401 to 425 of 2700
final seattle university mimp report fy24 2024.09.23
interest in the Lynn Building along E Madison Street. When the university moves forward with a Master Use Permit (MUP) ...
0.0128576728 |
a/162914
2018annualwastewatercollectionsystemreport
................................................................................................. 1 1.2 Collection System NPDES ...
0.012847621 |
a/114380
counciladopted2016_citywideplanning
below established thresholds before issuing permits for housing demolition, change of use, or substantial ...
0.0128374435 |
a/87525
counciladopted2019_citywideplanning
notice to all tenants and payment of relocation assistance to tenants with household incomes below established thresholds before issuing ...
0.0128374435 |
a/87542
counciladopted2017_citywideplanning
Require advance notice to all tenants and payment of relocation assistance to tenants with household incomes below established thresholds ...
0.0128374435 |
a/87531
counciladopted2018_citywideplanning
and payment of relocation assistance to tenants with household incomes below established thresholds before issuing permits ...
0.0128374435 |
a/87536
counciladopted2020_citywideplanning
advance notice to all tenants and payment of relocation assistance to tenants with household incomes below established thresholds before ...
0.0128374435 |
a/87548
2018sfcchapter9
. The fire code official shall have the authority to require construction documents and calcu-lations for all fire protection and life ...
0.01283719 |
a/97756
opcdhousingopportunitieszoningamendmentsordinance
that the no building permit for 17 the proposed tower is issued until the demolition of the tower that is ...
0.01283719 |
a/173246
lpb3-2-16_minutes
with the bracing plan with the applicant and they need to make sure as they work on the demolition permit ...
0.0128347483 |
a/74658
newhalem_20220128_applicationsurrender-decommissioningplan
Light's operation of the Newhalem Creek Project is authorized under Certificate of Water Right Number 38, Permit Number ...
0.0128200119 |
a/149830
annualreport2019
– June 30, 2019) SUMMARY OF UPDATES I. INTRODUCTION The design and Master Use Permit were approved for the Center for ...
0.01281985 |
a/77251
sea-sw-pos-2016
of the successful bidder’s bid, in sufficient quantities to permit the successful bidder to comply with Rule 15c2-12. By ...
0.0128145991 |
a/58474
urmfinalrecommendations
to be abated or braced. This requirement is enforced when SDCI receives an application for a building permit for any work ...
0.0128107062 |
a/96918
seattle-city-light-2018-pos
of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners under the Bond ...
0.0128107062 |
a/58502
tiny-house-village-bill_for-introduction-
of Significance (determination that an Environmental Impact 2 Statement is required) for Master Use Permits and for ...
0.012797514 |
a/53909
smcfirsthillmp122005
Districts and Underlying Zoning 583.2 Rezone of Major Institution Overlay Height Limits 603.3 Setbacks 643.4 ACU Permits ...
0.0127900317 |
a/77661
2014-2019proposedcip-book
Discharge Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is required, ...
0.0127838142 |
a/62174
2014-2019adoptedcipfinalbook
) permits, one for storm water and one for combined sewer system. The City is required, for example, to invest hundreds of ...
0.0127838142 |
a/62153
opcd-oh-sdci mandatory housing affordability for residential ...
, demolition, grading, and other 9 construction permits (supplemental procedures for environmental review ...
0.0127797714 |
a/64768
sea-sw-os-2016
by the Securities Depository or its participants of any amount in respect of principal of or interest on the Bonds, or any notice which is ...
0.0127797714 |
a/58473
mandatory-housing-affordability-for-residential-development-ordin ...
arcades; 6 e. Voluntary building setbacks; 7 6. Determinations of Significance (determination that an environmental impact 8 statement is ...
0.0127797714 |
a/53229
4-0commentsampresponsesfeis2016_0505
estimates should be replaced with full capacity reporting for all villages and areas outside villages. Actively monitor village and ...
0.0127767576 |
a/87480
scl-frn-2018-os
, or any notice which is permitted or required to be given to Registered Owners under the Bond Ordinance (except such ...
0.0127733275 |
a/58464
dww-200-stormwater-appendices-070121
. ● “Building permit” means a document issued by the Seattle Department of Construction and Inspections authorizing ...
0.01277325 |
a/112877