Filter Results

526 to 550 of 2599
lpb040523montlakepp
Capacity 500 Students• Existing Building = 22,447 Sf• Historic Building + Addition = 85,000 Sf• Demolition Of Existing ...
0.00219372869 |
a/140467
4-neighborhoodsanddevelopment
opportunities, leveraging competitive advantages, connecting to other resources in the region, and identifying issues and trends ...
0.002193501 |
a/61959
2021swmanualvol1projectminimumrequirementsclean
demolition permits; b. Applications for a building permit or other construction ...
0.002193501 |
a/96984
seattle city light 2025 pos
of principal of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners ...
0.002193501 |
a/169954
seattle city light 2025 os
which is permitted or required to be given to Registered Owners under the Bond Ordinance (except such notice as is required ...
0.002193501 |
a/170371
prelimdecision20180904
: Amend the paragraph under “Demolition”: Demolition is permitted prior to future ...
0.00219323812 |
a/77837
ft-lawton-redev-plan_091808
of the Redevelopment Plan include the following:development of detailed drawings and plans by an architectural and engineering • ...
0.00219323812 |
a/72607
thorntoncreekdeparturerecommendationsfinal
and criteria set forth in Chapter 8 23.79 only when departure would contribute to reduced demolition of residential ...
0.00219321577 |
a/77680
transcript sw public meeting 2 jan 14 2026
and manual is required under the Clean Water Act and our NPDS permit, our National Pollution Discharge Elimination System ...
0.002193211 |
a/177009
vm_2019_annual_report
shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. Prior to the approval of a ...
0.00219312473 |
a/77926
vm2019annreport
to minimize the potential shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. ...
0.00219312473 |
a/77921
vm 2018 annual report
of a demolition permit for a building that was constructed 50 years ago or earlier, an historical analysis ...
0.00219312473 |
a/77913
psb060425213mainhp
in the former earthquake, as it apparently suffered structural damage that led to the demolition of its upper floors and ...
0.00219312473 |
a/169307
psb052825213mainhp
in the former earthquake, as it apparently suffered structural damage that led to the demolition of its upper floors and ...
0.00219312473 |
a/169188
oneseattleplandeisappendices
, and demographics for existing and new construction. We will also look at recent trends in demolitions, rehabilitations, ...
0.00219312473 |
a/153560
1005_s_king_historic_report
5.1 Evaluation of Historic Significance 5.2 Cultural and Social Character 5.3 Effects of Demolition 5.4 Alternatives to ...
0.00219285651 |
a/73283
charlesstreetrelocationanalysisreport
size parcel. The Study does not consider other costs such as such as demolition at the site, hazardous material removal, ...
0.00219263788 |
a/86568
adrule27.01.22_v1_marine_terminals_proposed_for_12122023_12-29
) is a railroad facility located on or within a marine terminal. VESSEL is a ship, barge or other floating vessel utilized in the ...
0.00219263788 |
a/151368
seattle-solid-waste-2011-os
or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ...
0.00219262135 |
a/58552
seattle-solid-waste-2011-os
or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ...
0.00219262135 |
a/107405
psb121824newcoolpp
MADESAFE.16.REMOVAL OF ELECTRICAL DUCTBANK, CONDUITS AND VAULTS SHALL FOLLOW PULLINGOF CABLE AND CONDUCTORS.17.THE CONTRACTOR SHALL OBTAIN ...
0.00219254335 |
a/163531
ch mimp_2023 annual report_final resubmission
Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of ...
0.00219254266 |
a/163966
ch mimp 2024 annual report
and Transit 3 TMP Goal Prior to First Issuance of Building Permits. The goal for the TMP in the Master Plan will be to ...
0.00219254266 |
a/169046
sch202510222025ar
the hospital’s square footage up to 2,753,000 square feet over the next 30 years. Swedish Cherry Hill will not be issued a Master Use ...
0.00219254266 |
a/174418
correctedfindingsandrecommendations
the paragraph under “Demolition”: Demolition is permitted prior to future development as ...
0.002192464 |
a/77696