Filter Results

301 to 325 of 1339
context-wallingford
was enacted in May 1971668 and took effect on June 1, 1971.669 As a result, Seattle’s Master Program was adopted on March ...
0.0018487646 |
a/74348
seattleshorelinemarketstudy
provide barge service on a contract basis. SEATTLE SHORELINE MASTER PROGRAM UPDATE COMPARISON OF LAND SUPPLY AND DEMAND ...
0.00184869976 |
a/98808
sdotfromutilitiesandtransportation
ways to get around in Seattle. The 2011 Adopted and 2012 Endorsed Budget includes funding to update and complete the Transit ...
0.00184859859 |
a/61872
magnoliabridgetrafficmaintenance
of counts performed from March 27, 2017 through April 3, 2017. 2 SDOT, City ...
0.00184859429 |
a/100850
binmic-plan
binmic-plan e,r., 1.BALLARD INTERBAY NORTHEND MANUFACTURINGAND INDUSTRIAL CENTER (BINMIC)January 28,1998With March 11,1998 ...
0.00184830406 |
a/78390
transportation
-priority projects identified in the City's ITS Master Plan, in combination with grant match and local ITS ...
0.00184811035 |
a/60536
seattle-city-council-2015-work-program_adopted-version-(res-31571 ...
support and guidance on design.FREIGHT MASTER PLANReview the proposed Freight Master ...
0.00184795412 |
a/53344
2022feesubtitle
Design Review, Master Planned Community Design Review and Streamlined Design Review is $3,940. The ...
0.00184776937 |
a/137046
2020feesubtitle
of Citizen Advisory Committees for the routine annual review of approved master plans and/or the review of ...
0.00184776937 |
a/96486
2023feesubtitle
applies if the application is for an ACU only, or an ACU combined with a variance application. 2. Design Review The minimum fee for ...
0.00184776937 |
a/151209
2021feesubtitlefinal
Review, Master Planned Community Design Review and Streamlined Design Review is $3,940. The minimum fee ...
0.00184776937 |
a/96497
2021feesubtitle
, Master Planned Community Design Review and Streamlined Design Review is $3,940. The minimum fee for ...
0.00184776937 |
a/96496
feesubtitlefinal
is for an ACU only, or an ACU combined with a variance application. 2. Design Review The minimum fee for Administrative Design Review, ...
0.00184776937 |
a/96535
bsl_detail
Gathering Space Improve 208,195 714,000 50,000 - Full Time Equivalents Total 0.96 0.96 0.96 0.96 Utility Infrstr MP and Repairs The ...
0.00184775493 |
a/147713
sdot
and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, and Transit Master ...
0.00184765831 |
a/63321
utilities_and_transportation
of people, goods, and services throughout the city. Program Summary In 2008, projects funded include the following: Bike ...
0.00184756878 |
a/61365
bsl_2324adopted_mid-biennium
Equivalents Total 0.96 0.96 0.96 0.96 Utility Infrstr MP and Repairs The purpose of the Utility Infrastructure Master ...
0.00184745761 |
a/153231
sdot-vision-zero-toptobottomreview-fullreport
to direct $1 million in bicycle master plan implementation funds to upgrade lower-cost plastic traffic ...
0.00184733327 |
a/139131
seattle industrial deis ch 2 2021_12
locations from industrial zoning in Georgetown and South Park and convert them to mixed-use zoning to achieve neighborhood goals. Action ...
0.00184721255 |
a/87143
wsb infra final narrative_03192021_v3
transportation network for Figure 2: Average Daily Truck Volumes on Seattle Roadways Source: Seattle Freight ...
0.00184714166 |
a/101530
sdot
transportation options, the 2014 Proposed Budget makes important mobility investments, including funding to implement the Transit, ...
0.00184658042 |
a/62325
2010annualreport
, rehabilitation and seismic upgrades; tree pruning and planting; and other much-needed maintenance work. Funding also develops and ...
0.00184648565 |
a/99365
utilities_and_transportation
. Program Summary In 2008, projects funded include the following: Bike Master Plan Implementation, Bike ...
0.00184631755 |
a/61391
heat and wildfire annex final
heat and wildfire annex final CITY OF SEATTLE CEMP EXTREME HEAT AND WILDFIRE SMOKE – INCIDENT OPERATIONS PLAN Last ...
0.00184623781 |
a/145163
capdetailedstatusreportfeb2015
. On Track.Develop a ...
0.00184609834 |
a/88258