683 |
a/76221
3026544-lu_revised_notofapp
permits that may be needed which are not included in this application: Building Permit ...
0.00216312683 |
a/77361
january262017approvedminutes
and more effectively using the parking that already exists. • Working on legislation to address the problem of vacant structures awaiting ...
0.00216312683 |
a/108765
adrule9.07
. In buildings required to be sprinklered throughout, a TCO is only permitted for floors where approved, inspected, and ...
0.00216312683 |
a/64130
finalstormwatermanualappendixa
. • “Building permit” means a document issued by SDCI authorizing construction or other specified activity in accordance ...
0.00216312683 |
a/96537
isrdminutes_8-23-22
of the project. The project was presented to the Board on July 12th for Use, Demolition and Final Design. The applicant ...
0.00216312683 |
a/139604
building owner decarb grant 2024 contract template
than in association with the Project, unless otherwise permitted in writing by the City. 12. RECIPIENT’S OBLIGATION TO ...
0.00216312683 |
a/168839
annexiv.esf14.2018-final
and in an equitable way. • Seattle Department of Construction and Inspections o Lead for post-disaster inspections and ...
0.00216312683 |
a/57040
water_project_detail
of Transportation (SDOT), is conducting a plan and study for demolition and replacement of the existing facility. At this ...
0.00216312683 |
a/60931
notes_71014
, or the demolition of garages. A: SDOT is currently working on a Commercial Business District Curbspace Study, which will ...
0.00216312683 |
a/103586
idminutes12-10-19
removal of seven (7) trees on the site and in the right-of-way. A new landscaping plan, including tree replacement, is proposed. The ...
0.00216312683 |
a/73111
spu_w_project_detail
of Transportation, is conducting a plan and study for demolition and replacement of the existing facility. At this early ...
0.00216312683 |
a/60991
2021 update.annexiv.esf14.signed
-disaster inspections and permitting. o Coordinates with Emergency Management on damage assessment information. o ...
0.00216312683 |
a/57058
05-10_wf_adopted_project_detail_final
a plan and study for demolition and replacement of the existing facility. At this early stage,a number of options are ...
0.00216312683 |
a/60808
05-10_proposed_cip_spu_wf_project_detail
, is conducting a plan and study for demolition and replacement of the existing facility. At this early stage, a number of ...
0.00216312683 |
a/60871
annualreportjuly2015june2016
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.00216312683 |
a/77160
pikepinesepachecklist
be considered “vested” and subject to review under current codes and regulations. 10. List any governmental approvals or ...
0.00216312683 |
a/87333
2017-11-06_annexiv.eop_earthquake incident annex
permit. To the degree practical, shelters will be established nearest to the community in need. Residents will be ...
0.00216312683 |
a/57071
adoptedufcmeetingnotes081623
Available CAUTION: External Email Thank SCALE design for retaining exceptional trees at 9017 13th AVE NW With six new townhomes! Building ...
0.00216312683 |
a/148246
constpermitcklistnewcommproject
Occupancy this permitMeans of Egress/Exiting covered Accessibility/Barrier free design covered Mixed construction typeHeight/Area/Type of ...
0.00216312683 |
a/97915
responsesquireparkcomments-2014-02-24
for the traffic circulation. Acquiring new right-of-way could require the demolition of existing housing. PDEIS, Appendix ...
0.00216312683 |
a/77576
pinepineconservationstudyphase2
, downtown development projects currently permitted or in the permit process were evaluated to determine ...
0.00216312683 |
a/87339
newhalem_20221212_sclresponsefercadditionalinfo
Estimate.Cost ItemDescription Item Total 1 Project Management, Site Identification, Design, and ...
0.00216312683 |
a/145996