Filter Results

4726 to 4750 of 9825
final - biennial report - 03_15_2018(0)
. Campaigns had the option of using a Democracy Voucher Replacement Form for campaigns. This option was developed with ...
0.00303894258 |
a/58076
ebr-2011-2012-report
inputs on building plans or measurements.0King County Assessor Square Footage (thousands sf)Portfolio Manager Square ...
0.00303894258 |
a/88297
ebr-2011-2012-report
inputs on building plans or measurements.0King County Assessor Square Footage (thousands sf)Portfolio Manager Square ...
0.00303894258 |
a/57400
oneseattleplansummaryoverviewtagalog
diyaar ah.ቋንቋ የማስተርጎም፣ የመተርጎምና የመስተንግዶ አገልግሎቶች ይቀርባሉ።언어 통역, 번역 및 편의사항이 제공됩니다.Kontakin ang Seferiana.Day@Seattle.gov, (206) 482-2332.Mahalaga ...
0.00303894258 |
a/154152
spd-mcpp-implementation-evauation-final-report
, and quality of life strategies in 55+1 Seattle neighborhoods in the five police precincts across the city. The MCPP was developed from the ...
0.00303894258 |
a/94491
film task force final report_with attachments
tactics to grow the legacy and strengthen the reputation of Seattle as a filmmaking city, solicit input from, and link a ...
0.00303894258 |
a/142129
lpbcurrentnom_uw_canoe_house
by BOLA Associate Sonja Molchany with input from Principal Susan Boyle, AIA. Seattle’s Landmarks Process Note: This ...
0.00303894258 |
a/74559
part 3 isdm
Having a voice makes people feel that they are a part of the process and that they have input in the decision, even if it ...
0.00303894258 |
a/53012
recommendationreport
departure committees 5 mitigated these problems by implementing a traffic management plan with input from the school and ...
0.00303894258 |
a/77936
lpb062624firestation6pp
):57,500Rated Heating Capacity (Btu/hr):57,000Cooling Input Power (kW):5.82Heating Input Power ...
0.00303894258 |
a/157543
lpb061424firestation6pp
):57,500Rated Heating Capacity (Btu/hr):57,000Cooling Input Power (kW):5.82Heating Input Power ...
0.00303894258 |
a/157146
lpb031524williamgrosefs6bp
):57,500Rated Heating Capacity (Btu/hr):57,000Cooling Input Power (kW):5.82Heating Input Power ...
0.00303894258 |
a/153782
geotechnicalreport1988
engineering recommendations may be properly interpreted and implemented in the design and specifications. As the design continues it is ...
0.00303894258 |
a/77402
ballardrezonedirectorsreport_3-30
, design standards, transit, public spaces, and development. Community-wide open houses (370+ attendees): OPCD and SDOT worked with the UDaT ...
0.00303894258 |
a/86273
alki point kms community engagement - 11-10-2021
and opportunities11/1/2021Department of Transportation 3Presentation overview•Background•Project area•Existing conditions of the Keep ...
0.00303894258 |
a/103881
alki-point-public-presentation_oct2021
and opportunities10/25/2021Department of Transportation 3Presentation overview•Background•Project area•Existing conditions of the Keep ...
0.00303894258 |
a/152256
finalboards_compiled
to different programs that serve a multilingual audience.Online SurveyCurrently live, the community can provide the project team with ...
0.00303894258 |
a/106544
2018-annual-report
OPA’s classification of complaints and providing input as to classification of decisions, the scope of any subsequent ...
0.00303894258 |
a/84028
upcoming_opportunitiesv.9
. At this point the vendor will proceed to Task 1: Create Dynamic EVSE Siting Model (Weeks 2-8). The vendor will work with the Project ...
0.00303894258 |
a/99794
upcoming_opportunitiesv.11
to finalize the model’s technical framework, inputs, outputs, criteria, and constraints and to develop a dynamic heatmap ...
0.00303894258 |
a/99779
upcoming_opportunitiesv.12
technical framework, inputs, outputs, criteria, and constraints and to develop a dynamic heatmap model for EVSE siting. The ...
0.00303894258 |
a/99780
upcoming_opportunitiesv.10
will work with the Project Manager to finalize the model’s technical framework, inputs, outputs, criteria, and constraints ...
0.00303894258 |
a/99778
northgateguidelines
....................................................................................24Northgate Urban Center and Overlay District Design ...
0.00303894258 |
a/87958
northgatedg2013
....................................................................................24Northgate Urban Center and Overlay District Design ...
0.00303894258 |
a/96347
stp implementation plan and levy delivery plan
_Plan.pdf3Council Adopted April 2024 Directs 3-5 Yr Implementation Plan Integrates and replaces modal plansBike, Pedestrian, Freight, ...
0.00303894258 |
a/169058