Stormwater Code and Manual Update 2026 - Project Documents

Project Documents
2nd Public Review Draft – January 2026
The following table outlines the summary of changes made to the Stormwater Code and Manual for the second public draft.
- Summary of Changes to Stormwater Code & Manual (January 2026)
Second public review (January 7 – February 9, 2026) draft documents for the 2026 City of Seattle Stormwater Code and Stormwater Manual update.
- Draft Stormwater Code Ordinance (January 2026)
- Draft Stormwater Manual Figure Revisions (January 2026)
- Draft Stormwater Manual (January 2026, unless noted otherwise)
- Volume 1 – Project Minimum Requirements
- Volume 2 – Construction Stormwater Control
- Volume 3 – Project Stormwater Control
- Volume 4 – Source Control
- Volume 5 – Enforcement
- Appendix A – Definitions
- Appendix B – Additional Submittal Requirements
- Appendix C – On-site Stormwater List BMP Infeasibility Criteria
- Appendix D – Subsurface Investigation and Infiltration Testing for Infiltration BMPs
- Appendix E – Additional Stormwater Design Requirements
- Appendix F – Hydrologic Analysis and Design
- Appendix G – Stormwater Control Operations and Maintenance Requirements
- Appendix H – Financial Feasibility Documentation for Vegetated Roofs and Rainwater Harvesting
- Appendix I - Landscape Management Plans and Integrated Pest Management
- Appendix J* – Plant and Tree List
*Note that the 1st Draft Appendix J titled “Contaminated Sites” has been deferred. Appendix J is now titled “Plant and Tree List.”
1st Public Review Draft – July/August 2025
The following documents table outlines the summary of changes we made to the code and manual for the first public review period (July 8 – August 15, 2025).
- Summary of Changes to Stormwater Code & Manual (July 2025) (Revised September 2025 with initial responses to public comments July 2025)
First public review (July 8 – August 15, 2025) draft documents for the 2026 City of Seattle Stormwater Code and Stormwater Manual update.
- Draft Stormwater Code Ordinance (July 2025)
- Draft Stormwater Manual Figure Revisions (July 2025)
- Draft Stormwater Manual (July 2025)
- Volume 1 – Project Minimum Requirements
- Volume 2 – Construction Stormwater Control
- Volume 3 – Project Stormwater Control
- Volume 4 – Source Control
- Volume 5 – Enforcement
- Appendix A – Definitions
- Appendix B – Additional Submittal Requirements
- Appendix C – On-site Stormwater List BMP Infeasibility Criteria
- Appendix D – Subsurface Investigation and Infiltration Testing for Infiltration BMPs
- Appendix E – Additional Stormwater Design Requirements
- Appendix F – Hydrologic Analysis and Design
- Appendix G – Stormwater Control Operations and Maintenance Requirements
- Appendix H – Financial Feasibility Documentation for Vegetated Roofs and Rainwater Harvesting
- Appendix I - Landscape Management Plans and Integrated Pest Management
- Appendix J – Contaminated Sites
- (still under development)Appendix K – Plant and Tree list