You just searched for:
Search
Filter Results
551 to 575 of 2609
seattle-solid-waste-2011-os
http://seattle.gov/documents/departments/seattlegovportals/business/investo ...
or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ...
0.00221622852 |
a/107405
psb121824newcoolpp
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
MADESAFE.16.REMOVAL OF ELECTRICAL DUCTBANK, CONDUITS AND VAULTS SHALL FOLLOW PULLINGOF CABLE AND CONDUCTORS.17.THE CONTRACTOR SHALL OBTAIN ...
0.00221614842 |
a/163531
ch mimp_2023 annual report_final resubmission
http://seattle.gov/documents/departments/opcd/majorinstitutionsandschools/s ...
Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of ...
0.00221614749 |
a/163966
ch mimp 2024 annual report
http://seattle.gov/documents/departments/opcd/majorinstitutionsandschools/s ...
and Transit 3 TMP Goal Prior to First Issuance of Building Permits. The goal for the TMP in the Master Plan will be to ...
0.00221614749 |
a/169046
sch202510222025ar
http://seattle.gov/documents/departments/opcd/majorinstitutionsandschools/s ...
the hospital’s square footage up to 2,753,000 square feet over the next 30 years. Swedish Cherry Hill will not be issued a Master Use ...
0.00221614749 |
a/174418
correctedfindingsandrecommendations
http://seattle.gov/documents/departments/opcd/majorinstitutionsandschools/u ...
the paragraph under “Demolition”: Demolition is permitted prior to future development as ...
0.00221606647 |
a/77696
lpbcurrentnom_asa_mercer
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
alterations or demolition of the subject building described within this report will require a permit from ...
0.00221597124 |
a/74419
asamercerms_nom_application
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
alterations or demolition of the subject building described within this report will require a permit from ...
0.00221597124 |
a/75133
2009-2014_adopted_cip_book
http://seattle.gov/documents/departments/financedepartment/0914adoptedcip/2 ...
Renovation, Wetlands Development, Beach Comfort Station Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building ...
0.00221552327 |
a/61424
cherry hill mimp_2023 annual report_final
http://seattle.gov/documents/departments/opcd/majorinstitutionsandschools/s ...
” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of Building ...
0.00221544551 |
a/163233
2021sebcchapter15
http://seattle.gov/documents/departments/sdci/codes/existingbuildingcode/20 ...
upon completion of demolition, and all holes shall be filled or protected with secure fences. Holes are ...
0.00221541827 |
a/162617
oneseattleplanfeis-chapter01-summary
http://seattle.gov/documents/departments/opcd/seattleplan/feis2025/oneseatt ...
to meet permitting requirements that should prevent or minimize adverse impacts. ▪ Vehicle Use—All of the plan alternatives ...
0.00221541827 |
a/165711
pspbminutes8-21-19
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
of demolition. 23.66.120 - Permitted uses A. All uses are permitted outright except ...
0.00221497426 |
a/74087
sdot title vi_program_with concurrence memo + attachments _ (1)
http://seattle.gov/documents/departments/sdot/about/documentlibrary/oeei/sd ...
, which are 158 passengers on Tri-12 vehicles and 150 passengers on Trio-121 vehicles.1People 65 or older and people with disabilities can ...
0.00221495563 |
a/99321
lpb052125memorialstadiumpp
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Guy Gallipeau led a demonstration to City Hall to oppose the demolition of the War Memorial Wall. The city and school board ...
0.0022149398 |
a/168942
2022-solid-waste-plan-update_chapter-3_solid-waste-data-trends
http://seattle.gov/documents/departments/spu/aboutus/plans/solidwaste/2022- ...
, SPU is better positioned to provide resilient collection services and customer programs. Building Permits Trends in new ...
0.00221472979 |
a/146063
ch_mimp_2022 annual report_final
http://seattle.gov/documents/departments/opcd/majorinstitutionsandschools/s ...
. in their “18th Ave Building Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP ...
0.00221472979 |
a/139530
cb-118736-cs-memo-8.2.2016
http://seattle.gov/documents/departments/council/committees/cb-118736-cs-me ...
, demolition, grading, and other construction permits (supplemental procedures for environmental review ...
0.00221467251 |
a/53222
lpb111524uwandersonhallpp
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, is a written authorization, much like a permit, that must be issued before any changes can be made to the designated ...
0.00221465924 |
a/162430
lpb112024uwandersonhallpp
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, is a written authorization, much like a permit, that must be issued before any changes can be made to the designated ...
0.00221465924 |
a/162677
opcd-seattle 2035 comp plan update ord
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/seattlesco ...
for such demolition shall be in 3 effect, but any permit decision or permit for any ...
0.00221447484 |
a/87618
opcd-seattle 2035 comp plan update ord
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/seattle'sc ...
for such demolition shall be in 3 effect, but any permit decision or permit for any ...
0.00221447484 |
a/87433
isrd52824_prelimpres
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, Washington 98104PROJECT DESCRIPTION The proposed project consists of demolition of an existing structure and an existing ...
0.00221429183 |
a/156681
isrd52824_bp
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
98104PROJECT DESCRIPTION The proposed project consists of demolition of an existing structure and an existing surface ...
0.00221429183 |
a/156693
sepa_env_checkslist_fairview_ave_n_bridge
http://seattle.gov/documents/departments/sdot/bridgestairsprogram/bridges/s ...
in the project site. This work must occur before bridge construction starts in order to maintain adequate clearance between live lines and ...
0.00221426482 |
a/100887