Search Results
Results
1326 to 1350 of 2636
- isrd52824_hpr , Seattle September 15, 2023 (rev’d October 30) Fieldwork Studio LLC 3 Permit records at SDCI Microfilm Library include ... 0.002214552 | | a/156682
- 0-0factsheet121814 and Development ▶Land Use ▶Master Use Permit ▶Seattle Design Commission Review ▶Construction ▶Demolition ... 0.002214552 | | a/87749
- sectionsudistrictdrafteisfactsheet ▶Construction ▶Demolition Permit(s) ▶Building Permit ▶Grading / Shoring ... 0.002214552 | | a/87808
- jcc cba 2023 - 2026 ua1 their personal holidays during the eligibility assignment, the employing unit must permit them to use and be compensated ... 0.002214552 | | a/181824
- opcdhousingopportunitieszoningamendmentsdirectorsreport entering the permitting pipeline in the next one to three years. All of the proposed changes would include affordable ... 0.002214552 | | a/173247
- pspb020123reachpp construction sitewithout first having obtained a specific permit from theSeattle Fire Department for these hazardous ... 0.002214552 | | a/137906
- lpbcurrentnom_ingraham_high_school alterations or demolition of the subject building described within this report will require a permit from ... 0.002214552 | | a/74487
- magnuson_phase 2 year 7 2016_monitoring_report-compressed Section 1—Project Overview Magnuson Phase 2 Year 7 Monitoring Report 1 otak (1) Permits: • U.S. Army Corps of ... 0.002214552 | | a/92279
- pedretailareasdirectorsreportandrecommendation in neighborhoods throughout the city. At the same time, concerns were raised about vacant spaces and the need to be more permissive about ... 0.002214552 | | a/88119
- bld050726slimgoodypp ) TRASH COMPARTMENTDEMOLITION FLOORPLANA1.0SCALE:DEMOLITION FLOOR PLAN 11/4" = 1'-0"08.09.2023STFI PERMIT ... 0.002214552 | | a/180696
- tmpsupplmtall2-16final(0) planning, development review, and permitting for light rail station areas on the existing Sound Transit Central Link line ... 0.002214552 | | a/99146
- tmpsupplmtall2-16final , development review, and permitting for light rail station areas on the existing Sound Transit Central Link line and ... 0.002214552 | | a/99147
- tmpsupplmtall2-16final , development review, and permitting for light rail station areas on the existing Sound Transit Central Link line and ... 0.002214552 | | a/105941
- lpbcurrentnom_viewlands_elementary of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed alterations or ... 0.002214552 | | a/75356
- lpbcurrentnom_viewlands_elementary of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed alterations or ... 0.002214552 | | a/74567
- sacupdates20180509 underground • A Utility Major Permit is under review by SDOT. It is expected that another month or two will elapse before ... 0.002213789 | | a/77586
- parks for design and permitting costs reimburses the appropriation from the CRF - Unrestricted Subaccount included in Ordinance ... 0.002213789 | | a/60567
- parks the Interagency Committee for Outdoor Recreation in the amount of $36,000 to pay for design and permitting costs reimburses ... 0.002213789 | | a/60548
- oneseattleplandeisplantsanimals effects on plants and animals would be avoided, minimized, documented, and mitigated to the greatest extent possible through regulatory ... 0.002213789 | | a/153553
- introductiontab Opera House was demolished to make way for the new Marion Oliver McCaw Hall. During demolition, workers discovered a time ... 0.002213789 | | a/60610
- 2021srcintroduction vii SEATTLE CODE SECTION RELOCATIONS—continued 2021 SRC LOCATION 2018 SRC LOCATION R107.6.2 Requirements of rat abatement pro-gram R107.12.2 ... 0.002213789 | | a/162785
- oneseattleplanfeis-chapter3.3-plantsandanimals through regulatory reviews and permitting processes that apply to individual projects (see Section 3.3.3). None of the ... 0.002213789 | | a/165709
- lpbcurrentnom_griffin building or demolition of the subject building described within this report will require a permit from DPD, ... 0.002213789 | | a/74477
- housingchoicesbackgroundreportmay2019 construction permit data, as of April 2019, 18,681 new homes have been permitted but are not yet built. Of ... 0.002213789 | | a/87091
- october272016approvedminutes housing units that have received permits in 2016, 600 were demolitions. The Commissioners thanked Mr. ... 0.00221334188 | | a/109093