Filter Results

5176 to 5200 of 10683
ballarddraftudflanduseandudmay2015
with the UDaT to host 4 open houses to provide community input and review of the committee work. The open houses focused ...
0.00302357 |
a/86269
prelimdrafteis-2013-11-07
Affected Environment 3.2.2.1 Existing Sound Levels (awaiting input from SSA – current noise monitoring is being performed) ...
0.00302357 |
a/77558
projectsummaryreport
backups was collected from SPU records and from community input. Five areas were identified as the focus for analysis based ...
0.00302357 |
a/113048
pspb0504_bb_pres
drivers•Easily daisy chain (jumper wire & end-to-end)•Input Voltage: 120-277V•Wet Rated•IP66 TestedUtility lighting for ...
0.00302357 |
a/127728
occ_sbab_near-termprojects2017_0802
TransitMetro and Sound Transit are already reaching out to transit riders and communities to get input on transit service ...
0.00302357 |
a/107160
lpbcurrentnom_ingraham_high_school
. Additional input was received from Susan Boyle, A.I.A., of BOLA Architecture + Planning. Ingraham High School Landmark ...
0.00302357 |
a/74487
pres_cac_spu-revisions_22-09-21.reduced
, with input from the CAC, to develop methods and parking demand management strategies to reduce the number of ...
0.00302357 |
a/134318
p-patchrejuvenateplan_2016-05-26
-Patch staff identifi ed some gardeners who were not able to provide input by means of a computer so they were contacted and ...
0.00302357 |
a/92923
finalsupplementaleis
Solid Waste Intermodal Transfer Facility 3-45 Final SEIS Part 3, Land and Shoreline Use efficient use of resources by utility customers. ...
0.00302357 |
a/113459
northlakealternativesevaluation
Replacement Alternatives Basis for Preliminary Design Preliminary analysis and design development for the alternatives considered the ...
0.00302357 |
a/101238
udistrictdirectorsreport
population are met.Overall responseAt each major public input phase (2013, 2014, 2016), public comments have fallen into a ...
0.00302357 |
a/87829
2020annualwastewatercollectionsystemreport
of the facility based on input from the community and the Seattle Design Commission. The 60% design also received approval ...
0.00302357 |
a/114389
2018-caper-final
practices to meet the system's requirements. From these reports, gleaned from the activity performance numbers we’ve ...
0.00302357 |
a/69709
ddr7-2015udistrictalleyactivation.3
concepts. PROCESS & TIMELINETask 3: Develop Activation PlanBased on input from alley stakeholders, the options presented ...
0.00302357 |
a/99168
lpbcurrentnom_alki_elem
was prepared by SPS consultant Susan Boyle, Principal of BOLA Architecture + Planning, Seattle, with input and reviews by ...
0.00302357 |
a/126630
alki_es_nomination_application
was prepared by SPS consultant Susan Boyle, Principal of BOLA Architecture + Planning, Seattle, with input and reviews by ...
0.00302357 |
a/126928
2023_0216_gsb_sdc presentation
utilized to maximize heat dissipation and promote long LED life.- Single (M) or dual (B) light emission.- Type III light distribution ...
0.00302357 |
a/138937
shivav6.3final
is that the Seattle Fault is active about every 1,000 years. Based on the type of research described in this document and other ...
0.00302357 |
a/57146
seattledesigncommission-2021.02.04southparkplaza_presentation
dreamed of a river walk and increased open space to increase livability and overcome historic inequities.Site5Options shared Spring, Summer ...
0.00302357 |
a/85939
seattledesigncommission-2021.02.04southparkplaza_presentation(0)
dreamed of a river walk and increased open space to increase livability and overcome historic inequities.Site5Options shared Spring, Summer ...
0.00302357 |
a/85938
lpbcurrentnom_vanasselt
1989, p. 192 142 Erigero. 143 Larry E. Johnson, AIA, The Johnson Partnership, May 2013. Additional input was received from ...
0.00302357 |
a/74565
stc_report_to_council_vers3
proposed amendment also identifies a data-driven approach to mapping transit community boundaries that would be augmented with ...
0.00302357 |
a/109277
shapeourwater-sealevelrise
System Analysis\02-Plan Inputs\G-GIS\To Aqualyze Prioritization-Layers.mpk high use area Public and private schools (Figure ...
0.00302357 |
a/133749
southlakeunioneischapter3clarificationscorrectionsexpandeddiscuss ...
neighborhood based on input from Comment Letter #89. Please see also response to Comment #4 in Letter #89 in Chapter 4 of ...
0.00302357 |
a/87708
lsaig-pres
spaces of differing sizes • Reflect the culture of the neighborhood ISRD Comments: • Consider an integrated amphitheater space working ...
0.00302357 |
a/73347