Filter Results

426 to 450 of 2771
backgroundreport
approval.Use, design and demolition approval is required before any building or other City permit or ...
0.00219059153 |
a/88142
lpb120424uwandersonbp
the building and site features subject to regulatory controls. A Certificate of Approval, issued by the Landmarks Preservation Board, is a ...
0.002190524 |
a/163119
lpb121824uwandersonhallpp
authorization, much like a permit, that must be issued before any changes can be made to the designated features of ...
0.002190524 |
a/163503
seattle-drainage-os-2017
of any amount in respect of principal of or interest on the Bonds, or any notice which is permitted or required to be given ...
0.00219045533 |
a/58517
sea-drainage-os-2017
amount in respect of principal of or interest on the Bonds, or any notice which is permitted or required to be given to ...
0.00219045533 |
a/58472
2024-2029 adopted capital improvement program
regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) ...
0.00219041924 |
a/153286
2013-2018_adopted_cip
in their Capital Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two ...
0.00219037151 |
a/61969
2013-2018_proposed_cip
by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one for combined ...
0.00219037151 |
a/61983
2013-2018_adopted_cip_000
) permits, one for storm water and one for combined sewer system. The City is required, for example, to invest hundreds of ...
0.00219037151 |
a/61970
isrd_board_materials
International Special Review District structure, including facade alterations, new construction, demolition or remodeling. ...
0.00219032471 |
a/73333
2019annualwastewatercollectionsystemreport
Collection System NPDES Permit ...
0.00219016639 |
a/114388
2016annualwastewatercollectionsystemreport
Collection System NPDES Permit ................................................................................. 3 1.3 ...
0.00218998664 |
a/114366
2010csoreductionplanamendment
in the City’s CSO National Pollutant Discharge Elimination System (NPDES) permit. As a result, the City will capture 99% of ...
0.002189979 |
a/114315
draft eis_spu draft mimp_appendices_a-f
draft eis_spu draft mimp_appendices_a-f DRAFT ENVIRONMENTAL IMPACT STATEMENT APPENDICES for the SEATTLE PACIFIC UNIVERSITY Major Institution ...
0.00218996732 |
a/145270
cacresponsetodpdrecommendations
greater than 4,000 square feet or building addition greater than 4,000 square feet; and proposed street use term permits ...
0.00218996615 |
a/77370
lake city cc demo sepa dns - signed
Department of Construction and Inspections (SDCI) Demolition Permit; SDCI permit for ...
0.002189942 |
a/147076
2007appendiceswatersystemplan
for commercial settings. Toilet Flushes by Rainwater (SF, MF) - Substitute rainwater for potable water to flush toilets. This requires ...
0.00218993821 |
a/112544
2006src
-vantinformationinthefilesofthebuildingofficialorontheapproved permit ...
0.00218993821 |
a/97767
2025-2030 proposed cip
Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is required, for ...
0.00218988955 |
a/160787
2025-2030 adopted cip
(NPDES) permits, one for storm water and one for combined sewer system. The City is required, for example, to invest ...
0.00218988955 |
a/166663
mhar-ord
. Determinations of Significance (determination that an environmental impact 3 statement is required) for Master Use ...
0.00218987558 |
a/53232
residentialdeconstructiondreportrecommend
and safety reasons the current regulations prohibit issuance of a demolition permit for any structure ...
0.00218981155 |
a/98126
question #58 - wqidde illicit discharge data
: home demolition has damaged a heating oil tank and spilled hho to the ground. requested cleanup by the contractor. no ...
0.002189617 |
a/155466
final seattle university mimp report fy24 2024.09.23
interest in the Lynn Building along E Madison Street. When the university moves forward with a Master Use Permit (MUP) ...
0.00218950142 |
a/162914
2018annualwastewatercollectionsystemreport
................................................................................................. 1 1.2 Collection System NPDES ...
0.00218935357 |
a/114380