Filter Results

9451 to 9475 of 10683
20230803_beacon 15thave_60 percent design public presentation
studies & parking management plan•Near-term safety enhancements installedIn progress•RPZ notification, parking sign modifications, ...
0.003019525 |
a/145551
aeg_drawings and plans_rfp response redevelopment of keyarena at ...
and iconic status of Seattle Center does not come to be by accident. Decades of concepting, input, design, and planning—by ...
0.003019525 |
a/56142
2017biennialreport
of using a Democracy Voucher Replacement Form for campaigns. This option was developed with input from campaigns, local ...
0.003019525 |
a/129231
2022solidwastedraftch5
Product Stewardship Council packaging policy committee. Extended Producer Responsibility for Packaging and Paper Products SPU and King ...
0.003019525 |
a/126529
roosevelthtcppt_120815
(second round) December 9 – TOPS in Eastlake December 10 – UW Tower in University DistrictJanuary - March 2016: Review Public ...
0.003019525 |
a/106347
adoptedufcmeetingnotes040721
://web6.seattle.gov/DPD/DirRulesViewer/Rule.aspx?id=17-2018 Public input: (see next page and posted notes) 4 From: ...
0.003019525 |
a/119163
section 6a final press ready
Committee Emergency Management Council 2012) listed some generic goals, the Oregon Resilience Plan was further developed and included more ...
0.003019525 |
a/113566
ngpb_factfolio_20170424
design (enclosed)More open structure and more graceful bridge transitionWHAT WE’VE HEARDWe value the community input ...
0.003019525 |
a/100776
2017annualwastewatercollectionsystemreport
a better understanding of additional flow inputs to the Lake Line. In 2018, per the approved Plan, SPU will implement the ...
0.003019525 |
a/114367
oigserwave1report07222021
of involvement: •OIG initiated the process by gathering data and input from numerous sources to describe andanalyze the ...
0.003019525 |
a/79765
oigserwave1report072221
of involvement: •OIG initiated the process by gathering data and input from numerous sources to describe andanalyze the ...
0.003019525 |
a/79766
2012smcintro
appliances and vessels. It applies to all types of boilers and pres-sure vessels, regardless of size, heat input, operating ...
0.003019525 |
a/97241
oneseattleplanfeis-chapter3.4-energynaturalresources
by the United States Environmental Protection Agency (EPA). Substantial reductions in energy inputs for construction ...
0.003019525 |
a/165720
lidi5guidingprinciplesstudyassumptionspresentation2019
a comprehensive planning process with significant public input•Geospatial boundaries for the LFS urban context analysis ...
0.003019525 |
a/87198
2025-2030stratplan
input from City Light’s Review Panel, customers, and stakeholders, adjust for new forecasts, and report our progress. This ...
0.003019525 |
a/159816
lpbcurrentnom_northgateapp 3_sps history
District Number 1 History, General Historical and Building Context A3-1 1. Introduction This report was prepared by Larry E. Johnson, AIA, ...
0.003019525 |
a/74514
cao2024q1report
five business days (seven calendar days). Domestic violence referrals are afforded an additional week to engage in a trauma informed ...
0.003019525 |
a/156965
lpbcurrentnom_rainier_beach_app 3_sps history
District Number 1 History, General Historical and Building Context A3-1 1. Introduction This report was prepared by Larry E. Johnson, AIA, ...
0.003019525 |
a/74527
16-006_slanderst_sbab_presentation_10-5-16 final
this option Proposed design – WEST of tracks 30 Occidental Ave S: •Proposed dead-ends •Based on community feedback, stakeholder ...
0.003019525 |
a/107109
2015_crisis_intervention_report
calls by the perceived nature of the crisis has already enabled the Crisis Intervention Unit, through Crisis Intervention Coordinator Sgt. ...
0.003019525 |
a/94410
2015_0604_fmnl
2015_0604_fmnl ...
0.003019525 |
a/60146
2018annual_report_0114_2018
the assessment we wish to highlight two other topics of concern which came to our attention in 2018: Bicycle Safety subprogram The 2018 ...
0.003019525 |
a/107842
wmbe_plans_2018
approval and inputs the final goals into City contracting documents as needed. • WMBE Quarterly Reports: FAS/CPCS ...
0.003019525 |
a/59024
loc_011315
appointed by the Mayor with input from City Council. H. Miller added that four new LOC members will be appointed. ...
0.003019525 |
a/79036
rvsc2023march
neighborhood input on home zone plan•Determine outreach strategies with steering committee and PTSA•Future meetings to be ...
0.003019525 |
a/140925