Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [3]
Neighborhoods [1]
Departments [26]
Boards and Commissions [1]
Documents [2601]

Filters

Topics [3]
Neighborhoods [1]
Departments [26]
Boards and Commissions [1]
Documents [2601]

Results

1426 to 1450 of 2644
  1. 2018-04-06 q1 surveillance review report-final (name, driver's license number, expiration date) provided by an applicant for a for-hire license or permit and compares it ...
  2. fas_2328cip and improvements to the Bakun building located on the new Alaskan Way at Pike Street Hillclimb. Acquisition of the building from WSDOT will ...
  3. fascip building located on the new Alaskan Way at Pike Street Hillclimb. Acquisition of the building from WSDOT will fulfill the City's ...
  4. fascap performances on-line. Full construction work includes, but is not limited to, demolition, complete construction of the ...
  5. fascip_000 will be a performance and learning environment that uses the latest audio-visual technology to allow viewers to see performances on-line. ...
  6. 3-2airqualityampghgdeis AGENCYThe PSCAA has local authority for setting regulations and permitting of stationary air pollut-ant sources and ...
  7. 2012srcintro . This chapter establishes the various types of materials, materialsstandards and methods of application permitted for use ...
  8. professionalprojectfinaljuly13 for development is severely constrained, this policy, because it may prevent demolition of affordable housing structures, ...
  9. bon_unit2_st box) †National Historic Register †Local Register of Historic Places Bldg. Permit No.: Date: Jurisdiction (City): ...
  10. rapidride roosevelt nepa ea final , improvements in air quality, and stormwater benefits. With the mitigation proposed by the Project, the development of additional ...
  11. lpbcurrentnom_shannon wilson nom included the following:  City of Seattle Department of Construction and Inspections (SDCI) microfilm permit and drawing ...
  12. dadu_submission070 to be Labor and Industries (L&I) inspected and then craned in if desired/available. Estimate of Construction Cost: This unit has a ...
  13. ebsp sidewalk on its west side. Following demolition of the Alaskan Way Viaduct in 2016, the roadway will be moved further east ...
  14. 300_pine_unit_1 appropriate box) †National Historic Register †Local Register of Historic Places Bldg. Permit No.: Date: Jurisdiction ...
  15. lpb012126gasworksparkpp Complete demolition: Another alternative to eliminate any risk of falls would be to seek complete ...
  16. little brooksepa dns and seating. • Install a covered gathering area. • Construct a community garden space. As noted in the Checklist, the park redevelopment ...
  17. lpb040126gasworksparkpp this alternative does not meet SPR’s objectives at Gas Work Park. 12 | Page Complete demolition: Another alternative to ...
  18. notes20180613 the MUP and building permit in July/August and this will begin the demolition plan. Some preliminary ...
  19. pspbminutes8-1-18 23.66.030 Certificates of Approval required SMC23.66.160 Signs D. Temporary Signs. 1. The following signs are permitted at ...
  20. constructionpermitinitialreviewguide ) category.   ...
  21. tune-ups_dr_2016-01_11-2-16 be provided in the form of a demolition permit or permit application submitted to the ...
  22. context-city-owned-buildings . The system includes all property owned in fee by the City, whetherwithin the City limits or elsewhere in Washington State, as well as ...
  23. ose_directors_rule_2016-01 to Compliance i. Buildings scheduled to be demolished within three years of the tune-up compliance date. Evidence must be provided in the ...
  24. ose_directors_rule_2016-01 to Compliance i. Buildings scheduled to be demolished within three years of the tune-up compliance date. Evidence must be provided in the ...
  25. pspbminutes3-7-18 building, or any portion of a building, …unless a certificate of approval has been issued by the Department of Neighborhoods Director.” ...