Filter Results

4151 to 4175 of 10670
mha_feis_notice_of_availability
, such as increases in maximum height and floor area ratio (FAR) limits; modifying certain rezone criteria in the Land Use Code; making ...
0.00308980537 |
a/65070
sipformalreviewapplicationmaterialandmylartransmittalform20181203 ...
(if not previously submitted) 1 Electronic file of 90% Complete Street Improvement Plan Checklist in PDF format (if not previously ...
0.00308980537 |
a/104857
april28finalminutes
that mapping would be done later was under everyone’s radar. Carol did not realize that DPD was going back and revisiting ...
0.00308980537 |
a/108411
caseno09-wbi-0320-1
the locations of the Mayor’s house, the Deputy Mayor’s house and the SDOT Director’s house on a West Seattle map, and ...
0.00308980537 |
a/130675
projectscopeanddetailsform
1/1/2012 Page 3 of 4 Revised 04/06/2016 Plan Requirements for a 30% + Plan: A complete base map and survey of the existing ...
0.00308980537 |
a/104839
spab-july2014meetingnotes
in the office and in the field for each project o Traveler Engagement: need to give people actionable engagement, and are working on ...
0.00308980537 |
a/107903
slurryseal_faq
on the attached map, your street will likely be closed from the early morning hours into the late afternoon on the day of ...
0.00308980537 |
a/168691
slurryseal_faq_english
is marked in red on the attached map, your street will likely be closed from the early morning hours into the late ...
0.00308980537 |
a/169466
spabjunemeetingminutes
. Mapped out eight quarter and half mile walk sheds to generate heat map of demand. Shows highest ...
0.00308980537 |
a/107924
cam2213
to the project and include existing surface improvements, utilities, and site conditions. f. Base Map and Survey Checklist ...
0.00308980537 |
a/101620
slurryseal_faq_2026
in red on the attached map, your street will likely be closed from the early morning hours into the late afternoon on the ...
0.00308980537 |
a/179176
cam2200
Project and Construction Coordination Map, an interactive tool displaying current and future construction projects in the ...
0.00308980537 |
a/101609
guideforuwelementpresentation
stations are planned and funded, and the Places where two corridors that currently provide frequent transit service intersect, as shown in ...
0.00308980537 |
a/108700
wg5_2.18_agenda
wg5_2.18_agenda CID Framework and Implementation Plan Work Group 5 - Public Realm February 22, 2018 Meeting Time: 4:00-5:30 pm Location: ...
0.00308980537 |
a/86627
bgt_sepafinalchecklist60thgg9-14-06
the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic ...
0.00308980537 |
a/100468
sip_suveybasemap_checklist_form (20220207)
Engineering Quarter-Section maps are not an approved reference resource.Lines referencing the ROW, centerlines, monument ...
0.00308980537 |
a/105746
sip_suveybasemap_checklist_form (2022)
Engineering Quarter-Section maps are not an approved reference resource.Lines referencing the ROW, centerlines, monument ...
0.00308980537 |
a/105745
2015accomplishments
updated, including the Future Land Use Map, the Urban Village Element, the Land Use Element, the Transportation Element, ...
0.00308980537 |
a/108116
dag_4_meeting_summary_final
Advisory Group #4 – Summary Minutes – 1/8/03 12 Kenworthy Can we get copies of these maps, and also a statement of the ...
0.00308980537 |
a/101083
170104_sbab_minutes
annual update to SBAB in February. • ...
0.00308980537 |
a/107045
quasi-judicial-rules
Land Use Map (rezones), except for area-wide amendments; 2. Approval of a property use and development agreement (PUDA) ...
0.00308980537 |
a/54534
sbab_minutes_sept2016
COMMENT • ...
0.00308980537 |
a/107099
feb142008approvedminutes
) Amend the Future Land Use Map (FLUM) to redesignate areas within the Livable South Downtown study area from Industrial to ...
0.00308980537 |
a/108559
bldminutes10-11-18
details and a map. The relevant guideline was 13. Signs. Applicant Comment: Ramona Abbasian showed color/material samples ...
0.00308980537 |
a/72744
projectscope_form_250602
Requirements for a 30% + Plan:A complete base map and survey of the existing conditions that includes the right of way ...
0.00308980537 |
a/169395