You just searched for:
Search
Filter Results
51 to 75 of 2775
City Landmarks
https://seattle.gov/neighborhoods/historic-preservation/city-landmarks
Learn about Seattle's 400+ landmarks. Since 1973, Seattle has designated more than 400 individual sites, buildings, vehicles, vessels, and ...
0.003951864 | 20240720T20:05:40
x135874
Magnuson Park Play Area Renovation
https://seattle.gov/parks/about-us/projects/magnuson-park-play-area-renovat ...
This improvement project consists of four elements. The play area improvements, restroom construction, and demolition of a damaged restroom ...
0.003951864 | 20240720T20:06:38
x144364
Director's Rule 5-276
https://seattle.gov/city-finance/about-city-finance/directors-rules/directo ...
How the business license tax applies to constructing and repairing of new or existing buildings or other structures upon real property, ...
0.003951864 | 20240720T20:07:08
x144601
Director's Rule 5-481
https://seattle.gov/city-finance/about-city-finance/directors-rules/directo ...
This rule provides an overview of the taxation of motor carriers and trucking activities within the City of Seattle as of July 1, 2002. ...
0.003951864 | 20240720T20:06:55
x144662
Urban Refugees: The 1978 Housing Crisis
https://seattle.gov/cityarchives/exhibits-and-education/online-exhibits/urb ...
The conversion of apartment buildings to condominiums caused a housing crunch for renters in the late 1970s. In the middle of an intense ...
0.003951864 | 20240720T20:06:02
x64274
Contact Us
https://seattle.gov/fire/about-us/contact-us
Contact Us Emergency: 911 Non-Emergency: (206) 386-1400 Address: Headquarters & Stations Topic Description ...
0.003951864 | 20240720T20:07:06
x83312
draft2021seattlebuildingcode
https://seattle.gov/documents/departments/sdci/codes/changestocodes/2021sea ...
done contrary to the provisions of this code or contrary to a permit issued by the building official, or in the event of ...
0.00227225362 |
a/149186
draft2021seattlefirecode
https://seattle.gov/documents/departments/sdci/codes/changestocodes/2021sea ...
by the fire code official, a change of occupancy shall be permitted without complying with the requirements of this code ...
0.00226672087 |
a/149187
2018_sfc_2021_01_15
https://seattle.gov/documents/departments/fire/business/fire code and ...
permit fees.))[S][A] 106.((4))3 Related fees. The payment of the fee for the construction, alteration, removal or ...
0.00223569479 |
a/64288
northlot_phase1_dwgs
https://seattle.gov/documents/departments/neighborhoods/historicpreservatio ...
DURING DEMOLITION WORK.14. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS (EXCLUDING SDCI DEMO ...
0.00222763 |
a/75373
sccmimpprelimdrafteisappendixgeologichazardsandecareviewreport202 ...
https://seattle.gov/documents/departments/neighborhoods/majorinstitutions/s ...
been excavated and then placed in a new location, or imported soil that has typically been placed to regrade and shape the land. It may also ...
0.002225634 |
a/138073
2008electricalcodereplacementpages
https://seattle.gov/documents/departments/sdci/codes/2008electricalcoderepl ...
the Period of Construction. Temporary electric power and lighting installations shall be permitted during the period of ...
0.00221695378 |
a/96412
2014standardspecifications
https://seattle.gov/documents/departments/spu/engineering/2014standardspeci ...
process. All water used in the Hydro-Demolition process shall be potable. Stream or lake water will not be ...
0.00219947821 |
a/113664
2023-standard-specifications
https://seattle.gov/documents/departments/spu/engineering/specifications-pl ...
is not permitted. All bridge drains and other outlets within 100 feet of the Hydro-Demolition machine must ...
0.002194328 |
a/140217
2023_proposed_standard_specifications_publish_ready
https://seattle.gov/documents/departments/spu/engineering/specifications-pl ...
production rate of 12 250 square feet per hour during the deck scarifying process. 13 All water used in the ...
0.00219398551 |
a/135541
2011_standard_specifications
https://seattle.gov/documents/departments/spu/engineering/2011_standard_spe ...
by private parties at their own expense under authority granted by ordinance of the City Council or by permit from the ...
0.00219181785 |
a/113660
treeregsconstitutentemailsthrough011320v2
https://seattle.gov/documents/departments/urbanforestrycommission/resources ...
’s time may have finally run out. They have their demolition and construction permits and "No Parking ...
0.002191412 |
a/119478
2020_standard_specifications
https://seattle.gov/documents/departments/spu/engineering/2020_standard_spe ...
production rate of 250 square feet per hour during the deck scarifying process. All water used in the Hydro-Demolition ...
0.00219082739 |
a/113678
2017standardspecifications
https://seattle.gov/documents/departments/spu/engineering/archive/2017stand ...
scarifying process. All water used in the Hydro-Demolition process must be potable. Stream or lake water is not ...
0.002190654 |
a/110623
2017standardspecifications
https://seattle.gov/documents/departments/spu/engineering/2017standardspeci ...
scarifying process. All water used in the Hydro-Demolition process must be potable. Stream or lake water is not ...
0.002190654 |
a/113668
2020_standard_specifications-draft
https://seattle.gov/documents/departments/spu/engineering/2020_standard_spe ...
in the Hydro-Demolition process must be potable. Stream or lake water is not permitted. 46 All bridge ...
0.00219030585 |
a/113677
2008standardspecs
https://seattle.gov/documents/departments/spu/engineering/2008standardspecs ...
in preparing for and aiding with the administration of the Contract. 1. A method of removal and/or demolition plan and ...
0.00218701758 |
a/113657
bgt_shilshole_hazmat_final
https://seattle.gov/documents/departments/sdot/bikeprogram/bgt/bgt_shilshol ...
and replaced should there be a need to conduct a cleanup beneath the site associated with adjacent or upgradient properties. Any structures ...
0.0021862206 |
a/100471
adoptedufcmeetingnotes010820
https://seattle.gov/documents/departments/urbanforestrycommission/2020/2020 ...
Hi, It looks like the Tulip Tree’s time may have finally run out. They have their demolition and construction ...
0.00218095887 |
a/119028
smpord
https://seattle.gov/documents/departments/sdci/vault/shorelinemasterprogram ...
for the demolition permit. 6. Remodeling floating homes outside the Construction Limit Line. Remodeling a ...
0.00217901426 |
a/98889
Previous
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
Next