Filter Results

1201 to 1225 of 2574
isrd20251023min
the timeline for demolition. AP Alec Thomas, Great Expectations, shared that the City is trying to expediate the ...
0.00220424822 |
a/177206
the people's wall nom_final_low res
Wall exists today was seized by the federal government39 and razed a few years later in 197340. According to Dixon, the ...
0.00220424822 |
a/178704
lpb041526thepeopleswallnom
today was seized by the federal government39 and razed a few years later in 197340. According to Dixon, the demolition was ...
0.00220424822 |
a/179648
supply-laundry-designation
to increase, as evident in building permit records and historic photographs. Auto warehouses and retail showrooms became ...
0.002203799 |
a/76559
desrptsupplylaundry
, as evident in building permit records and historic photographs. Auto warehouses and retail showrooms became common along ...
0.002203799 |
a/76273
psb3-18-15_minutes(0)
by the Pioneer Square Preservation Board or the International Special Review District Board. A structure for which an application for ...
0.002203799 |
a/73761
psb3-18-15_minutes
by the Pioneer Square Preservation Board or the International Special Review District Board. A structure for which an application for ...
0.002203799 |
a/73762
industrialmaritimestrategysportsdraftordinance
. N.S.L., except 30,000 sq. ft. in IC 85-160 zone Key for Table A for 23.50.027 N.S.L. = No Size Limit * Where permitted ...
0.002203799 |
a/87136
spab minutes december 2018
is almost all bad for peds and unremarked upon. Peds are about 20% of trips, but SDOT collects no data on incidents on sidewalks. ○Bike ...
0.002203799 |
a/107889
spab minutes december 2018
is almost all bad for peds and unremarked upon. Peds are about 20% of trips, but SDOT collects no data on incidents on sidewalks. ○Bike ...
0.002203799 |
a/103861
psbminutes4-5-17
, street level uses shall have highly visible linkages with the street. Windows at street level shall permit visibility ...
0.002203799 |
a/73810
gb-ti-guide10_wastemgmt
a Zero Waste Strategy with a 70% recycling target by 2025. Many construction, demolition and land-clearing waste materials ...
0.002203799 |
a/88391
psb0405231yeslersr
, and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ...
0.002203799 |
a/140571
2024_oh_mha_annualreport
permits issued in 2024 totaled $24.4 million, whereas MHA contributions in years 2020-2023, following City Council adoption ...
0.002203799 |
a/170465
sdot_2530proposedcip
through public engagement, design review, permitting and construction support for transit stations as well as constructing ...
0.002203799 |
a/160792
seattle_city_light
in Newhalem and Diablo neighborhoods. The Skagit Facilities Plan include demolition of vacant structures that are ...
0.002203799 |
a/61911
seattle_city_light
facilities in Newhalem and Diablo neighborhoods. The Skagit Facilities Plan include demolition of vacant structures that ...
0.002203799 |
a/61922
sdot_cip
for securing future funding through grants, partnerships, and other sources. The Sound Transit 3 Program is now being led by OWCPST and will ...
0.002203799 |
a/173318
sdot_2530adoptedcip
for Sound Transit 3 projects through public engagement, design review, permitting, and construction support for transit ...
0.002203799 |
a/166662
lpbcurrentnom_sheridan
alterations or demolition of the subject building described within this report will require a permit from ...
0.002203799 |
a/74539
duwamish-valley-vision-report-2009
contamination in place that would not permit redevelopment of the property for any recreational, commercial or residential ...
0.002203799 |
a/57477
caoannualreport2011
. The cases included housing code violations, exterior maintenance and junk storage violations, emergency orders, and unfi t vacant building ...
0.002203799 |
a/50257
ballardwideningfinalsubmittal
, elevator, limited use elevator, or platform lift must be provided.” (R204, PROWAG)  Maximum cross-slopes of proposed design shall not ...
0.002203799 |
a/99401
psb041923reachpp
heatingor drying shall be conducted on any construction sitewithout first having obtained a specific permit from theSeattle ...
0.002203799 |
a/141134
lpb053124universitylibrarybp
+ EXISTING CONDITIONS3. DESIGN PROPOSALSAPPENDIX• SITE PLANTINGS (NEW, EXISTING, AND REMOVED)• EXTERIOR TRASH ENCLOSURE• PREVIOUS BRIEFING ...
0.002203799 |
a/156749