Filter Results

451 to 475 of 1339
execsummary_13_38_000
fund balance, to support critical transportation infrastructure needs. Transit Master Plan Implementation ...
0.0018325611 |
a/62103
levy_assessment_report_20200128_ada
their prioritization method. For several programs, the process is outlined in adopted modal master plans ...
0.00183247461 |
a/99057
planningcommissiononinterbayoverlayproposalaugust32007final2
. Approval of the first Master Use permit for non-industrial use within the overlay area should be conditioned on ...
0.00183243258 |
a/109266
freightmp080515
freightmp080515 Urban Forestry Commission August 5, 2015 Freight Master Plan ...
0.00183242629 |
a/118420
october82015approvedminutes
the Design Review process before those recommendations are sent to City Council. Update: Freight ...
0.00183240289 |
a/109099
homezone_toolkit
and Federal Programs. In general, these improvements align with the agency’s four modal master plans ...
0.00183238869 |
a/104223
seattledesigncommission-2008.07.03mayorsofficebriefingminutes
July 3, 2008 Convened: 8:30am Adjourned: 2:30pm Projects Reviewed Pedestrian Master Plan Mayor’s ...
0.00183235924 |
a/85444
2018_0823_loc_augustminutes
on developing what our proposal might be. The second piece is about the implementation plan process. Most of our programs – ...
0.00183234166 |
a/99524
ufmpupdatedraft070312
institutions to develop landscape management plans to actively manage their urban forest resources. Identify and work with ...
0.001832331 |
a/119386
industrialmaritimestrategyeisaddendum
and screen line approach is set out in Seattle 2035). The analysis then outlines the current policy framework including an overview of Move ...
0.00183223328 |
a/144038
appendices
This project funds the City's involvement in the replacement of the Alaskan Way Viaduct and Seawall. ALASKAN WY VI SB  $           ‐    Bike ...
0.001831952 |
a/63252
appendices
in the replacement of the Alaskan Way Viaduct and Seawall. ALASKAN WY VI SB  $           ‐    Bike Master Plan
0.001831952 |
a/63236
sdot
for walking, biking, riding transit, driving, and moving freight based on geographic equity and community need. These ...
0.001831952 |
a/134200
utilitiesandtransportationtab
, as part of implementing the Solid Waste Facilities Master Plan. Other costs for Facilities ...
0.00183159043 |
a/60706
sepachecklistfor2016rowimfinal
, Determination of Non-significance (February 2017) ▪ Seattle Freight Master Plan, ...
0.00183143164 |
a/103933
denny-regrade-belltown-matrix
Facilities Master Plan. At this point, theDistrict does not have any plans to operate a ...
0.00183138985 |
a/78360
2005-2006_proposed_utilities_transportation
for a portion of the Solid Waste Proposed CIP, including development and implementation of the Solid Waste Facilities ...
0.00183138985 |
a/60747
q3_2018_quarterreport_11262018_final_clean
TOTAL Freight spot improvements 5 1 2 2 5 FINANCIAL REPORT – Q3 2018 MOVE SEATTLE ALL FUNDS ADOPTED BUDGET $ 1.5 M $ 1.5 M ...
0.00183120335 |
a/99667
cencap
property sales; and private funds. Following the adoption of the Seattle Center Master Plan in 1990, two ...
0.00183118961 |
a/62899
seattlecenter
from property sales; and private funds. Following the adoption of the Seattle Center Master Plan in 1990, ...
0.00183118961 |
a/62912
cb118402final
increased maintenance tomorrow; and 4 WHEREAS, Seattle has three adopted modal master plans including the ...
0.00183100055 |
a/99246
compplanoutcomeofeisscopeprocess
canopy objectives, and interest in pedestrian, transit, bicycling, safety, and freight needs.  Relationships to capital imp ...
0.00183077587 |
a/87512
lpbcurrentnom_uw_canoe_house
in Section 16, T25N, R4E, W.M.  Present Owner:   University of Washington   Owner's Address:  Julie Blakeslee, Environmental and Land Use Pl ...
0.00183066737 |
a/74559
introduction
challenges, as well as identifying funding to continue efforts to develop a transportation system that meets future demands, including those ...
0.00183064223 |
a/61846
southlakeunioneischapter1environmentalsummary
and Pedestrian System Based on a review of the Pedestrian Master Plan, several improvements could be ...
0.00183062733 |
a/87706