Filter Results

401 to 425 of 1101
sepa-checklist
for the Seattle Comprehensive Plan Update, May 2015. ▪ Seattle Department of Transportation, Seattle Transit ...
0.00182546128 |
a/149057
2008electricalcodereplacementpages
City of Seattle DEPARTMENT OF PLANNING AND DEVELOPMENT Permits and Information Applicant Services Center Key Tower, 20th ...
0.00182544661 |
a/96412
ballardurbandesignsurveymonkeyreport6-17-2014
with their needs. A moreorganized parking plan around Ballard Ave would help, too. It is a mess down there.4/30/2014 8:49 A ...
0.00182542508 |
a/86299
stadiumstudyconceptuallevelenvironmentalanalysis
and South Royal Brougham Way to provide access for vehicles and pedestrians to new uses on the WOSCA site.  Recommendations would be made ...
0.00182536477 |
a/87725
complete-streets-checklist-standard
project is in or crosses a designated freight route, does project design meet curb radius and clearance standards?3. Are ...
0.00182520936 |
a/159150
appendixa_2328cip
-TR-C029 Transit Corridor Improvements This program implements projects that improve transit speed, reliability, access, and convenience, ...
0.00182507338 |
a/138611
appendixcip
projects that improve transit speed, reliability, access, and convenience, consistent with the Transit Master ...
0.00182507338 |
a/134214
march2012engagement
Plan and the Transit Master Plan, both of which are closely linked to the Comp ...
0.00182507338 |
a/138947
impact-fees-planning-commission-presentation-10.25.2018
Implementation –projects identified in, or informed by implementation of, modal plans, i.e. the Bike ...
0.00182496593 |
a/53530
compplanamendments10.25.18(1)
identified in, or informed by implementation of, modal plans, i.e. the Bike Master Plan, ...
0.00182496593 |
a/108472
sepa checklist - mha dtslu implementation final
through its Pedestrian Master Plan and Bicycle Master Plan. These ...
0.00182494707 |
a/65082
adopted060414meetingsummary
for Green Stormwater Infrastructure (GSI). Leif, Steve, Erik will volunteer to provide input to DPD on the Comp Plan ...
0.0018249274 |
a/118325
draft060414meetingsummary
is contradicting the UFSP UF goals. We are proposing a new goal for GSI. Leif, Steve, Erik will volunteer to provide input to DPD on the ...
0.0018249274 |
a/118345
approvedjuly8meetingminutes
; and 2) provide guidance for future master planning at the Armory and WOSCA sites. Additional legislative ...
0.00182469713 |
a/108334
ballardsepadirectorsreport
PROPOSAL SUMMARY The proposal is a legislative action to amend Section 23.41.010 of the Seattle Municipal Code to remove the Ballard ...
0.00182466418 |
a/86277
1606sbab-mm-final
from input. SBAB Recommendations: SBAB members may submit comments as individuals. ...
0.001824633 |
a/107042
planningcommissioncompplandocketrecommendationsjuly122013
studies (Port Access Study and Freight Master Plan). These studies, in combination with ...
0.0018246182 |
a/108157
160706sbabltrfmpfinal
Claudia Lewis Phyllis Porter Puja Shaw July 6, 2016 To: Ian Macek, Seattle Department of Transportation Re: Freight ...
0.00182438921 |
a/106997
2018_0817_q2_financereport
& Repair, and $17.7M in Congestion Relief. Levy subprograms that recorded the most spending in Q2 2018 included: • Safe Routes $10.7M o ...
0.0018241707 |
a/99240
sbabaprilminutesfinal15
)  Keep  us  on  track  to  build  half  of  the  bicycle  master  plan  by ...
0.00182399992 |
a/106907
sbabaprilminutesfinal15
)  Keep  us  on  track  to  build  half  of  the  bicycle  master  plan  by ...
0.00182399992 |
a/107073
appendixa_2429adoptedcip
that improve transit speed, reliability, access, and convenience, consistent with the Transit Master Plan. ...
0.00182393519 |
a/153299
approved sfab february 2023 minutes
on the corridor with both directions combined. That amounted to about 30 percent of all of the traffic volumes on the corridor, itself. Our ...
0.00182382786 |
a/140801
sfab march 2023 minutes approved
on the corridor with both directions combined. That amounted to about 30 percent of all of the traffic volumes on the corridor, itself. Our ...
0.00182382786 |
a/143511
1_summary_mha_deis_2017
are expected to meet the 2035 SOV target under the three alternatives.Pedestrian and BicycleThe City has identified plans ...
0.00182381191 |
a/64997