Filter Results

926 to 950 of 2775
oneseattleplandeispublicservices
Permitted Facilities in Seattle: Operator Facility Type Seattle Public Utilities North Transfer Station ▪ City-contracted ...
0.00207168586 |
a/153558
seattleindustrialfeischapter1
buildings for landmark review when demolition of properties that are over 50 years old is proposed, regardless of City ...
0.00207168586 |
a/134319
seattle industrial deis ch 1 2021_12
of residential uses.Summary ƒWide range of light and heavy industrial uses permitted. ƒStrict size of use and maximum FAR ...
0.00207168586 |
a/87142
sepa determination - mha dtslu implementation
housing, providing protections for tenants and low-income homeowners, streamlining permitting systems to reduce housing ...
0.002071683 |
a/65083
2024 parks and open space plan sepa dns
to continue to 2024 Parks and Open Space Plan January 30, 2024 Page 2 monitor and fill in the usable open space gaps as funding ...
0.002071683 |
a/152245
eastlake-plan
on these arterials. [Eastlake Community Council andEastlake Business Association to follow up] [Key]The City of Seattle should work with ...
0.002071683 |
a/78402
streetactivationsepachecklist
, explain. None. 10. List any government approvals or permits that will be needed for your proposal, if known. ...
0.00207167352 |
a/151644
spu_drainage_wastewater_projects
discharge to Salmon Bay. Major work includes flow monitoring, system modeling, facility planning, preliminary engineering, design, ...
0.00207167352 |
a/61272
2020 mimp annual report final(0)
’s Major Institution Master Plan (MIMP) for its Hospital Expansion Project. On November 29, 2010, the Department of Planning and ...
0.00207167352 |
a/77069
spu_drainage_wastewater_projects
150/151 and 152, which discharge to Salmon Bay. Major work includes flow monitoring, system modeling, facility planning, preliminary ...
0.00207167352 |
a/61330
2012seccommercialchapter1
for the effective use and conservation ofenergy over the useful life of each building. This code isintended to provide flexibility to ...
0.00207167352 |
a/97465
longfellowcreek_nds_sepachecklist
by this proposal. 10. List any government approvals or permits that will be needed for your proposal, if known. The ...
0.00207167352 |
a/115125
2017annualrecyclingreport06292018final
in the Construction & Demolition (C&D) sector are tracked and reported separately and a separate recycling rate is ...
0.00207167352 |
a/112710
psb040523unionhotelpp
#MUP #1 09/28/22 WDW COST EST.2 01/18/23 PERMIT 3 03/06/23 WINDOW SURVEY3/6/2023 1:38:54 ...
0.00207167352 |
a/140570
psb032923unionhotelpp
#MUP #1 09/28/22 WDW COST EST.2 01/18/23 PERMIT 3 03/06/23 WINDOW SURVEY3/6/2023 1:38:54 ...
0.00207167352 |
a/140297
2003sbc
“SeattleBuildingCode”andmaybesocited,andisreferredtohereinas“thiscode.”101.2Scope.Theprovisionsofthiscodeshallapplytothecon-struction,altera ...
0.00207167352 |
a/97324
2020mimpannualreportfinal
Major Institution Master Plan (MIMP) for its Hospital Expansion Project. On November 29, 2010, the Department of Planning and Development ...
0.00207167352 |
a/77071
desrptfederalreservebank
that the Federal Reserve Bank of San Francisco, as a federal agency, did not always obtain building permits for of its ...
0.00207162462 |
a/76006
sdotcip
public engagement, design review, permitting and construction support for transit stations. As well as constructing ...
0.00207162462 |
a/127136
sdot
lanes, in-lane stops/bus bulbs, and bus stop and station access amenities. SDOT also provides support for Sound Transit projects through ...
0.00207162462 |
a/63567
appendix_a_adu_feis_2018
be demolished to make room for a DADU, so the footprint determines the demolition cost.Size of daylight basement, if ...
0.00207162462 |
a/53198
2017_0629 mha draft eis public hearing boards
to Displaced Low-Income Households due to Demolition in the Study AreaAll estimates are for the period 2017–2035. ...
0.00207162462 |
a/64998
levy-oversight-committee-minutes-2009
are housed in temporary facilities. Fire Station 21 (Greenwood) The Miller Hull Partnership is in the design development phase of design on ...
0.00207153615 |
a/64622
seattle_public_utilities
• 968 miles of combined sewers • 68 pump stations • 90 permitted combined sewer overflow outfalls • 342 storm drain ...
0.00207153615 |
a/61794
utilities
of combined sewers • 68 pump stations • 92 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 ...
0.00207153615 |
a/61807