- sip_general_notes_20240508 shall be on site during construction. 2. A copy of the approved plan must be on site whenever construction is in progress. 3. Errors and ... 0.00220923638 | | a/156775
- psb10-7-15_minutes with these goals, installation of permanent metal security bars in storefront windows is prohibited. Permanent ornamental gates are ... 0.00220923638 | | a/73748
- rko-distributing-company-building-designation , made by the resident blacksmiths, decorates the facade and the roofline, made in the blacksmith shop. The south façade, which adjoined ... 0.00220923638 | | a/76512
- desrptrko , decorates the facade and the roofline, made in the blacksmith shop. The south façade, which adjoined another building until its recent ... 0.00220923638 | | a/76221
- 3026544-lu_revised_notofapp permits that may be needed which are not included in this application: Building Permit ... 0.00220923638 | | a/77361
- january262017approvedminutes and more effectively using the parking that already exists. • Working on legislation to address the problem of vacant structures awaiting ... 0.00220923638 | | a/108765
- finalstormwatermanualappendixa . • “Building permit” means a document issued by SDCI authorizing construction or other specified activity in accordance ... 0.00220923638 | | a/96537
- adrule9.07 , and, if available, two elevators if the TCO area is proposed to be above the 7th floor. 2. In buildings required to be sprinklered ... 0.00220923638 | | a/64130
- lpb060226_guidelines to alternation, demolition, construction, reconstruction, restoration, remodeling, painting, or signing) to the exterior of ... 0.00220923638 | | a/181489
- isrdminutes_8-23-22 of the project. The project was presented to the Board on July 12th for Use, Demolition and Final Design. The applicant ... 0.00220923638 | | a/139604
- building owner decarb grant 2024 contract template than in association with the Project, unless otherwise permitted in writing by the City. 12. RECIPIENT’S OBLIGATION TO ... 0.00220923638 | | a/168839
- lpb040726_guidelinedraft to alternation, demolition, construction, reconstruction, restoration, remodeling, painting, or signing) to the exterior of ... 0.00220923638 | | a/179222
- annexiv.esf14.2018-final and in an equitable way. • Seattle Department of Construction and Inspections o Lead for post-disaster inspections and ... 0.00220923638 | | a/57040
- water_project_detail of Transportation (SDOT), is conducting a plan and study for demolition and replacement of the existing facility. At this ... 0.00220923638 | | a/60931
- notes_71014 , or the demolition of garages. A: SDOT is currently working on a Commercial Business District Curbspace Study, which will ... 0.00220923638 | | a/103586
- idminutes12-10-19 removal of seven (7) trees on the site and in the right-of-way. A new landscaping plan, including tree replacement, is proposed. The ... 0.00220923638 | | a/73111
- spu_w_project_detail of Transportation, is conducting a plan and study for demolition and replacement of the existing facility. At this early ... 0.00220923638 | | a/60991
- 2021 update.annexiv.esf14.signed -disaster inspections and permitting. o Coordinates with Emergency Management on damage assessment information. o ... 0.00220923638 | | a/57058
- 05-10_wf_adopted_project_detail_final a plan and study for demolition and replacement of the existing facility. At this early stage,a number of options are ... 0.00220923638 | | a/60808
- fas-pc-contracting-emergency-red-package-boilerplate ) • @@Technical Specifications (if applicable) • @@Drawings (if applicable) • @@Surveys (if applicable) • @@Existing Conditions (if ... 0.00220923638 | | a/139390
- 05-10_proposed_cip_spu_wf_project_detail , is conducting a plan and study for demolition and replacement of the existing facility. At this early stage, a number of ... 0.00220923638 | | a/60871
- 2026_bdg_contract_template with the Project, unless otherwise permitted in writing by the City. 12. RECIPIENT’S OBLIGATION TO TRACK AND DISBURSE ... 0.00220923638 | | a/179735
- annualreportjuly2015june2016 Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ... 0.00220923638 | | a/77160
- pikepinesepachecklist be considered “vested” and subject to review under current codes and regulations. 10. List any governmental approvals or ... 0.00220923638 | | a/87333
- 2017-11-06_annexiv.eop_earthquake incident annex permit. To the degree practical, shelters will be established nearest to the community in need. Residents will be ... 0.00220923638 | | a/57071