Filter Results

651 to 675 of 2643
adu_deis_2018
to the construction of accessory dwelling units (ADUs) in single-family zones. The objectives of the proposal are to: •Remove regulatory ...
0.002209544 |
a/53190
lpbcurrentnom_harvey_funeral_home
or demolition of the subject building described within this report will require a permit from DCI, the ...
0.00220937165 |
a/74483
harveyfuneralhome_nomination_application
” for commercial projects over 4,000 square feet in area. As any proposed alterations or demolition of the subject building ...
0.00220937165 |
a/75280
final_cemp_v15_08_08
Management Plan – ESF Annexes Page | 121 Updated May 2015 • Permitsdemolition, land use, construction ...
0.00220935373 |
a/57119
isrd112823_1001jackson_bprepost
, Washington 98104PROJECT DESCRIPTION The proposed project consists of demolition of an existing structure and an existing ...
0.00220935373 |
a/150034
spu_seattles-new-solid-waste-metrics-and-targets-report_2025
: Construction and Demolition (C&D) Debris Diversion Rate (percent, %) 12 Focus Area: Food Waste Reduction 15 Key ...
0.00220935373 |
a/174844
spr commuse insurance 091025
# INSURED ABC Company (MUST match the name on business license and the permit) 123 Happy Valley Road Seattle, WA 98107 ...
0.00220900052 |
a/174537
roworr_manual
, AND ENFORCEMENT1.3 PERMIT FOR STREET OPENING1.4 APPEALS1.5 REFERENCES2. DEFINITIONS3. GENERAL PROVISIONS3.1 ...
0.00220900052 |
a/99135
tjp_2014_nomination_memo
of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. Because any proposed demolition ...
0.00220900052 |
a/75479
psb032923unionhotelps
/ NOTESDATEDESCRIPTIONNOSDOT #MUP #1 09/28/22 WDW COST EST.2 01/18/23 PERMIT 3 03/06/23 WINDOW ...
0.00220900052 |
a/140299
psb040523unionhotelps
/ NOTESDATEDESCRIPTIONNOSDOT #MUP #1 09/28/22 WDW COST EST.2 01/18/23 PERMIT 3 03/06/23 WINDOW ...
0.00220900052 |
a/140573
2026swmanualvol3projectstormwatercontrol
://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-permittee-guidance-resources/Emerging-stormw ...
0.00220900052 |
a/181133
roworr_manual
, AND ENFORCEMENT1.3 PERMIT FOR STREET OPENING1.4 APPEALS1.5 REFERENCES2. DEFINITIONS3. GENERAL PROVISIONS3.1 ...
0.00220900052 |
a/99200
spu_wastewater-collection-system-annual-report_2025
Reporting Requirements, NPDES Permit 6.............................................................. Table 1-2. 2025 ...
0.00220900052 |
a/182709
2015smcchapter5
construction. Ventilation shall be provided for operations involving the application of mate-rials containing flammable solvents in the ...
0.00220900052 |
a/97255
compiled final master plan - approved 05-12-10
and the corresponding decision making and public permit approvals. It is responsive to the community need for increased ...
0.0022089202 |
a/77100
equitabledevelopmentzoningord_sepadraft
23.84A.018 to the Seattle 6 Municipal Code; to implement changes to remove regulatory barriers and simplify and 7 increase predictability of ...
0.00220881379 |
a/140269
sluopenspaceordinance
by ordinance unless the Landmarks Preservation Board has issued a 19 Certificate of Approval for the modification or ...
0.00220881379 |
a/87698
newhalem_20240930_evalhistoricbuiltenvironment
effects that may occur from the project beyond the limits of construction. The project boundary consists of locations where project ...
0.00220878026 |
a/161836
uw-culturalresourcesreport_finaldeliverable_august-2017
and approved by the Seattle City Council, they are protected under a Controls and Incentives Agreement from demolition and ...
0.00220878026 |
a/76616
spucap
•472 miles of combined sewers•68 pump stations•90 permitted combined sewer overflow outfalls•295 storm drain outfalls•189 ...
0.00220866455 |
a/62186
spucapall
of storm drains • 472 miles of combined sewers • 68 pump stations • 90 permitted combined sewer overflow outfalls • 295 ...
0.00220866455 |
a/62170
directors_report_mha_implementation_dt_slu
to minimize displacement, providing protections for tenants and low-income homeowners, streamlining permitting systems to ...
0.00220862962 |
a/65076
561seattlepublicutilities
of combined sewers * • 68 pump stations • 90 permitted combined sewer overflow outfalls • 295 storm drain outfalls • 189 ...
0.00220846361 |
a/61973
seattle_public_utilities
of combined sewers * • 68 pump stations • 90 permitted combined sewer overflow outfalls • 295 storm drain outfalls • 189 ...
0.00220846361 |
a/61991