Stormwater Code and Manual Update 2026 - Project Documents

salmon

Project Documents

2nd Public Review Draft – January 2026  

The following table outlines the summary of changes made to the Stormwater Code and Manual for the second public draft.

Second public review (January 7 – February 9, 2026) draft documents for the 2026 City of Seattle Stormwater Code and Stormwater Manual update.

*Note that the 1st Draft Appendix J titled “Contaminated Sites” has been deferred. Appendix J is now titled “Plant and Tree List.” 

1st Public Review Draft – July/August 2025

The following documents table outlines the summary of changes we  made to the code and manual for the first public review period (July 8 – August 15, 2025).

First public review (July 8 – August 15, 2025) draft documents for the 2026 City of Seattle Stormwater Code and Stormwater Manual update.

Construction and Inspections

Brooke D. Belman, Director
Address: 700 5th Ave, Suite 2000, Seattle, WA, 98104
Mailing Address: P.O. Box 34019, Seattle, WA, 98124-4019
Phone: (206) 684-8600
Phone Alt: Violation Complaint Line: (206) 615-0808
Contact Us

Newsletter Updates

Subscribe

Sign up for the latest updates from Construction and Inspections

SDCI issues land use, construction, and trade permits, conducts construction and housing-related inspections, ensures compliance with our codes, and regulates rental rules. SDCI is committed to an antiracist workplace and to addressing racism through our work in the community.