Filter Results

2476 to 2500 of 10637
m12_presentation
#2: input on version 2M12, FLSTargeted group zoom meetingsSep 2021Target Group Meeting #2M12, FLSIncorporate community ...
0.00302929059 |
a/73358
lpb080322gllibrarypres
(Input Only)Pass through(Input/Output)Not installed(Strip not installed in factory)Profile with stainless ...
0.00302929059 |
a/131768
tmp2016ch3
Advisory Group (TMPAG): The TMPAG included 25 members appointed by the Mayor and City Council. The group met monthly and provided detailed ...
0.00302929059 |
a/105937
sdot_bike and ped safety analysis_ph2_2420
to link outcome variables (e.g., number of people walking or bicycling, number of crashes) to a set of input variables ...
0.00302929059 |
a/106815
sdot_bike and ped safety analysis_ph2_2420(0)
to link outcome variables (e.g., number of people walking or bicycling, number of crashes) to a set of input variables ...
0.00302929059 |
a/106814
counciladopted2019_citywideplanning
those decisions.The City has adopted master plans to address nonautomobile modes of travel—pedestrian, bicycle, transit, and freight ...
0.00302929059 |
a/87542
220831 ma_don (alki es departures presentation) r2
of the process is the engagement with city agencies and school district departments that have input on the development of ...
0.00302929059 |
a/133193
counciladopted2017_citywideplanning
framework for making those decisions.The City has adopted master plans to address nonautomobile modes of travel—pedestrian, bicycle, ...
0.00302929059 |
a/87531
counciladopted2018_citywideplanning
adopted master plans to address nonautomobile modes of travel—pedestrian, bicycle, transit, and freight movement—drawing on extensive ...
0.00302929059 |
a/87536
counciladopted2020_citywideplanning
for making those decisions.The City has adopted master plans to address nonautomobile modes of travel—pedestrian, bicycle, transit, and ...
0.00302929059 |
a/87548
northlot_joint_presentation
the entry from the northern approach. Final mural design will happen in conjunction with a local artist and community ...
0.00302929059 |
a/75372
oneseattleplandeisenviornment
essential benefits, including the following: â–ª Sequestering carbon (i.e., capturing and storing carbon dioxide from the atmosphere, reducing ...
0.00302929059 |
a/153551
seattledesigncommission-2017.05.18northgatepedbridgepresentation
| ALTA 3 •Design input and outreach work with North Seattle College •Design and schedule coordination with Sound Transit ...
0.00302929059 |
a/85033
igd_full plan_ada
and Goods: Create efficiency where needed to keep streets movingAccess to Opportunity for AllVALUESCommunity values—as articulated through ...
0.00302929059 |
a/103916
app c rapidride roosevelt transportation technical report
, provides assumptions for existing and future year (No Build and Build alternatives) input values and assumptions when ...
0.00302929059 |
a/106301
igd_fullplan_final_ada
where needed to keep streets movingAccess to Opportunity for AllVALUESCommunity values—as articulated through public input ...
0.00302929059 |
a/135860
finaleisdec2014
the planning process. From the December 13, 2012, through October 2014, the CAC held 22 committee meetings to provide comments and ...
0.00302929059 |
a/77394
highlandparkwayswconnection_outreachsummary_feb2025
highlandparkwayswconnection_outreachsummary_feb2025 Summary About the Project In spring 2024, the Seattle Department of Transportation ...
0.00302929059 |
a/166282
retsummarysheet_dvp_2016
Equity Toolkit (RET) Summary Sheet: Cover Sheet and Questions This Summary Sheet should be completed by those who worked on this RET with ...
0.00302929059 |
a/90502
retsummarysheet_ufmp_2018
and Questions This Summary Sheet should be completed by those who worked on this RET with input from Change Team members ...
0.00302929059 |
a/90512
01-24-02
of the three JAFDP community meetings. After reviewing the JAFDP he would urge the rejection of this version. He would like more of the ...
0.00302929059 |
a/91908
11-13-03
provides that if a new park is built, or a significant re-design occurs in an existing park, a skateboard park would be considered - ...
0.00302929059 |
a/91948
05-10-07
the original report up to date. Public Involvement Process Bands of Green was developed over a two-year period with extensive ...
0.00302929059 |
a/92018
07-24-03
, Initiate Funded Capital Projects, or Make Changes to a Park or Facility 060-P1.9.2 5.0 Policy 5.1 It is the policy of Seattle Parks and ...
0.00302929059 |
a/91941
05-24-12
Action Staff would like the Board’s input on the second draft of the Strategic Plan, with particular emphasis on the ...
0.00302929059 |
a/92121