Filter Results

1001 to 1025 of 2395
2026swmanualsummaryofchanges2021to2026
) Various • Minor terminology revisions throughout. • Added and updated definitions and criteria for clarity and to be consistent with the ...
0.00220558932 |
a/182326
cowen park bridge project sepa checklist
months pending approvals and permits. 7. Do you have any plans for future additions, expansion, or further activity ...
0.00220558932 |
a/100838
greenhomeguide-landscape
outbuildings, and retaining walls commonly require permits). To helphomeowners and businesses comply with building codes, ...
0.00220558932 |
a/88403
codecompliance_homefair2025
of buildings.You need to get a permit for most construction projects that involve:•New Construction•Alteration or ...
0.00220558932 |
a/175401
2022-solid-waste-plan-update_chapter-7_solid-waste-transfer-proce ...
. Table 7.1 lists the facilities in Seattle's solid waste system that handle residential, commercial, and self-haul waste. Facilities that ...
0.00220558932 |
a/146062
lpbcurrentnom_prince_hall_nom
projects over 4,000 square feet in area. As any proposed alterations or demolition of the subject building described within ...
0.00220558932 |
a/74524
lpbcurrentnom_e_pine_substation_nom
.  Additional information and valuable review comments were provided by SCL Historic Resource Specialist/Architectural Historian Rebecca Oss ...
0.00220558932 |
a/74462
616-8th-ave-s_briefing-packet
the needs of the neighborhood.DETAILED DESCRIPTION OF THE PROJECT1. The proposed development will include demolition of the ...
0.00220558932 |
a/73306
lpbcurrentnom_blackford
and date from October 2019. Sources used in this report include: • Copies of the original drawing set and historic building ...
0.00220558932 |
a/75352
lpbcurrentnom_blackford
and date from October 2019. Sources used in this report include: • Copies of the original drawing set and historic building ...
0.00220558932 |
a/74431
isrd_word_4.29.19_guideline_draft
Section 23.66.318 – Demolition approval. ■ Street Use Permit – A COA is required for changes to the ...
0.002204941 |
a/126593
nfpa130amendments2012sfc
modification of any structure, provisions of ((NFPA 241,Standard for Safeguarding Construction, Alteration, and Demolition ...
0.002204882 |
a/64235
pspbminutes_10-5-22
the non-historical interior demolition has started; major construction will begin in December. He said this is the final ...
0.002204882 |
a/139594
05-10_dwf_adopted_project_detail_final
of Transportation (WSDOT) and the City of Seattle are co-leads for the project. WDSOT, in conjunction with the Seattle Department of ...
0.002204882 |
a/60779
05-10_proposed_cip_spu_dw_project_detail
), is conducting a plan and study for demolition and replacement of the existing facility. At this early stage, a number ...
0.002204882 |
a/60862
2004annualreportweb
taxpayer investments. Additionally, Street Use issued morethan 18,000 permits and streamlined its ...
0.002204882 |
a/99358
southparktechnicalanalysissept2022
with the permitting and scheduling of large infrastructure projects; and the standards, design processes, methodologies and ...
0.002204882 |
a/133974
adu-eis-scoping-report
owners to permit and build ADUs• Increasing the number and variety of housing choices available in single-family zones• ...
0.002204882 |
a/53189
sdot
movable bridges and traffic signals, cleaning streets, repairing potholes, issuing permits, maintaining trees, and ...
0.002204882 |
a/134200
sdot_2023adopted_2024endorsed
operating the city's movable bridges and traffic signals, cleaning streets, repairing potholes, issuing permits, ...
0.002204882 |
a/138598
spucip
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.002204882 |
a/147695
spu_2328cip
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.002204882 |
a/138622
spucip
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.002204882 |
a/134226
spu_2429adoptedcip
. These systems include approximately: • 448 miles of sanitary sewers • 968 miles of combined sewers • 67 Pump Stations • 5.5 miles of ...
0.002204882 |
a/153297
spufinal2019_wsp_volume1
water right permits. 1.1.2 System Description Today, SPU’s regional water system is the largest in Washington State. SPU ...
0.002204882 |
a/113234