You just searched for:
Search
Filter Results
2476 to 2500 of 2609
light_projects
http://seattle.gov/documents/departments/financedepartment/0813adoptedcip/l ...
in the 1970's and 1980 are reviewed, updated, and evaluated as a first phase. This first phase study includes review of construction costs, ...
0.00217534 |
a/61264
1introduction
http://seattle.gov/documents/departments/financedepartment/1318adoptedcip/1 ...
of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm ...
0.00217534 |
a/61968
seattledesigncommission-2016.03.17portagebayparkminutes
http://seattle.gov/documents/departments/opcd/designcommission/portagebaypa ...
of the project. The park will start permitting, bidding, and construction in mid-2016 and is planned to open in late 2018. ...
0.00217534 |
a/85077
light_projects
http://seattle.gov/documents/departments/financedepartment/0813proposedcip/ ...
costs, permit and public review processes, and timetables.1st Quarter 20111st Quarter 2011BCL/Program Name:Power Supply and ...
0.00217534 |
a/61322
introductioncap
http://seattle.gov/documents/departments/financedepartment/1419adoptedcip/i ...
in their Capital Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two ...
0.00217534 |
a/62162
2021 update.annexiv.esf03.signed
http://seattle.gov/documents/departments/emergency/plansoem/2021 emap ...
buildings (tagging and retagging) utilizing City staff and qualified & certified volunteers • Permits – ...
0.00217534 |
a/57045
seattle_city_light
http://seattle.gov/documents/departments/financedepartment/0813adoptedcip/s ...
includes review of construction costs, permit and public review processes, and timetables.1st Quarter 20111st Quarter ...
0.00217534 |
a/61268
seattle_city_light
http://seattle.gov/documents/departments/financedepartment/0813proposedcip/ ...
, updated, and evaluated as a first phase. This first phase study includes review of construction costs, permit and public ...
0.00217534 |
a/61326
appendix_cip
http://seattle.gov/documents/departments/financedepartment/2631poposedcip/a ...
promenade along the Seattle waterfront following the demolition of the Alaskan Way Viaduct. The State of Washington has ...
0.00217534 |
a/173312
planning101digital11x17(0)
http://seattle.gov/documents/departments/seattleplanningcommission/planning ...
has a set of municipal codes, including land use codes that establish health and safety requirements (fire code, building and construction ...
0.00217534 |
a/108055
aug2016app
http://seattle.gov/documents/departments/sdot/safetyfirst/aug2016app.pdf
OVERHEAD HAZARDS FLYING OBJECTS VISIBILITY OTHER: FEET WORK ACTIVITIES: BUILDING MAINTENANCE CONSTRUCTION ...
0.00217534 |
a/104398
trwg meeting #3 slides_fordistibution
http://seattle.gov/documents/departments/ose/building energy/beps ...
to use prescriptive path as part of GHG report (2027-2030)•What documentation can be used to show work is complete?•Potential ideas: ...
0.00217534 |
a/160613
spr_2530proposedcip
http://seattle.gov/documents/departments/financedepartment/2530proposedcip/ ...
for lands lost at the Washington Park Arboretum and East Montlake Park for the development of the new State Route 520 Bridge and HOV ...
0.00217534 |
a/160789
constpermitstandardsnewcommproject
http://seattle.gov/documents/departments/sdci/forms/constpermitstandardsnew ...
(exterior wall to exterior wall) Overall dimensions of tenant space (if TI included in permit) Location and dimensions of ...
0.00217534 |
a/97923
lpb090325seattlecenterplayhouseexhallagmt
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
features of the landmark when associated with the removal or demolition of adjacent non-historic features (including those ...
0.00217534 |
a/172520
appendixa_2530adoptedcip
http://seattle.gov/documents/departments/financedepartment/2530adoptedcip/a ...
along the Seattle waterfront following the demolition of the Alaskan Way Viaduct. The State of Washington has built a deep ...
0.00217534 |
a/166648
fas
http://seattle.gov/documents/departments/financedepartment/16proposedbudget ...
: • Seattle Municipal Tower (SMT) weatherization program, and exterior repairs; • SMT elevator controls study; • SMT 14 ...
0.00217534 |
a/62649
fas
http://seattle.gov/documents/departments/financedepartment/16adoptedbudget/ ...
in 2015 and planned for 2016 include: • Seattle Municipal Tower (SMT) weatherization program, and exterior repairs; • SMT elevator ...
0.00217534 |
a/62574
planning101digital11x17
http://seattle.gov/documents/departments/seattleplanningcommission/planning ...
use codes that establish health and safety requirements (fire code, building and construction codes, etc). PermitsProperty owners apply for ...
0.00217534 |
a/108056
greenwoodrezonedirectorreportandrecommendations
http://seattle.gov/documents/departments/opcd/vault/greenwoodtowncenterrezo ...
in Subarea D may face future demolition if redevelopment occurs, totaling 6-10 dwelling units. The multifamily structures ...
0.00217534 |
a/87972
cityofseattleearthquakepreparednessactivitiescompletedandfutureef ...
http://seattle.gov/documents/departments/emergency/preparedness/hazardspeci ...
to “encourage” demolition. Do not want to “encourage” vacant, unused buildings. Emergency Role: Overview • Response ...
0.00217534 |
a/57242
prattpk
http://seattle.gov/documents/departments/cityarchive/sherwood/prattpk.pdf
for demolition. Advicatespotential for a fire arts center in thisplans to build new facilities,of the arts program were ...
0.00217534 |
a/141377
pedretailareasdeterminationofnonsignificance
http://seattle.gov/documents/departments/opcd/vault/pedestrianretailareas/p ...
, Seattle Municipal Code. SEPA DETERMINATION: [ ] Exempt [X] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions [ ] DNS involving ...
0.00217534 |
a/88118
d-c team review final rev 2 053017-sp
http://seattle.gov/documents/departments/economicdevelopment/arena ...
environment. C. Provide for design, permitting, development, demolition (if applicable), and ...
0.00217534 |
a/56228
dr-2015-10_ped boardupdate
http://seattle.gov/documents/departments/seattlepedestrianadvisoryboard/dr- ...
criteria for sidewalk closuresEstablishes clear criteria for allowing a sidewalk closure based on the SMC•Required for all ...
0.00217534 |
a/107855