Filter Results

526 to 550 of 2628
pikepineconservationstudyphase1
buildings. Demolition Review: Demolition review could also be incorporated into the ...
0.00219399412 |
a/87328
sw-405.2_waste-diversion-report-submittal-process
diversion report for demolition, new construction or alteration projects which received a building permit ...
0.00219399412 |
a/112428
2020 annual report to the city of seattle for the mimp
and offsite uses. No action in reporting period Historic Resources 52. Prior to the approval of a demolition ...
0.00219396269 |
a/136394
vm2020annreport
Historic Resources 52. Prior to the approval of a demolition permit for a building that was constructed 50 ...
0.00219396269 |
a/77922
2021 annual report to the city of seattle for the mimp
Historic Resources 52. Prior to the approval of a demolition permit for a building that was constructed 50 ...
0.00219396269 |
a/136396
entire_2009-2014_proposed_cip
the Athletic Field Renovation, Wetlands Development, Beach Comfort Station Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler ...
0.00219396269 |
a/61504
oneseattleplanfeisaddendumnovember2025
by maintaining existing historic referral thresholds for demolition, and the ability to make other historic referrals if a ...
0.00219396269 |
a/175378
prehearingbrief
#31: Page 151: Amend the paragraph under “Demolition”: Demolition is permitted prior to ...
0.00219391845 |
a/77836
ch mimp_2022 annual report_updated 6.30.23
of Building Permits. The goal for the TMP in the Master Plan will be to achieve an employee SOV rate of 50 percent prior to ...
0.00219391845 |
a/144118
lpb08062925fremonttrolleybarnpp
Adaptations (New Openings) 17ATTACHMENTS & REFERENCES Existing Photo Elevations 27 Window Survey 29 Previously Studied Options 35 Full ...
0.00219391845 |
a/171612
adrule27.01.24
on or within a marine terminal. VESSEL is a ship, barge or other floating vessel utilized in the transportation of materials. Section 2. ...
0.00219374639 |
a/153899
backyardcottagesguide-final
IntroductionModels A - G BUILDING YOUR BACKYARD COTTAGE 36 How to Work With a Contractor The Construction Contract Other ...
0.00219374639 |
a/108133
adrule27.01.14
of materials. SECTION 2 -- PERMITS 2.1 General. An annual Marine Terminal permit (Code 8025) must be ...
0.00219374639 |
a/64113
adrule27.01.24_v1_marine_terminals_for_fcab_13124
facilities. ON DOCK RAIL (ODR) is a railroad facility located on or within a marine terminal. VESSEL is a ship, barge or other floating ...
0.00219374639 |
a/151957
lpb040523montlakepp-web
Enrollment Capacity 500 Students• Existing Building = 22,447 Sf• Historic Building + Addition = 85,000 Sf• Demolition Of ...
0.00219372869 |
a/140523
lpb040523montlakepp
Capacity 500 Students• Existing Building = 22,447 Sf• Historic Building + Addition = 85,000 Sf• Demolition Of Existing ...
0.00219372869 |
a/140467
4-neighborhoodsanddevelopment
opportunities, leveraging competitive advantages, connecting to other resources in the region, and identifying issues and trends ...
0.002193501 |
a/61959
2021swmanualvol1projectminimumrequirementsclean
demolition permits; b. Applications for a building permit or other construction ...
0.002193501 |
a/96984
seattle city light 2025 pos
of principal of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners ...
0.002193501 |
a/169954
seattle city light 2025 os
which is permitted or required to be given to Registered Owners under the Bond Ordinance (except such notice as is required ...
0.002193501 |
a/170371
prelimdecision20180904
: Amend the paragraph under “Demolition”: Demolition is permitted prior to future ...
0.00219323812 |
a/77837
ft-lawton-redev-plan_091808
of the Redevelopment Plan include the following:development of detailed drawings and plans by an architectural and engineering • ...
0.00219323812 |
a/72607
thorntoncreekdeparturerecommendationsfinal
and criteria set forth in Chapter 8 23.79 only when departure would contribute to reduced demolition of residential ...
0.00219321577 |
a/77680
transcript sw public meeting 2 jan 14 2026
and manual is required under the Clean Water Act and our NPDS permit, our National Pollution Discharge Elimination System ...
0.002193211 |
a/177009
vm_2019_annual_report
shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. Prior to the approval of a ...
0.00219312473 |
a/77926