Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [48]
Neighborhoods [4]
Departments [331]
Audience [6]
Boards and Commissions [3]
City Issues [7]
Content Types [4]
Documents [9536]

Filters

Topics [48]
Neighborhoods [4]
Departments [331]
Audience [6]
Boards and Commissions [3]
City Issues [7]
Content Types [4]
Documents [9536]

Results

6526 to 6550 of 11737
  1. psb080625800occpp MUST BE ON THE JOB SITEWHENEVER CONSTRUCTION IS IN PROGRESS.2.UNLESS NOTED OTHERWISE, THE CONTRACTOR MAY USE ANY ...
  2. 08-21-19 1st ave s and sw kenyon PRE-JOB SITE ASSESSMENT & INSTRUCTIONS Specifications/Notes Uneven Terrain (Fall Protection Required) ☐ Yes ☒ No ...
  3. 6-14-18-poplar-dearborn ☐ Safety of Occupant ☐ Blocking intended use of facility ☐ Safety of other near and around camp ☐ Remand to SPU ...
  4. 11-15-2017-i-90-sound-barrier-wall contractors‐ SPU   PRE‐JOB SITE ASSESSMENT & INSTRUCTIONS  Specifications/Notes Uneven Terrain (Fall Protection Required) ☐ ...
  5. 12-13-2017-1845-e-marginal intended use of facility ☐  Safety of other near and around camp ☐  Remand to SPU       PRE‐JOB SITE ASSESSMENT & INSTRUCTI ...
  6. 2-6-2018-ravenna-cowen-parks by scheduled contractors‐ FAS  ☐  Tent on side walk  ☐  Safety of Occupant   ☐  Blocking intended use of facility ☐  Safety of other near an ...
  7. 11-30-2017-mercer-corridor near and around camp ☐ Remand to SPU PRE-JOB SITE ASSESSMENT & INSTRUCTIONS Specifications/Notes Uneven Terrain ...
  8. vol 3_b_bgt_feis_tech_appendix_b_web_lowrez by the contractor, in consultation with, and with concurrence from, the City. Worker Access and Parking 1.5.5The contractor is expected to ...
  9. spr strategic plan updated 2020-2032 and 2025-2028 action plan Strengthen communication and outreach to better inform the public about our parks, facilities, and programs 4 Participate in the City’s ...
  10. northgateregionalcenterdraftplanappendix01_engagementsummaryrepor ... While one of Northgate’s assets is its proximity to jobs and activity Downtown and to the North, some noted that Northgate ...
  11. 11-8-2017-metro-stairs-rainier-ave ☐  Safety of Occupant   ☐  Blocking intended use of facility ☐  Safety of other near and around camp ☐  Remand to SPU       PRE‐JOB< ...
  12. 10-11-17-queen-anne-west ☐  Remanded to Illegal Dumping  ☐  Blocking intended use of facility ☐  Safety of other near and around camp ☐  Cleared by scheduled contrac ...
  13. isrd101122ls2030ationplanfinalwebversion Comprehensive Plan guides City decisions about where to locate housing and jobs, and where and how to invest in ...
  14. psb073025800occpp DRAINAGE CONTROL PLANS MUST BE ON THE JOB SITEWHENEVER CONSTRUCTION IS IN PROGRESS.2.UNLESS NOTED OTHERWISE, THE CONTRACTOR ...
  15. alignstudy_final in order to support future desired job opportunities and economic development. Factors considered included impacts on ...
  16. appxc_alignstudy in order to support future desired job opportunities and economic development. Factors considered included impacts on ...
  17. fs23_coa_presentation(0) joining options using innovative 4 9⁄16" fiberglass joining plates, provide enhanced performance, design flexibility and the ultimate in ...
  18. 6-5-18-harborview-emphasis-zone by scheduled contractors- FAS ☐ Tent on side walk ☐ Safety of Occupant ☐ Blocking intended use of facility ☐ Safety of other near ...
  19. seattledesigncommission-2016.11.17lake2baypresentation all of these means touch Lake2Bay and have a need for information, interpretation, orientation, and directions. Unfortunately Seattle does ...
  20. 07-11-17-south-dearborn or Hazards•Vehicles/RVs /License PlatesNAVIGATION TEAM ASSESSMENT (Choose One Type) ☒Full Encampment Clean Up☐Obstruction Removal☐Hazard ...
  21. 08-15-17-carkeek-park /RVs /License Plates  NAVIGATION TEAM ASSESSMENT ☒  Full Encampment Clean Up ☐  Obstruction Removal ☐  Hazard Removal ☐  Litter Pick Only  P ...
  22. 10-9-17-belltown-emphasis-zone contractors‐ FAS    ☐  Cleared by scheduled contractors‐ SPU   PRE‐JOB SITE ASSESSMENT & INSTRUCTIONS  Specifications/Notes ...
  23. 3-19-2018-qa-greenbelt-west intended use of facility ☐ Safety of other near and around camp ☐ Remand to SPU PRE-JOB SITE ASSESSMENT & ...
  24. 2026-standard-plans BE ON SITE. FOR INSTALLATION PROCEDURES CALL 684-3536. 5. ALL FITTINGS AND MATERIALS FURNISHED BY CONTRACTOR AND TO BE INSTALLED BY SPU MUST ...
  25. 7.16-17.2019_s-norman-st-to-s-massachusetts-st-and-from-rainier-a ... to SPU PRE-JOB SITE ASSESSMENT & INSTRUCTIONS Specifications/Notes Uneven Terrain (Fall Protection Required) ☐ Yes ...