Filter Results

3326 to 3350 of 10683
sdot ada transition plan 2020 update
in this plan. Priorities have been determined through SDOT analysis and public input. Schedules for barrier removal ...
0.0030266738 |
a/104575
2016_finditfixit_belltown_updates_report
in areas where conditions are difficult and where people need to be able to walk the most. SDOT collected public input, ...
0.0030266738 |
a/72565
2016 ocr annual report final spread
plan. SOCR convened stakeholders to provide input on addressing barriers to housing for those who use subsidies and other ...
0.0030266738 |
a/51701
2016 draft ocr annual report - final
housing. Two major pieces of legislation have resulted from this action plan. SOCR convened stakeholders to provide input ...
0.0030266738 |
a/51699
oneseattleplandrafthousingappendix
rate hikes and many other variables, can slow overall housing starts and stall individual projects that may no longer be profitable to ...
0.0030266738 |
a/154690
longfellownds_24thaveswcooridor-early_design_drop-insessionboards ...
2020DRAFT POTENTIAL DESIGNFINALIZE + OBTAIN PERMITS60%DESIGNSITING, FIELD INVESTIGATIONSSURVEY + CONCEPT DEVELOPMENT2017 to ...
0.0030266738 |
a/115129
2017-11-30_open house report_lowres2
one more community event in the winter/spring of 2018 to further the process. OVG is pleased with the level of input and ...
0.0030266738 |
a/56132
housingchoicesbackgroundreport
potential responses. In addition to public presen-tations and targeted outreach to underserved communities, the City has also developed an ...
0.0030266738 |
a/87090
ballardnovember2015openhousesdotdraftprojectboards
to provide north-south access for people who walk and bikeDesign elements will be identified in 2016 through technical analysis and ...
0.0030266738 |
a/86271
bagban-2019update
recommends providing input on these bills to ensure they are in line with the Responsible Recycling Framework and ...
0.0030266738 |
a/116301
june_2023_workshops_ppt
for the Aurora Ave corridor as well as goals and objectives to guide our work▪Co-create long-range concept design options for the ...
0.0030266738 |
a/143741
2018_0423_mslevy_eval_council_report_final_printable
as needing further review and adjustment. SDOT will seek input from key stakeholders to inform next steps on findings 1-3. ...
0.0030266738 |
a/99514
tab_levy-work-plan-assessment-report_may2018
further review and adjustment. SDOT will seek input from key stakeholders to inform next steps on findings 1-3. SDOT will ...
0.0030266738 |
a/117702
madisonstreetbrt_openhouseboards_march2017
madisonstreetbrt_openhouseboards_march2017 MADISON STREET BUS RAPID TRANSITwww.seattle.gov/transportation/MadisonBRT.htmWelcome!Public ...
0.0030266738 |
a/106037
2020-2025sevisionstrategyrrt
systems, policy and offerings.The Special Events Assessment and Planning Project took place in May through December of 2019 with the ...
0.0030266738 |
a/147318
freight
allocations with input from vulnerable communities. (Supports Key Move TJ1f and TEF 19.1, 25.4) F16 Support the ...
0.0030266738 |
a/158025
annualreporttocouncilknotweedtreatment20132015
(Gerber et al. 2008); and  alter the quality, quantity, timing, and chemistry of leaf inputs into riparian areas and ...
0.0030266738 |
a/114571
2003standardspecs
CityDepartments and outside agencies who participated in the effort of providing input, discussing, and reviewing ...
0.0030266738 |
a/113653
slr draft alternatives - presentation
the alternatives (not choosing today!)• Summarize clear direction to the SLR team to create three refined alternativesJUNE 3RD COMMUNITY ...
0.0030266738 |
a/151427
stsc2020report_adafinal
in June of 2019 and pro-vided input to SDOT on where infrastructure improvements, such as stop signs, crosswalks, and ...
0.0030266738 |
a/105680
geotechnical-evaluation-groundwater-18th-cherry-street-medical-of ...
with the International Building Code (IBC) 2015 (International Code Council, 2015). For the IBC 2015, the seismological ...
0.0030266738 |
a/77400
lpb031023whitegaragebp
VWUXFWXUHThe design team explored massing options, with the Boards input in mind, and found a preferred solution that is ...
0.0030266738 |
a/139478
siffbriefing
2Briefing Purpose•Share an overview of the Denny Way Paving Project at the 60% design milestone. •Provide an opportunity for stakeholder ...
0.0030266738 |
a/150041
youthcare briefing
•Share an overview of the Denny Way Paving Project at the 60% design milestone. •Provide an opportunity for stakeholder ...
0.0030266738 |
a/150376
wallingford-small-group-summaries
 No one-size-fits-all solution for Urban Villages  Don’t forget about the “L” in HALA  Neighborhood input into ...
0.0030266738 |
a/54153