Search Results
Results
526 to 550 of 2636
- lpb040523montlakepp Capacity 500 Students• Existing Building = 22,447 Sf• Historic Building + Addition = 85,000 Sf• Demolition Of Existing ... 0.00224179123 | | a/140467
- 4-neighborhoodsanddevelopment opportunities, leveraging competitive advantages, connecting to other resources in the region, and identifying issues and trends ... 0.00224154885 | | a/61959
- 2021swmanualvol1projectminimumrequirementsclean demolition permits; b. Applications for a building permit or other construction ... 0.00224154885 | | a/96984
- seattle city light 2025 pos of principal of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners ... 0.00224154885 | | a/169954
- seattle city light 2025 os which is permitted or required to be given to Registered Owners under the Bond Ordinance (except such notice as is required ... 0.00224154885 | | a/170371
- prelimdecision20180904 : Amend the paragraph under “Demolition”: Demolition is permitted prior to future ... 0.00224126945 | | a/77837
- thorntoncreekdeparturerecommendationsfinal and criteria set forth in Chapter 8 23.79 only when departure would contribute to reduced demolition of residential ... 0.00224124547 | | a/77680
- transcript sw public meeting 2 jan 14 2026 and manual is required under the Clean Water Act and our NPDS permit, our National Pollution Discharge Elimination System ... 0.00224124058 | | a/177009
- adrule27.01.24 ) is a railroad facility located on or within a marine terminal. VESSEL is a ship, barge or other floating vessel utilized in the ... 0.002241224 | | a/153899
- vm_2019_annual_report shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. Prior to the approval of a ... 0.00224114861 | | a/77926
- vm2019annreport to minimize the potential shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. ... 0.00224114861 | | a/77921
- vm 2018 annual report of a demolition permit for a building that was constructed 50 years ago or earlier, an historical analysis ... 0.00224114861 | | a/77913
- psb060425213mainhp in the former earthquake, as it apparently suffered structural damage that led to the demolition of its upper floors and ... 0.00224114861 | | a/169307
- psb052825213mainhp in the former earthquake, as it apparently suffered structural damage that led to the demolition of its upper floors and ... 0.00224114861 | | a/169188
- oneseattleplandeisappendices , and demographics for existing and new construction. We will also look at recent trends in demolitions, rehabilitations, ... 0.00224114861 | | a/153560
- 1005_s_king_historic_report 5.1 Evaluation of Historic Significance 5.2 Cultural and Social Character 5.3 Effects of Demolition 5.4 Alternatives to ... 0.0022408634 | | a/73283
- charlesstreetrelocationanalysisreport size parcel. The Study does not consider other costs such as such as demolition at the site, hazardous material removal, ... 0.0022406308 | | a/86568
- seattle-solid-waste-2011-os or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ... 0.002240613 | | a/58552
- seattle-solid-waste-2011-os or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ... 0.002240613 | | a/107405
- psb121824newcoolpp MADESAFE.16.REMOVAL OF ELECTRICAL DUCTBANK, CONDUITS AND VAULTS SHALL FOLLOW PULLINGOF CABLE AND CONDUCTORS.17.THE CONTRACTOR SHALL OBTAIN ... 0.00224053045 | | a/163531
- ch mimp_2023 annual report_final resubmission Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of ... 0.00224052952 | | a/163966
- ch mimp 2024 annual report and Transit 3 TMP Goal Prior to First Issuance of Building Permits. The goal for the TMP in the Master Plan will be to ... 0.00224052952 | | a/169046
- sch202510222025ar the hospital’s square footage up to 2,753,000 square feet over the next 30 years. Swedish Cherry Hill will not be issued a Master Use ... 0.00224052952 | | a/174418
- correctedfindingsandrecommendations the paragraph under “Demolition”: Demolition is permitted prior to future development as ... 0.0022404457 | | a/77696
- lpbcurrentnom_asa_mercer alterations or demolition of the subject building described within this report will require a permit from ... 0.00224034744 | | a/74419