Filter Results

1126 to 1150 of 2668
2019 suip district 7 projects
WFALSE2019-01-072019-04-07Century LinkGILMAN AVE WREMO POLE@ 3857 Gilman Ave WFALSE2019-02-012019-06-29Century LinkAerial - Alaskan Way ...
0.00217211782 |
a/105841
pspbminutes_8-17-22
. 081722.2 APPROVAL OF MINUTES: June 15, 2022 081722.3 APPLICATIONS FOR CERTIFICATE OF APPROVAL 081722.31 Waterfront East West ...
0.00217211782 |
a/139597
2021sbcindex
Demolition ... ........................................................................ 107.2.3 Penetrations ...
0.00217211782 |
a/162603
lpbcurrentnom_westwoodlandelementaryschool
Elementary: original building, demolition, 1990 ................................ A-55 Figure 102 • West Woodland ...
0.00217211782 |
a/74575
15thavewnw_fullprojectdesigns_rc0481andtrc0087_100percentsubmitta ...
CONTRACTOR MUST COMPLY WITH ALL NPDES PERMIT REQUIREMENTS. SEESECTIONS 1-07.15 AND 8-01.1.FOR INLET CONNECTION BEND AND ...
0.00217211782 |
a/145007
psb090325prefontaineps
SHEET17C-101UTILITY PLAN18C-102UTILITY DETAILSMECHANICAL19M-001GENERAL INFORMATION20M-002SPECIFICATIONS21M-101MECHANICAL ...
0.00217211782 |
a/172562
2017-04-29 seattle partners rfp response - redevelopment of ...
encompassed public affairs, public relations and marketing of the residences, and subsequently, the hotel. The team guided the project ...
0.00217211782 |
a/56130
lpbcurrentnom_northgate_lmn
adequacy. As any proposed alterations or demolition of the subject building described within this report will require a ...
0.00217211782 |
a/74516
lpbnorthgate lmn revised 1-17-20
adequacy. As any proposed alterations or demolition of the subject building described within this report will require a ...
0.00217211782 |
a/74577
spu-sbp_appendix-a-2025-2030-highlighted-initiatives-and-investme ...
• Draft a Duwamish Valley Master Plan, including land use/zoning, affordable housing, open space, shoreline master program and associated ...
0.00217211782 |
a/157121
opcdregionalcentersplanningdowntownappendixlandusereport
Square from development pressures associated with the stadium to its south and the skyscrapers to its north. The Board reviews any ...
0.00217211782 |
a/176009
land-use-and-historic-preservation-procedures-extension_proposed- ...
23.41.004.A.5 3 shall be exempt from design review if the applicant files a complete building permit application 4 while ...
0.00217210921 |
a/53394
isrd52824_sr
– International Special Review District goals and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC ...
0.00217210921 |
a/156715
sdotcip
and Recreation (Waterfront Pier projects, Aquarium Expansion). The Alaskan Way Viaduct Replacement Project includes SDOT’s costs related to ...
0.00217210921 |
a/63403
summit_consultantcontract_pos
LLC000017557712/06/20164/30/2017ClosedIndependent IT Project Quality Assurance (IIPQA) Services for the Permitting, ...
0.00217210921 |
a/58666
maplewoodplayfielddns-signed
. Expected construction activities include demolition of existing site elements, machine excavation and grading, ...
0.00217210921 |
a/143667
sdotcap
. Grade Separation project, implementing a more responsive permitting system and completing regional projects such as ...
0.00217210921 |
a/63082
sdotcip
(Waterfront Pier projects, Aquarium Expansion). The Alaskan Way Viaduct Replacement Project includes SDOT’s costs related to design review, ...
0.00217210921 |
a/63418
sdotcip_000
. Grade Separation project, implementing a more responsive permitting system and completing regional projects such as ...
0.00217210921 |
a/63153
lpb080322pioneersandpres
FOR CONSTRUCTIONSDCI PROJECT# 3035742MASTER BUILDING PERMIT #6696905-PH6696906-PHSDCI DEDICATED APPROVAL STAMP SPACEFOR ...
0.00217210921 |
a/131769
2023-wastepreventionrecyclingreport
decreased by 25,161 tons (-6.8%) from 2022 levels. This decline indicates an overall reduction in construction and ...
0.00217210921 |
a/163319
staffreport
for demolition and new construction. In this case the building has been highly altered. The code still requires that the ...
0.00217179186 |
a/74253
korn_sr
at 117 Occidental Ave S is non-contributing to the National Register and proposed for demolition and new construction. In ...
0.00217179186 |
a/74161
2013 cap progress report final
79-82 in Appendix A.) Additionally, new building developments can use Green Building permit incentives like Priority Green ...
0.00217179186 |
a/173102
framework_plan_full
MILEFramework Plan2:35 CENTRAL WATERFRONT FRAMEWORKThe demolition of the viaduct presents Seattle with an opportunity to ...
0.00217179186 |
a/171983