Filter Results

276 to 300 of 2624
vol_4_sourcecontrol_jan2026draft_redlines
● Phase I National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater General Permit ● Washington State ...
0.002146872 |
a/176462
4-5_commentsn-z_marked_mha_feis_2017
blocks surrounding my home be demolished and replaced by $700K townhouses. There are four formerly-affordable houses in the process of ...
0.00214662845 |
a/65048
opcdregionalcentersplandowntownseattledraftplansummaryappendices
Waterfront Pier.  …†ƒŒ12345Regularly review, simplify, and optimize permitting regulations and processes that aff ect ...
0.00214643055 |
a/176270
oneseattleplancomparisoncrosswalktable
in H 2.4. H 5.11 Require advance notice to all tenants and payment of relocation assistance to tenants with household incomes below ...
0.00214624871 |
a/169156
c3_delivery_assessment_10312023
through the City’s permitting process, the issue of the eligibility of an existing structure on the site for designation as ...
0.00214624777 |
a/151747
seattlemayorsrecommendedplan
to tenants with household incomes below established thresholds before issuing permits for housing ...
0.00214624777 |
a/87660
2006-2011_entire_adopted_cip
or infrastructure improvements. The project may include flow monitoring, modeling, property acquisition, preliminary engineering, design, ...
0.00214622146 |
a/60879
2016stormwatercode
; 4. To meet the requirements of state and federal law and the City's municipal stormwater National Pollutant Discharge Elimination System ...
0.00214587338 |
a/96456
2006-2011_pdf_cip
monitoring, modeling, property acquisition, preliminary engineering, design, permitting, public works contracting, ...
0.002145683 |
a/60933
seattle drainage 2023 pos
of the successful bidder’s bid, in sufficient quantities to permit the successful bidder to comply with Rule 15c2-12. By ...
0.00214524474 |
a/142585
proposedecaseparegulations
Zone Residential uses Permit applications for additions, modifications, demolition, or Margaret Glowacki ...
0.00214509456 |
a/96795
vol4_sourcecontrol_july2025draft_redlines
) Municipal Stormwater General Permit ● Washington State Department of Ecology (Ecology) Stormwater Management Manual for ...
0.00214509456 |
a/170617
southdowntowndrafteis
. However, similar to Pioneer Square, intentional disinvestment or litigation could potentially lead to the eventual granting of ...
0.00214500027 |
a/88168
fundingurmretrofits
-pertise could be an essential ingredient in moving a project forward. Additionally, creating a separate internal team at SDCI to expedite ...
0.002145 |
a/96872
public meeting #2 table of changes_jan2026
Review Draft Stormwater Code ● Added and updated definitions and requirements for clarity and to be consistent with the 2024 Phase I ...
0.00214497955 |
a/176479
seattle drainage 2023 os
of principal of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners ...
0.002144911 |
a/143033
finalstormwatermanualvolume2
C1.15: Material Delivery, Storage, and Containment ................. 5-3 5.1.2. BMP C1.20: Use of Chemicals During ...
0.00214481214 |
a/96547
09_ifc_2021v6_mar_2023
and calculations for all fire protection and life safety systems and to require permits be issued for the installation, ...
0.00214473228 |
a/139963
opcd_aduannualreport2021
alteration of existing space; and how many ADUs are associated with a demolition permit. ...
0.00214457558 |
a/86966
opcd_oh_sdci_mha-c-amendments_ord
be provided prior to 19 issuance of the first construction permit other than a demolition, excavation, or ...
0.00214439165 |
a/64769
spu_2026_stormwater_code_ord_jan2026draft
of 5,000 square feet or more, 3 including demolition permits; 4 b. Applications for a building ...
0.0021442282 |
a/176460
447_hazmat_4
and Alternative D include demolishing buildings that may contain asbestos-containing building materials and/or lead-based paint. Perform ...
0.00214358582 |
a/100983
2006_entire_adopted_budget_document
and expenditures according to a system of funds and subfunds. In general, funds or subfunds are established to account for specific ...
0.00214355788 |
a/60998
8c - gsi manual
.............................................................................................. 13-5 Section 14. Permitting ...
0.002143215 |
a/113731
hala_report_2015
-approved plans by selecting from a catalogue or online resource, and they could be potentially provided at no cost. Pre-approved plans ...
0.00214319 |
a/118554