Filter Results

1276 to 1300 of 2771
09-11-03
options: Option 1- Accept Committee Recommendation The Board could accept the committee recommendation as originally drafted. However, the ...
0.0021590495 |
a/91944
olympichillsdeparturerecommendationsfeb2015
of the Seattle Municipal code: Building height - Under the Seattle Municipal code, under the existing zoning covering the site maximum ...
0.00215894869 |
a/76920
pspbminutes8-7-19
be required if some structural element is necessary. No walls or roofs of any kind are permitted to enclose sidewalk cafes. ...
0.00215894869 |
a/74088
05-10_dpr_adopted_project_detail_final
of pilings and trusses, demolition and reconstruction of the deteriorated pier and pier shed on the east end of the pier; ...
0.00215894869 |
a/60776
05-10_proposed_cip_dpr_project_detail
and trusses, and demolition and reconstruction of the deteriorated pier and pier shed on the east end of the pier, financed ...
0.00215894869 |
a/60830
dpr_projects
this comprehensive repair including demolition and reconstruction of the deteriorated pier as well as reconstruction of the ...
0.00215894869 |
a/61117
dpr_projects
this comprehensive repair including demolition and reconstruction of the deteriorated pier as well as reconstruction of the ...
0.00215894869 |
a/61186
recommendationreport
classroom space for up to 450 students; • Demolition of existing playcourt and some interior structures; • Seismic ...
0.00215894869 |
a/77936
300_pine_spectaxscope_unit1
for Office R & D Tenant - Levels SB, Basement & Part of Level 2: Demolition (Complete): Demolition of ...
0.00215894869 |
a/75093
sw_plan_015860
reuse/waste reduction/recycling of C&D waste through the modification of the City's current demolition ...
0.00215894869 |
a/113503
solidwasteplanapdxbzwresolution30990
A. The City will increase reuse/waste reduction/recycling of C&D waste through the modification of the City's current ...
0.00215894869 |
a/113174
2022solidwaste-chapter2-maximizingmeasuringimpact-movingupstreamb ...
and demolition permits can mitigate the effect of changes in construction activity on tonnage that make it ...
0.00215894869 |
a/146060
2022solidwastedraftch2
picture of Seattle’s performance using total tons landfilled and generated. For C&D debris, scaling tonnages by the dollar value of ...
0.00215894869 |
a/126507
lpbcurrentnom_showbox_historic_seattle
, the main entrance, and the second-floor performance volume. • 1959: Rebuild of the north wall following demolition of ...
0.00215894869 |
a/74540
fortlawton_dseis_april2025
, WA 98124-4725 Telephone: 206.684.5081 Email: Jessica.gomez@seattle.gov Required Approvals and/or Permits Preliminary ...
0.00215894869 |
a/168111
bgt_hazmat_final
the RCRA SQG and Toxics cleanup programs and active under the Water Quality program with a general stormwater discharge ...
0.00215894869 |
a/100456
sepa_checklist_beps
anticipates building permit applications for building retrofits and mechanical system replacements from buildings that are ...
0.00215870515 |
a/143303
introductiontab
Linda Wokal Carrie McCann Helen Welborn . On the Cover In January 2002, the Seattle Center Opera House was demolished to ...
0.00215870515 |
a/60677
psbminutes11-15-17
features listed in subsection 23.66.140.C.4.d. In no circumstances shall the height of rooftop screening exceed 15 feet above the maximum ...
0.00215870515 |
a/73802
isrd6-22-21
and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition SMC ...
0.00215870515 |
a/73180
2018sfcchapter4
each otherin case of fire to the extent their physical and mental abilities permit them to do so without additional ...
0.00215870515 |
a/97728
isrd011023_sr
23.66.304 – International District Residential (IDM) Zone goals and objectives SMC 23.66.318 - Demolition SMC 23.66.320 - ...
0.00215870515 |
a/137237
lpbcurrentnom_shearwater_community_decatur_annex
“Appendix A” report. 1960, Permit # BN 3189: A small storage shed was moved from the western end of the subject building, ...
0.00215870515 |
a/74538
c3_delivery_assessment_executive_summary_10312023
)Environmental Review & Permit UpdatesFinal DesignConstruction PhaseEarly Works (Jackson Street Bridges, Areaways, ...
0.00215870515 |
a/151746
parks
Master Plan including refinement of the financial plan, review of the process for transferring governance, program planning and completion ...
0.00215845369 |
a/60388