Filter Results

576 to 600 of 2643
2022-solid-waste-plan-update_chapter-3_solid-waste-data-trends
, SPU is better positioned to provide resilient collection services and customer programs. Building Permits Trends in new ...
0.0022267988 |
a/146063
cb-118736-cs-memo-8.2.2016
, demolition, grading, and other construction permits (supplemental procedures for environmental review ...
0.00222674059 |
a/53222
lpb111524uwandersonhallpp
, is a written authorization, much like a permit, that must be issued before any changes can be made to the designated ...
0.002226727 |
a/162430
lpb112024uwandersonhallpp
, is a written authorization, much like a permit, that must be issued before any changes can be made to the designated ...
0.002226727 |
a/162677
opcd-seattle 2035 comp plan update ord
for such demolition shall be in 3 effect, but any permit decision or permit for any ...
0.00222654 |
a/87618
opcd-seattle 2035 comp plan update ord
for such demolition shall be in 3 effect, but any permit decision or permit for any ...
0.00222654 |
a/87433
isrd52824_prelimpres
, Washington 98104PROJECT DESCRIPTION The proposed project consists of demolition of an existing structure and an existing ...
0.00222635386 |
a/156681
isrd52824_bp
98104PROJECT DESCRIPTION The proposed project consists of demolition of an existing structure and an existing surface ...
0.00222635386 |
a/156693
2022-solid-waste-plan-update_appendix-e_recycling-potential-asses ...
E.24 Results of Seattle’s Solid Waste Recycling, Composting, and Beneficial Use Analysis E.25 Municipal Solid Waste Results E.25 ...
0.00222632661 |
a/146071
sepa_env_checkslist_fairview_ave_n_bridge
in the project site. This work must occur before bridge construction starts in order to maintain adequate clearance between live lines and ...
0.00222632661 |
a/100887
2026sdcistandardswnotes
STABILIZED WITH THE APPROPRIATE SOIL AMENDMENT AND COVER MEASURES AT COMPLETION OF THE PROJECT. TYPICAL COVER MEASURES INCLUDE LANDSCAPING ...
0.0022261336 |
a/181714
finalmasterplan-2008-11-10
, underground parking, open space and landscaping. 7 New or expanded boundaries shall not be permitted where they would ...
0.0022261336 |
a/77105
compiled_mha_feis_appendices_2017
alternative fall in two categories. First, there are demolitions already permitted by the City. Some of ...
0.0022261336 |
a/65068
appdxa_biologicalassessment_geologysoilstechmemo
all wetted areas of Lake Union where in-water and overwater work activities associated with bridge demolition and ...
0.00222605723 |
a/100827
2018sebcchapter15
. The site shall be left level and free of debris upon completion of demolition, and all holes shall be filled or protected ...
0.002225967 |
a/97157
lpb060524uwandersonhallpp
to regulatory controls. A Certificate of Approval, issued by the Landmarks Preservation Board, is a written authorization, much like a ...
0.002225967 |
a/156834
annual report 2018 -- 5-2-19 - final
in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of Building Permits. The ...
0.002225959 |
a/77363
5waterinfrastructurefinalredacted
demolition to establish a BOD for their protection. For information on demolition permit ...
0.002225959 |
a/154278
reportonrecommendationsandrezoneanalysis
to, rather than detract from, that desired character. In particular, large projects resulting in the demolition of several ...
0.00222592358 |
a/87342
annualreport2018
expressed interest in the Lynn Building along E Madison Street. When the university moves forward with a Master Use Permit ...
0.00222563883 |
a/77250
central-staff-memo-on-amendments-(added-071916)
setbacks; 6. Determinations of Significance (determination that an environmental impact statement is required) for Master Use ...
0.00222529983 |
a/53223
street_use_101_and_q&a_session_q2 (web ready)
Department of Transportation 3Street Use 101 •Portal improvements•SIP vs. SIP Lite overview•Accela basics:•How to request a change to ...
0.0022252975 |
a/105760
constructionmanagementplan2016
machinery. II. Construction of noise barriers near fixed engines (i.e. pumps). 4.0 CONSTRUCTION MILESTONES 4.1 SCHEDULE A. ...
0.00222528027 |
a/77619
presentation20160314
of noise barriers near fixed engines (i.e. pumps). 4.0 CONSTRUCTION MILESTONES 4.1 SCHEDULE A. ...
0.00222528027 |
a/77654
annualreport2017_1
Permits. The goal for the TMP in the Master Plan will be to achieve an employee SOV rate of 50 percent prior to approval ...
0.00222523184 |
a/77366