Filter Results

1651 to 1675 of 3111
notes-2015-03-12(1)
that the goals ramp down over time. Some improvements are tied to the first project, including curb-bulbs, the traffic signal at 16th and ...
0.00215696543 |
a/77472
notes-2015-03-12(0)
that the goals ramp down over time. Some improvements are tied to the first project, including curb-bulbs, the traffic signal at 16th and ...
0.00215696543 |
a/77471
notes-2015-03-12
ramp down over time. Some improvements are tied to the first project, including curb-bulbs, the traffic signal at 16th and Cherry, the ...
0.00215696543 |
a/77473
9.appendixofneworexpandedcapitalfacilites
STK730309Activating and Connecting to GreenwaysThis project will increase the number of miles of safe pedestrian routes for all ...
0.00215696543 |
a/62538
160114sbabrvltr
Porter Michael Wong January 14, 2016 ...
0.00215696543 |
a/106992
2014_doit_annual_report_web
a facelift to our open data portal, ensuring that it provides the underlying resources to create new solutions to solve challenges in our ...
0.00215696543 |
a/70106
1_2020-10-19 - wshb - rp-cba_final (1)[2]
potentially impact surrounding neighborhoods. Any foundation retrofit work, which would include driving new piles to ...
0.00215696543 |
a/101260
2017_0418_fauntleroy_walk_and_talk_summary_final_v2
of Neighborhoods, complete comment forms Ia copy of the SEATTLE DEPARTMENT OF TRANSPORTATION FAUNTLEROY BOULVEARD PROJECT ...
0.00215696543 |
a/100540
resolution_3213_response_new_levy_programs
that are expected to deliver community co-created projects, including Neighborhood Scale Traffic Safety Programs, ...
0.00215696543 |
a/164431
2024_transportation_levy_readiness_approach
-Gilman Trail Missing Link  Neighborhood Greenways  Maintenance  New Program: Early readiness priority ...
0.00215696543 |
a/161121
sepachecklistdelridgends101514
with this proposal? If yes, explain. The City of Seattle Department of Transportation (SDOT) plans to build Neighborhood ...
0.00215696543 |
a/115445
2017 12-14 bpc minutes approved
Area a permanent fixture; this park sees dozens of dog owners every day and produces positive activation in the ...
0.00215696543 |
a/92172
sdot-vision-zero-toptobottomreview-fullreport
, such as the Safe Routes to School, Neighborhood Greenways, and Home Zone programs, which deploy a ...
0.00215625879 |
a/139131
levytomoveseattlesbab4.1.15
•Repair or restore 144 blocks of sidewalks •Build 117 blocks of new sidewalks •Restripe 5,000 crosswalks •Create "safe routes to schools" ...
0.00215625879 |
a/106899
rws implementation plan quarterly report_q2_6.28.21
Ave S ImprovementsPedestrian and safety improvementsPlanning2021Bike SurveyB07921st Ave SW Neighborhood ...
0.00215625879 |
a/101467
2021_lms_q2_report
Connection Neighborhood Greenways were completed in Q2, adding over three more miles to our bike network. ...
0.00215625879 |
a/99574
transportationlevytomoveseattlepresentation
in the Rainier Valley A Safe City 12 •Build 50 miles of protected bike lanes and 60 miles of greenways •Repair up to 225 ...
0.00215625879 |
a/107337
spab-march2014meetingnotes
Topic: East Howe Street Park—Pedestrian Pathway and Stairs Presenters: Brian Ramey, steering committee • Brian lives in the Eastlake ...
0.00215625879 |
a/107905
ne65th_vz_aprillistserv(0)
and 35th Ave NE paving projects to minimize and coordinate construction impacts. The future neighborhood ...
0.00215625879 |
a/106732
ne65th_vz_aprillistserv
Ave NE paving projects to minimize and coordinate construction impacts. The future neighborhood greenway ...
0.00215625879 |
a/106733
15th ave ne paving project_qanda
drainage improvements • Parking removal on 1 side of the street • Safe Routes to School and neighborhood ...
0.00215625879 |
a/102675
anticipated_projects_flyer_10_2019
Greenway Projects - Melrose NGW/PromenadeMarilyn Yim 206-684-3190 marilyn.yim@seattle.govQ2/2020NOProject Information: This ...
0.00215625879 |
a/99752
levydistrict5
walking – the Levy will look for ways to achieve this. Specific locations for neighborhood greenways and ...
0.00215625879 |
a/99255
levydistrict4
such as curb ramps and new sidewalks have not been identified. Specific locations for neighborhood ...
0.00215625879 |
a/99254
2017-suip-district-3-projects
MaintenanceY1/1/201712/31/2017YesBroadway Streetcar Extention10TH AVE EE ROY W STE ALOHA STSDOT Capital Projects and Roadway ...
0.00215625879 |
a/105808