Filter Results

851 to 875 of 1664
fas_2530proposedcip
and operations for Waterfront Park. The project also fulfills the City’s permitting commitments to the Muckleshoot Tribe ...
0.00215339847 |
a/160781
greenhomeguide-roofing
about permits inSeattle or whether a particular material or design complies with code, contact theDepartment of Planning ...
0.00215339847 |
a/88408
2018-work-program
of the Seattle Aquarium; (4) demolition of the viaduct and decommissioning of the Battery Street Tunnel; (5) construction ...
0.00215339847 |
a/53343
uw-annual-report-2022
;  There have been no changes to the proposed development schedule set forth in the Master Plan. 6  The CMP permits ...
0.00215339847 |
a/130971
fas_2530adoptedcip
occupancy. The project is intended to provide dedicated space to house the staff for on-going maintenance and operations for Waterfront ...
0.00215339847 |
a/166653
2017-11-06_annexiv.eop
and stabilized, the number of shelters established and their capacity will be increased as rapidly as available resources ...
0.00215339847 |
a/57011
2017-11-06_annexiv.eop(0)
and stabilized, the number of shelters established and their capacity will be increased as rapidly as available resources ...
0.00215339847 |
a/56704
2017-11-06_annexiv.eop
and stabilized, the number of shelters established and their capacity will be increased as rapidly as available resources ...
0.00215339847 |
a/56705
cucac report august 2017_1
development in the University District Northwest Urban Center Village (UDNUCV), including the number and types of units built, the number, ...
0.00215339847 |
a/77703
washington_park_stormwater_checklist
covered by this proposal. 10. List any government approvals or permits that will be needed for your proposal, if known. ...
0.00215339847 |
a/113306
dpdp021679
from regional sources, decreased impervious surfaces by 16%, and recycled 87% of construction and demolition waste. ...
0.00215339847 |
a/88291
dpdp021679
from regional sources, decreased impervious surfaces by 16%, and recycled 87% of construction and demolition waste. ...
0.00215339847 |
a/57394
uw-annual-report-2023
forth in the Master Plan.  The CMP permits the University to develop up to 6 million square feet of space during the ...
0.00215339847 |
a/143188
11pumpstationsfinalredacted
untreated discharge per permitted outfall per year. This limit is based on eliminating the basin’s control volume. Control ...
0.00215339847 |
a/154312
oneseattleplanmiddlehousingreporteconorthwest
for residential use, unless existing zoning permits greater densities: » Four units per lot as the minimum base density » ...
0.00215339847 |
a/167370
psb041625prefontainfountainbriefsr
or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and no ...
0.00215339847 |
a/167756
context-university-district
review during permit processing when proposed projects affect olderbuildings in the area.2Information gathered during the ...
0.00215214421 |
a/74347
lpbminutes11-21-18
a demolition permit. She said that Seattle Public Schools submitted an Appendix A to the Historic ...
0.00215214421 |
a/75007
pspbminutes6-6-18
and wooden or cast-iron storefronts are also typically used throughout the District. Synthetic stucco siding materials are generally not ...
0.00215214421 |
a/74082
lpbminutes6-5-19
demolition of the building to the north. This replaced the former wall in its same location and was designed by architects ...
0.00215214421 |
a/75040
lpbminutes_1-19-22
District Demolition of garage (retroactive) and proposed new addition Ms. Nashem introduced the project and explained ...
0.00215214421 |
a/133699
lhes departure matrix
% lot coverage for structure of more than one-story. Lot coverage restrictions may be waived by the director as a Type I decision when ...
0.00215214421 |
a/76819
oneseattleplanantidisplacementframework
outside their control. It can occur in several ways: • Physical displacement can occur through eviction, acquisition, rehabilitation, or ...
0.00215214421 |
a/154390
fascap
chargespaid by City departments. Some projects planned for 2017-2018 include:oSeattle Municipal Tower (SMT) chiller plant replacementoSMT 14 ...
0.00215214421 |
a/62718
fascap
chargespaid by City departments. Some projects planned for 2017-2018 include:oSeattle Municipal Tower (SMT) chiller plant replacementoSMT 14 ...
0.00215214421 |
a/62703