Filter Results

726 to 750 of 1664
pspb060122_section_3
of near-by contributing and supporting buildings. Such characteristics are further discussed in this Section 2 (Guidelines for ...
0.00215584482 |
a/128629
kingcountycapacitychargenonresidential
Permit Final Date: ___________________________________ Side Sewer or Building Permit Number: ...
0.00215584482 |
a/98096
23rdavecorridorsepachecklist
. No, there are no known applications pending for government approvals of other proposals directly affecting the property covered by this ...
0.00215584482 |
a/102742
ebr_exemption form_new(0)
square feet (Supporting documentation is required) Building vacant due to renovation, or pending demolition (Please also ...
0.00215584482 |
a/90340
newhalem_20240329_fercdraftea
surrender application filed on January 28, 2022. Document Accession #: 20240329-3011 Filed Date: 03/29/2024 4 schedule, necessary ...
0.00215584482 |
a/154865
102109swacmeetingnotes
into contract negotiations. Monthly Topics: 3. Construction & Demolition Debris - Briefing  Gabriella Uhlar-Hefner ...
0.00215562456 |
a/110450
ratabatementdeclaration
with Seattle Building Code 3303.15 and Seattle Residential Code R107.12 Demolition Permit No. ...
0.00215562456 |
a/97995
ballard-application
:_____________________________________*************************************************************************************•Approval ...
0.00215562456 |
a/72638
context-denny-triangle
Gethsemane Lutheran Church site in 1901. This second wooden church remained on the site until its demolition during the ...
0.00215562456 |
a/74335
multifamilysepachecklist
application. 10. List any governmental approvals or permits that will be needed for your proposal, if known: The proposed ...
0.00215562456 |
a/88004
minutes_6221
introduced the project which would involve partial demolition and new construction. He introduced the owner of the ...
0.00215562456 |
a/74179
pspb6-2-21
introduced the project which would involve partial demolition and new construction. He introduced the owner of the ...
0.00215562456 |
a/73831
pspb6-2-21(0)
introduced the project which would involve partial demolition and new construction. He introduced the owner of the ...
0.00215562456 |
a/73830
pikepinephase3sepachecklist
approvals or permits that will be needed for your proposal, if known: The proposed amendments to the land Use Code will ...
0.00215562456 |
a/87332
fascip
and construction of a new Fire Station 31 to replace the existing facility and the demolition of the existing Fire Station ...
0.00215562456 |
a/63397
fascip
, design and construction of a new Fire Station 31 to replace the existing facility and the demolition of the existing Fire ...
0.00215562456 |
a/63413
sw_plan_027198
for the municipal solid waste (MSW) stream and one for the construction and demolition debris (C&D) waste stream. The MSW ...
0.00215562456 |
a/113512
notes20180613
the MUP and building permit in July/August and this will begin the demolition plan. Some preliminary ...
0.00215490349 |
a/77484
102010swacminutes
Directives, and action taken or proposed. These included: Increase the reuse, waste reduction and recycling of C&D waste by modification of ...
0.00215490349 |
a/110448
102010swacminutes
Directives, and action taken or proposed. These included: Increase the reuse, waste reduction and recycling of C&D waste by modification of ...
0.00215490349 |
a/114153
att-1_summary-of-environmental-protections-v1a
impacts from fugitive dust and other potentially hazardous demolition waste materials, such as lead. • PSCAA ...
0.00215490349 |
a/140990
lpb9-7-16_minutes
said a demolition permit was issued and they are in the process of hazardous waste abatement and they will ...
0.00215490349 |
a/74704
amendments_summary_11-03-2021
if they are inserted into a Project Manual (pre advertisement, via the addendum process or through a change order). For SDOT issued Street ...
0.00215490349 |
a/113748
ovg seattle center - part 1 of responses to city follow-up ...
apprised of the evolution of Construction Documents. OVG’s objective would be to coordinate with the City on a phased Building Permi ...
0.00215490349 |
a/56268
psb11-4-15_minutes
that enhances the pedestrian environment and promotes public safety, street level uses shall have highly visible linkages with the street. ...
0.00215490349 |
a/73752