Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [14]
Departments [34]
Documents [2590]

Filters

Topics [14]
Departments [34]
Documents [2590]

Results

2551 to 2575 of 2629
  1. 2017_costestimatesmemo of major fixed facility items, lump sum items, and station amenities. The major fixed facility items included in the estimates are: • ...
  2. parks to be identified. This move permits the City to develop the Roy Street property in a manner consistent with the ...
  3. bgt missing link econ analysis report final 2019_0410 the duties of a flagger.” WAC 296-155-610(2)(e). This chapter does not apply to the normal operations of businesses, only construction, ...
  4. q1-2023-sbp-report and building demolition in thevicinity of the south portal of the SR99 Bored Tunnel. The work has been accelerated to ...
  5. lhpac Cultural Arts Center had called for a pottery room, but this provedimpossible because the building is not suitable for fire arts.In 1976, a ...
  6. sclannualreport2022 priority lists for poles to expedite permitting and construction timeframes. Since the program’s inception, City Light has ...
  7. sandpointnavalairstationlandmarkdistrictadopted7-3-13_withappendi ... associated with special events held by on-site organizations or by organizations including those issued a Special Event ...
  8. sandpoint-guidelines organizations or by organizations including those issued a Special Event Permit issued by Seattle Parks and Recreation. n. ...
  9. spr_2530adotpedcip are engaged in other trail-related projects. Trail projects that require significant design or permitting will be funded ...
  10. pioneersquare2015completereport6-2010 to help increase residential development•Expedite development projects through the City’s permitting process and streamline ...
  11. pioneersquare2015completereport06-2010 to help increase residential development•Expedite development projects through the City’s permitting process and streamline ...
  12. rrideroosevelt j line_fonsi final identified in the FONSI to FTA on a regular basis. With FTA approval, the mitigation measures may be modified during the final design, ...
  13. attachment a 2018 final mfte annual report with attachments of the first building permit. MFTE applications meeting eligibility requirements according to Seattle Municipal Code 5.73 ...
  14. appendix_d_madison_air_quality_dr are a type of bus lane located on the curbside and permit general traffic use for accessing driveways or crossing streets ...
  15. 1027summit_brief 1027summit_brief Cascade Home Design Page 1 (Photo from when owners purchased the home in 2019) 1027 Summit Ave Landmarks ...
  16. vol 3_a_bgt_feis_tech_appendix_a_web_lowrez . No building demolition would occur and no change in lot pattern. The Ballard Avenue Alternative would require approval of ...
  17. seattledesigncommission-2008.08.21epiphanyschoolalleyvacationminu ... with the construction of Fisher Pavilion, so that Fisher Pavilion could fulfill the need for a community building.  While the opera and ball ...
  18. seattle-bps-tag-5-slides-04.21.22 significant barrier to compliance, such that even an “alternative compliance” path isn’t feasible.•Exemptioncould be one compliance cycleor ...
  19. ncdstrategy spring 2015 by NCDs, based on survey & interest New construction, including infill development Demolition of contributing buildings ...
  20. spcneighborhoodsforall-execsummary without requiring demolition of the existing house. ■Provide technical and design resources for landowners and communities ...
  21. context-central-area It was designed by Somervell & Cote. When the building permit was issued in 1909, it was thought to be the most expensive ...
  22. 1027summit_presentation 1027summit_presentation Cascade Home Design Page 1 (Photo from when owners purchased the home in 2019) 1027 Summit Ave Landmarks ...
  23. lpb080625doylebuildingbp residential addition. Due to the small fl oor plate of the Doyle Building, a vertical addition is necessary to achieve project feasibility. ...
  24. technical meeting with commercial real estate_fordistribution GHGI Targets and building demolition (all requirements.)District Campus Decarbonization Plan:For campuses with district ...
  25. low income multifamily meeting slides_fordistribution status, sub-alt, or seismic upgrade, infeasible for low-income multifamily or structural/electric upgrades & more.Exemptions: Electric only ...