Filter Results

7301 to 7325 of 10683
ballard_greenwaybgt_folded_mailer_final
ballard_greenwaybgt_folded_mailer_final PO Box 34996Seattle, WA 98124-4996SEE MAP INSIDE!Mark your calendars and attend our open house to ...
0.003019525 |
a/102018
dpd
review proposed construction plans as part of a developer's permit application. Staff then facilitate the process to elicit public ...
0.003019525 |
a/62208
general_government
projects, FAS maintains and annually updates a plan based on its maintenance and facility assessment efforts, balanced with ...
0.003019525 |
a/61790
mtgnotes_20230419
, 2023, Meeting Minutes. Minutes were approved as presented. Communications to Panel. None General Manager’s update: 1. Curbside Chargers ...
0.003019525 |
a/142411
2021-22_drc_contract_sampleagreement_21_0331 (1)
document and all the materials prepared by the Consultant for the City under this Agreement. If requested by the City, a copy of all ...
0.003019525 |
a/70335
pdocmeetingsummary121719
in January. This effort will include video, printed copies, and on-line and be distributed to staff, community, and elected officials. • ...
0.003019525 |
a/92492
general_government
efforts, balanced with input from various sources including community groups, customer departments, and elected officials. ...
0.003019525 |
a/61635
psb-7-15-20
was altered post-1949 earthquake and there is no appearance of original façade elements. Mr. Aalfs requested input on ...
0.003019525 |
a/73738
psb3-2-16_minutes
and preservation of affordable housing. He said the Housing Affordability and Livability Advisory (HALA) Committee has 28 members, 50+ ...
0.003019525 |
a/73763
mb_final_magbridge_newsletter_oct07_v3
•Thank you, project Design Advisory Group!{NEW!}Bridge type selected and design features recommended: After receiving public ...
0.003019525 |
a/101165
2012smcchapter3
whereapproved and converted in accordance with the manufac-turer’s instructions. The fuel input rate shall not be ...
0.003019525 |
a/97232
customersurveyreportmarch2017
completed between February 27 and March 9, 2017. The interviews were approximately 10 to 12 minutes long. The questionnaire used in the ...
0.003019525 |
a/94442
mpac minutes 03.13.2024
. Waiting for community input on next steps to determine outcome. Magnuson Building 11 Restaurant Accessibility ...
0.003019525 |
a/156852
beaconhill_bl_presentation script_final
Street. Our next step is to identify where to make up to 20 miles of Stay Healthy Streets permanent. In September, we’ll build off ...
0.003019525 |
a/100253
psb11-16-16_minutes
it is a pilot so that the community can give input. He said the study is about the lamps and lenses – not the poles. He ...
0.003019525 |
a/73749
customersurveyreportjune2017
approximately 10 to 12 minutes long. The questionnaire used in the interviews was developed with Department input and ...
0.003019525 |
a/94438
2022_10_14-guidelines-streetart
of formal notice of the decision. • The Director shall consult with staff and/or members of the peer panel for input in ...
0.003019525 |
a/135085
myr_2015_16sy
and implemented, using input from schools staff and students. o The Empowerment Math Project (EMP) supported teachers, ...
0.003019525 |
a/79132
draftufcommissionupdatedbylawsfor020321discussion
visit if presented prior) regarding the topic? Changes can include new guidelines, staffing levels, budget levels, scope of work, etc. o ...
0.003019525 |
a/119127
s henderson stairway_survey summary_final
% DESIGN OUTREACH SUMMARY Executive Summary In fall 2020, we began outreach to gather input on the 60% design phase as well ...
0.003019525 |
a/103782
notice-2013-07-18
connector would need much better signage. Eileen DeArmon stated tht SMC is proposing that there be a future Design Workshop to discuss and ...
0.003019525 |
a/77507
notes-2013-07-18
connector would need much better signage. Eileen DeArmon stated tht SMC is proposing that there be a future Design Workshop to discuss and ...
0.003019525 |
a/77427
2019 revised master list of surveillance technologies
. It was compiled with active input of all City departments. The Master List was compiled through the process detailed in ...
0.003019525 |
a/117295
mt-baker-north-rainier-snapshot
EffortsPlanning Projects asking for inPut Housing/Homelessness/Land Use• Housing Affordability & Livability Agenda• ...
0.003019525 |
a/72508
sprstrategicplanimplementation
sprstrategicplanimplementation 2021 STRATEGIC PLAN IMPLEMENTATION Reconnecting with our community to focus our priorities. In early ...
0.003019525 |
a/119142