Filter Results

1176 to 1200 of 2582
05-10_proposed_cip_dpr_project_detail
and trusses, and demolition and reconstruction of the deteriorated pier and pier shed on the east end of the pier, financed ...
0.00220477465 |
a/60830
dpr_projects
this comprehensive repair including demolition and reconstruction of the deteriorated pier as well as reconstruction of the ...
0.00220477465 |
a/61117
dpr_projects
this comprehensive repair including demolition and reconstruction of the deteriorated pier as well as reconstruction of the ...
0.00220477465 |
a/61186
olympichillsdeparturerecommendationsfeb2015
of the Seattle Municipal code: Building height - Under the Seattle Municipal code, under the existing zoning covering the site maximum ...
0.00220477465 |
a/76920
bgt_hazmat_final
the RCRA SQG and Toxics cleanup programs and active under the Water Quality program with a general stormwater discharge ...
0.00220477465 |
a/100456
recommendationreport
classroom space for up to 450 students; • Demolition of existing playcourt and some interior structures; • Seismic ...
0.00220477465 |
a/77936
300_pine_spectaxscope_unit1
for Office R & D Tenant - Levels SB, Basement & Part of Level 2: Demolition (Complete): Demolition of ...
0.00220477465 |
a/75093
fortlawton_dseis_april2025
, WA 98124-4725 Telephone: 206.684.5081 Email: Jessica.gomez@seattle.gov Required Approvals and/or Permits Preliminary ...
0.00220477465 |
a/168111
lpbcurrentnom_showbox_historic_seattle
, the main entrance, and the second-floor performance volume. • 1959: Rebuild of the north wall following demolition of ...
0.00220477465 |
a/74540
sw public meeting slides january 14 2026
Policy AdvisorMatthew Bateman, PESDCI Senior Drainage ReviewerJess HuybregtsSPU Stormwater Permit ManagerDate ...
0.00220477465 |
a/177010
2022-solid-waste-plan-update_chapter-2_maximizing-measuring-impac ...
by the dollar value of construction and demolition permits can mitigate the effect of changes in ...
0.00220477465 |
a/146060
2018sfcchapter4
each otherin case of fire to the extent their physical and mental abilities permit them to do so without additional ...
0.00220451574 |
a/97728
isrd011023_sr
23.66.304 – International District Residential (IDM) Zone goals and objectives SMC 23.66.318 - Demolition SMC 23.66.320 - ...
0.00220451574 |
a/137237
psbminutes11-15-17
features listed in subsection 23.66.140.C.4.d. In no circumstances shall the height of rooftop screening exceed 15 feet above the maximum ...
0.00220451574 |
a/73802
isrd6-22-21
and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition SMC ...
0.00220451574 |
a/73180
sepa_checklist_beps
anticipates building permit applications for building retrofits and mechanical system replacements from buildings that are ...
0.00220451574 |
a/143303
introductiontab
Linda Wokal Carrie McCann Helen Welborn . On the Cover In January 2002, the Seattle Center Opera House was demolished to ...
0.00220451574 |
a/60677
c3_delivery_assessment_executive_summary_10312023
)Environmental Review & Permit UpdatesFinal DesignConstruction PhaseEarly Works (Jackson Street Bridges, Areaways, ...
0.00220451574 |
a/151746
lpbcurrentnom_shearwater_community_decatur_annex
“Appendix A” report. 1960, Permit # BN 3189: A small storage shed was moved from the western end of the subject building, ...
0.00220451574 |
a/74538
psbminutes11-1-17
windows designed to display signage. (7/99) Letter size in sign bands shall be permitted to a maximum of 12 inches. Letters ...
0.00220424822 |
a/73801
adoptedufcmeetingnotes071024
/SCIP briefing on City work Chat comments: - Does WASHDOT need permits for removing trees? - It’s my understanding that ...
0.00220424822 |
a/159448
parks
Master Plan including refinement of the financial plan, review of the process for transferring governance, program planning and completion ...
0.00220424822 |
a/60388
opcdhousingchoicespublicengagementsummary
of respondents supportive or very supportive. »Most people supported making it easier and faster to build housing. Many people felt ...
0.00220424822 |
a/87093
housingchoicesbackgroundreport
and amenities. In 2018, 82 percent of new units were built in designated urban villages.FIGURE 2.1 Number and Size of Units Built from 2010 ...
0.00220424822 |
a/87090
psb1yeslerpp
space.Supply Laundry Building participated in the National Trust for Historic Preservation’s Green Lab pilot program for outcome-based ...
0.00220424822 |
a/140569