Seattle City Light Standards Publications
Construction Standards
- http://www.seattle.gov/light/engstd/docs2/NCI-210.pdf
-
Cable Accessories for 1000 KCMIL, EPR, 15 kV Flat Strap Triplexed Network Cable 623670 - NCI-210
- http://www.seattle.gov/light/engstd/docs2/NCB30.pdf
-
GROUNDING NETWORK SYSTEM, WET VAULT, NON-TRANSFORMER ONE OR TWO 48-INCH BUS BARS - NCB-30
- http://www.seattle.gov/light/engstd/docs2/NCB40.pdf
-
NETWORK SPOT OR SYSTEM MULTI-TRANSFORMER WET OR DRY VAULT INSULATED GROUND/NEUTRAL BUS INSTALLATION - NCB-40
- http://www.seattle.gov/light/engstd/docs2/NCB60.pdf
-
IWCB INSTALLATION AND MOUNTING PARTS - NCB-60
- http://www.seattle.gov/light/engstd/docs2/NCB120.pdf
-
2000 AMP 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUMINUM TO ALUMINUM AND ALUMINUM TO COPPER SECONDARY CABLES NETWORK AREA - NCB-120
- http://www.seattle.gov/light/engstd/docs2/NCB130.pdf
-
NETWORK PROTECTOR INDICATOR LIGHTS - NCB-130
- http://www.seattle.gov/light/engstd/docs2/NCB170.pdf
-
GROUNDING of PADMOUNT SPECIALTY & AUTOTRANSFORMERS - NCB-170
- http://www.seattle.gov/light/engstd/docs2/NCI17.pdf
-
PRIMARY CABLE FAILURE REPORT - NCI-17
- http://www.seattle.gov/light/engstd/docs2/NCI80.pdf
-
CABLE, EQUIPMENT AND FACILITY IDENTIFICATION - NCI-80
- http://www.seattle.gov/light/engstd/docs2/NCI91.pdf
-
SEALING CONDUITS - NCI-91
- http://www.seattle.gov/light/engstd/docs2/NCI99.pdf
-
LIGHT DUTY INSULATED SUPPORT ASSEMBLY NETWORK FACILITIES - NCI-99
- http://www.seattle.gov/light/engstd/docs2/NCI110.pdf
-
CABLE HANGERS - FOR NETWORK VAULTS MULTIPLE CONDUCTOR HANGER - NCI-110
- http://www.seattle.gov/light/engstd/docs2/NCI140.pdf
-
ARMORED CABLE SUPPORT FOR HIGH RISE BUILDINGS - NCI-140
- http://www.seattle.gov/light/engstd/docs2/NCI160.pdf
-
UNDERGROUND SECONDARY CABLE - TRAINING & RACKING - NCI-160
- http://www.seattle.gov/light/engstd/docs2/NCI180.pdf
-
CABLE END SEALING - NCI-180
- http://www.seattle.gov/light/engstd/docs2/NDK140.pdf
-
SQUARE TILE DUCT REBUILD - NDK-140
- http://www.seattle.gov/light/engstd/docs2/Nsp20.pdf
-
SPLICE - STRAIGHT TWO CONDUCTOR CONCENTRIC, 5000 VOLT POLYETHYLENE INSULATED COPPER CABLE - NSP-20
- http://www.seattle.gov/light/engstd/docs2/Nsp30.pdf
-
SPLICE - STRAIGHT - 5000 VOLT, TWO CONDUCTOR CONCENTRIC, POLYETHYLENE INSULATED TO SINGLE CONDUCTOR - NSP-30
- http://www.seattle.gov/light/engstd/docs2/nsp60.pdf
-
TERMINATION, 2/C, 5 KV, CONCENTRIC POLYETHYLENE INSULATION - NSP-60
- http://www.seattle.gov/light/engstd/docs2/nsp80.pdf
-
SPLICE, WYE, THREE CONDUCTOR, 13 KV PAPER INSULATED, LEAD SHEATH - NSP-80
- http://www.seattle.gov/light/engstd/docs2/nsp90.pdf
-
SPLICE- STRAIGHT, THREE CONDUCTOR, 13 kV PAPER INSULATED, LEAD SHEATH - NSP-90
- http://www.seattle.gov/light/engstd/docs2/Nsp110.pdf
-
THREE CONDUCTOR, 13.8 kV STRAIGHT SPLICE POLYETHYLENE INSULATION - NSP-100
- http://www.seattle.gov/light/engstd/docs2/Nsp110.pdf
-
TRIFURCATION of THREE CONDUCTOR POLYETHYLENE CABLE, 13 & 28 KV WITH and WITHOUT NEUTRAL/GROUND WIRES - NSP-110
- http://www.seattle.gov/light/engstd/docs2/Nsp115.pdf
-
THREE CONDUCTOR, 13.8KV PRIMARY SPLICE BELTS COMPACT SECTOR CABLES ONLY - NSP-115
- http://www.seattle.gov/light/engstd/docs2/Nsp120.pdf
-
13.8 KV PRIMARY WYE SPLICE POLYETHYLENE INSULATION - NSP-120
- http://www.seattle.gov/light/engstd/docs2/Nsp130.pdf
-
26-KV PRIMARY WYE SPLICE - POLYETHYLENE INSULATION - NSP-130
- http://www.seattle.gov/light/engstd/docs2/Nsp140.pdf
-
13.8 KV END BELL, PAPER INSULATED, LEAD COVERED - NSP-140
- http://www.seattle.gov/light/engstd/docs2/Nsp150.pdf
-
15 KV TRANSITION SPLICE 3/C PILC TO 3/C XLP - NSP-150
- http://www.seattle.gov/light/engstd/docs2/nsp171.pdf
-
FLAT STRAP SHIELDING TERMINATION FOR USE IN DELTA NETWORK ONLY - NSP-171
- http://www.seattle.gov/light/engstd/docs2/nsp200.pdf
-
SPLICE, WYE, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH - NSP-200
- http://www.seattle.gov/light/engstd/docs2/nsp210.pdf
-
SPLICE- STRAIGHT, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH - NSP-210
- http://www.seattle.gov/light/engstd/docs2/nsp220.pdf
-
TERMINATION POTHEAD, 25 KV SINGLE CONDUCTOR, PILC-PEJ - NSP-220
- http://www.seattle.gov/light/engstd/docs2/Nsp250.pdf
-
TERMINATOR - 13 KV FOR INVERTED INSTALLATION - NSP-250
- http://www.seattle.gov/light/engstd/docs2/Nsp270.pdf
-
TERMINATION OF 3/C XLP INSULATED, JACKETED CABLE USING PATR TERMINATORS, 15 kV OR 26 kV ROUND CONDUCTORS - NSP-270
- http://www.seattle.gov/light/engstd/docs2/Nsp280.pdf
-
TERMINATION OF 3/C 15 KV XLP INSULATED, PVC JACKETED CABLE USING 600 A DEAD BREAK ELBOWS ON AIR INSULATED METALCLAD SWITCHGEAR - NSP-280
- http://www.seattle.gov/light/engstd/docs2/NSP290.pdf
-
PRIMARY CABLE PREPARATION, GENERAL - NSP-290
- http://www.seattle.gov/light/engstd/docs2/Nsp350.pdf
-
GROUND CONNECTION FOR SPLICES IN NETWORK VAULTS AND MANHOLES - NSP-350
- http://www.seattle.gov/light/engstd/docs2/Ntp70.pdf
-
HIGH VOLTAGE SWITCHROOM & MULTI-TRANSFORMER NETWORK VAULT LIGHT and RECEPTACLE CIRCUITS - NTP-70
- http://www.seattle.gov/light/engstd/docs2/Ntp80.pdf
-
NETWORK PROTECTOR FUSING, LEAD SIZES AND RELAYS - NTP-80
- http://www.seattle.gov/light/engstd/docs2/Ntp120.pdf
-
HAZELTINE MODEL 2391 TRANSMITTER INSTALLATION TYPE O1 - NTP-120
- http://www.seattle.gov/light/engstd/docs2/Ntp121.pdf
-
HAZELTINE MODEL 2800 TRANSMITTER INSTALLATION TYPE O2 - NTP-121
- http://www.seattle.gov/light/engstd/docs2/Ntp122.pdf
-
HAZELTINE MODEL 2778 TRANSMITTER INSTALLATION TYPE O3 - NTP-122
- http://www.seattle.gov/light/engstd/docs2/Ntp123.pdf
-
DIGITALGRID NCS TRANSMITTER INSTALLATION, NETWORK PROTECTORS - NTP-123
- http://www.seattle.gov/light/engstd/docs2/NTP130.pdf
-
BUS TIE SWITCH INSTALLATION - NTP-130
- http://www.seattle.gov/light/engstd/docs2/NTP-60.pdf
-
LIGHTING AND SUMP PUMP INSTALLATION FOR SINGLE TRANSFORMER VAULTS - NTP-60
- http://www.seattle.gov/light/engstd/docs2/017320.pdf
-
TERMINAL POLE WITH PRIMARY SWITCH, 600 AMP - 0173.20
- http://www.seattle.gov/light/engstd/docs2/053511.pdf
-
HEAT SHRINK SPLICES, STRAIGHT, 110 KV BIL, TYCO - 0535.11
- http://www.seattle.gov/light/engstd/docs2/066103.pdf
-
PADMOUNT TRANSFORMER, INSTALLATION AND GROUNDING, 3F , 7 5 - 2 5 0 0 K V A - 0661.03
- http://www.seattle.gov/light/engstd/docs2/125210.pdf
-
FIRST HILL VACUUM SWITCH - 1252.10
- http://www.seattle.gov/light/engstd/docs2/156205.pdf
-
PRIMARY METERING COMPARTMENT REQUIREMENTS, 27 kV - 1562.05
- http://www.seattle.gov/light/engstd/docs2/156255.pdf
-
PRIMARY METERING COMPARTMENT REQUIREMENTS, 5 KV AND 15 KV - 1562.55
- http://www.seattle.gov/light/engstd/docs2/160540.pdf
-
115 KV TRANSMISSION CONSTRUCTION USING POLYMER INSULATORS - 1605.40
- http://www.seattle.gov/light/engstd/docs2/181005.pdf
-
SHARED STREETLIGHT AND TRAFFIC CONTROL HANDHOLES - 1810.05
- http://www.seattle.gov/light/engstd/docs2/d23.pdf
-
CLEARANCES FROM STRUCTURES AND GROUND - D2-3
- http://www.seattle.gov/light/engstd/docs2/d33.pdf
-
POLE SETTING DEPTH 26.4 KV LOOPED RADIAL SYSTEM - D3-3
- http://www.seattle.gov/light/engstd/docs2/d37.pdf
-
WOOD GUARD POST INSTALLATION - D3-7
- http://www.seattle.gov/light/engstd/docs2/d64.pdf
-
GUYING AND ANCHORING - D6-4
- http://www.seattle.gov/light/engstd/docs2/d71.pdf
-
115 KV TRANSMISSION CONSTRUCTION (HORIZONTAL LINE POST) - D7-1
- http://www.seattle.gov/light/engstd/docs2/d72.pdf
-
TOWER SIGN INSTALLATION - D7-2
- http://www.seattle.gov/light/engstd/docs2/d99.pdf
-
RACK SECONDARY CORNER DETAILS - D9-9
- http://www.seattle.gov/light/engstd/docs2/d102.pdf
-
METER INSTALLATION FOR LOAD CORRELATION STUDY - D10-2
- http://www.seattle.gov/light/engstd/docs2/d103.pdf
-
TRANSFORMER INSTALLATION SINGLE PHASE, 4 KV - D10-3
- http://www.seattle.gov/light/engstd/docs2/d113.pdf
-
27 KV Q LIMITER INSTALLATION - D11-3
- http://www.seattle.gov/light/engstd/docs2/d121.pdf
-
STREETLIGHT WIRING DIAGRAMS NOT FOR NEW CONSTRUCTION - D12-1
- http://www.seattle.gov/light/engstd/docs2/d129.pdf
-
LUMINAIRE ALIGNMENT - D12-9/NSL-30
- http://www.seattle.gov/light/engstd/docs2/d131.pdf
-
SECONDARY SERVICE DETAILS - D13-1
- http://www.seattle.gov/light/engstd/docs2/d143.pdf
-
BARE CONDUCTORS MECHANICAL AND ELECTRICAL PROPERTIES - D14-3
- http://www.seattle.gov/light/engstd/docs2/d144.pdf
-
BOLTED CONNECTION - D14-4/NSV-20
- http://www.seattle.gov/light/engstd/docs2/d146.pdf
-
DISTRIBUTION LINE CONNECTIONS - D14-6
- http://www.seattle.gov/light/engstd/docs2/d151.pdf
-
BIRD GUARD INSTALLATION - D15-1
- http://www.seattle.gov/light/engstd/docs2/d212.pdf
-
CELLULAR PHONE AND PERSONAL COMMUNICATIONS SERVICES (PCS) ANTENNA POLE ATTACHMENTS ABOVE PRIMARY CONDUCTORS - D2-1.2
- http://www.seattle.gov/light/engstd/docs2/d810.pdf
-
TYPICAL NUMBER BOARD INSTALLATION - D8-10
- http://www.seattle.gov/light/engstd/docs2/d814.pdf
-
TYPICAL 26 KV SWITCH TERMINATION ASSEMBLY - D8-14
- http://www.seattle.gov/light/engstd/docs2/d817.pdf
-
SWITCH, 600 AMP, 3 POLE, GANG OPERATED FOR WOOD POLE MOUNTING, UPRIGHT - D8-17
- http://www.seattle.gov/light/engstd/docs2/d826.pdf
-
26 kV CIRCUIT BREAKER - D8-26
- http://www.seattle.gov/light/engstd/docs2/d920.pdf
-
DOUBLE CIRCUIT 4 KV SWITCH INSTALLATION - D9-20
- http://www.seattle.gov/light/engstd/docs2/d921.pdf
-
4 KV SWITCH INSTALLATION - D9-21
- http://www.seattle.gov/light/engstd/docs2/d950.pdf
-
BRACKET, ALUMINUM SIDE ARM - D9-50
- http://www.seattle.gov/light/engstd/docs2/d951.pdf
-
26 KV CONSTRUCTION FOR 954 RAIL - D9-51
- http://www.seattle.gov/light/engstd/docs2/d952.pdf
-
15/26 KV DISTRIBUTION CROSSARM DETAILS - D9-52
- http://www.seattle.gov/light/engstd/docs2/d954.pdf
-
TYPICAL 26 KV FLYING TAP - D9-54
- http://www.seattle.gov/light/engstd/docs2/d955.pdf
-
26 KV CORNER CONSTRUCTION 3 ARM DOUBLE CIRCUIT - D9-55
- http://www.seattle.gov/light/engstd/docs2/d958.pdf
-
26KV HEADPIN PRIMARY AND LR SECONDARY CONSTRUCTION - D9-58
- http://www.seattle.gov/light/engstd/docs2/d960.pdf
-
15/26 kV DISTRIBUTION SINGLE PHASE CORNER CONSTRUCTION From Three Phase Lead - D9-60
- http://www.seattle.gov/light/engstd/docs2/d980.pdf
-
TREE CLEARANCES - D9-80
- http://www.seattle.gov/light/engstd/docs2/d985.pdf
-
COMMON SECONDARY NEUTRAL DEADENDING DETAILS FOR ALUMINUM NEUTRAL CONDUCTOR - D9-8.5
- http://www.seattle.gov/light/engstd/docs2/d1011.pdf
-
COPPER WIRE SIZES FOR DISTRIBUTION TRANSFORMERS SECONDARY CONNECTIONS - D10-11
- http://www.seattle.gov/light/engstd/docs2/d1014.pdf
-
15/26 KV CAPACITOR INSTALLATION 1200 KVAR CONTROLLER SWITCHED BANK, GROUNDED WYE - D10-14
- http://www.seattle.gov/light/engstd/docs2/d1024.pdf
-
INSTALLATION OF TRANSFORMER AND RELATED EQUIPMENT FOR TESTING VOLTAGE ON 26 KV - D10-2.4
- http://www.seattle.gov/light/engstd/docs2/d1031.pdf
-
TRANSFORMER INSTALLATION SINGLE PHASE, 15/26 KV - D10-3.1
- http://www.seattle.gov/light/engstd/docs2/d1033.pdf
-
FUSED CUTOUT MOUNTING - CONTAMINATED ATMOSPHERE - D10-3.3
- http://www.seattle.gov/light/engstd/docs2/d1045.pdf
-
15/26 KV DISTRIBUTION 2 TRANSFORMER, 3 PHASE INSTALLATION CLUSTER MOUNTED - D10-4.5
- http://www.seattle.gov/light/engstd/docs2/d1112.pdf
-
26 KV AUTOMATIC LINE SECTIONALIZER SINGLE-PHASE ELECTRONIC TYPE UNITS ON TANGENT CONSTRUCTION - D11-12
- http://www.seattle.gov/light/engstd/docs2/d1113.pdf
-
26 KV AUTOMATIC LINE SECTIONALIZER 3 SINGLE-PHASE ELECTRONIC TYPE UNITS ON A TANGENT POLE - D11-13
- http://www.seattle.gov/light/engstd/docs2/d1220.pdf
-
FLOODLIGHT INSTALLATION DETAILS, DIRECT POLE MOUNT - D12-20
- http://www.seattle.gov/light/engstd/docs2/d1221.pdf
-
FLOODLIGHT, CLUSTER MOUNT - D12-21
- http://www.seattle.gov/light/engstd/docs2/d1255.pdf
-
PHOTOELECTRIC CONTROL FOR 2400 VOLT UNDERGROUND STREETLIGHT SYSTEM CONTROL WIRING SCHEMATIC - D12-5.5
- http://www.seattle.gov/light/engstd/docs2/d1521.pdf
-
HAND WRAPPED TIES SINGLE PIN TYPE INSULATOR FOR COPPER OR ALUMINUM POLY COVERED CONDUCTORS - D15-2.1
- http://www.seattle.gov/light/engstd/docs2/d1522.pdf
-
HAND WRAPPED SPOOL TIES FOR COPPER OR ALUMINUM POLY COVERED CONDUCTORS SINGLE TIE - D15-2.2
- http://www.seattle.gov/light/engstd/docs2/d1523.pdf
-
INSTALLING SINGLE HOT TIE ON SINGLE INSULATOR FOR COPPER OR ALUMINUM CONDUCTORS - D15-2.3
- http://www.seattle.gov/light/engstd/docs2/d1524.pdf
-
INSTALLING DOUBLE HOT TIE ON SINGLE INSULATOR FOR COPPER OR ALUMINUM CONDUCTORS - D15-2.4
- http://www.seattle.gov/light/engstd/docs2/d14-8-NSV-10.pdf
-
TOOL AND DIE CROSS-REFERENCE FOR CONNECTORS - D14-8/NSV-10
- http://www.seattle.gov/light/engstd/docs2/d1526.pdf
-
ANGLE TIE ON SINGLE INSULATOR AND SINGLE SIDE TIE ON HORIZONTAL INSULATOR FOR COPPER OR ALUMINUM CONDUCTOR FOR COPPER OR ALUMINUM CONDUCTORS - D15-2.6
- http://www.seattle.gov/light/engstd/docs2/d9111.pdf
-
4 KV DISTRIBUTION DEADENDING DETAILS SINGLE PRIMARY - D9-11.1
- http://www.seattle.gov/light/engstd/docs2/d9116.pdf
-
4/0 PARALLEL CABLE - D9-11.6
- http://www.seattle.gov/light/engstd/docs2/d9531.pdf
-
26 KV HORIZONTAL POST CONSTRUCTION - D9-53.1
- http://www.seattle.gov/light/engstd/docs2/d9671.pdf
-
15/26 KV DISTRIBUTION CORNER POLE DETAILS 3Ø BOTH WAYS - D9-67.1
- http://www.seattle.gov/light/engstd/docs2/d10143.pdf
-
15/26 KV CAPACITOR INSTALLATION 1200 KVAR CONTROLLER SWITCHED BANK, FLOATING WYE - D10-14.3
- http://www.seattle.gov/light/engstd/docs2/du20.pdf
-
RECOMMENDED TYPICAL STREET MARKING - DU2-0/NGE-10
- http://www.seattle.gov/light/engstd/docs2/DU111.pdf
-
FUSING SCHEDULE - DU11-1
- http://www.seattle.gov/light/engstd/docs2/du134.pdf
-
METER BASE ARRANGEMENTS - DU13-4/NMT-30
- http://www.seattle.gov/light/engstd/docs2/Du518.pdf
-
POLE TERMINATION, 26 KV SINGLE PHASE UNDERGROUND SUPPLY TO OVERHEAD TRANSFORMER - DU5-18
- http://www.seattle.gov/light/engstd/docs2/Du1052.pdf
-
15/26 KV DISTRIBUTION SINGLE PHASE STEP DOWN TO 2400 VOLT - DU10-5.2
- http://www.seattle.gov/light/engstd/docs2/Du1111.pdf
-
FUSE HOLDING DEVICES & FUSES - DU11-1.1
- http://www.seattle.gov/light/engstd/docs2/Du5153.pdf
-
POLE TERMINATION, 3Ø 26 kV DISTRIBUTION - METAL OXIDE ARRESTER, #1/0 28 kV XLP, 2/C & #8 KERITE - DU5-15.3
- http://www.seattle.gov/light/engstd/docs2/Du5158.pdf
-
SINGLE PHASE PRIMARY UNDERGROUND,15kV METAL OXIDE ARRESTER, #1 2/C, 27KV XLP CABLE - DU5-15.8
- http://www.seattle.gov/light/engstd/docs2/Du51531.pdf
-
POLE TERMINATION, 3Ø 26kV DISTRIBUTION WING ARM CONSTRUCTION METAL OXIDE ARRESTER #1/0 28KV XLP, 2/C & #8 KERITE - DU5-15.31
- http://www.seattle.gov/light/engstd/docs2/Du51561.pdf
-
POLE TERMINATION, 3Ø 15/26 kV DISTRIBUTION, 350, 500, 750, AND 1000 KCMIL, 27 kV SHIELDED CABLE HIGH FAULT CURRENT AREAS - DU5-15.61
- http://www.seattle.gov/light/engstd/docs2/E111.pdf
-
FULL LOAD CURRENTS IN AMPERES SINGLE-PHASE CIRCUITS - E1-11 / NGE-20
- http://www.seattle.gov/light/engstd/docs2/s1281.pdf
-
WELDING AND CUTTING PRACTICES - S128-1
- http://www.seattle.gov/light/engstd/docs2/s3190.pdf
-
HAND SIGNALS FOR USE IN LINE CONSTRUCTION - S319-0/NSA-10
- http://www.seattle.gov/light/engstd/docs2/s3191.pdf
-
HAND SIGNALS FOR SHOVEL AND CRANE OPERATION - S319-1/NSA-20
- http://www.seattle.gov/light/engstd/docs2/s3192.pdf
-
SAFE WORKING LOAD FOR ROPES AND SLINGS - S319-2/NSA-30
- http://www.seattle.gov/light/engstd/docs2/s4031.pdf
-
SAFE POLE CLIMBING PRACTICES - S403-1
- http://www.seattle.gov/light/engstd/docs2/SL102.pdf
-
ALUMINUM STREETLIGHT POLE INSTALLATION - SL10-2/NSL-50
- http://www.seattle.gov/light/engstd/docs2/SL105.pdf
-
STREETLIGHT POLE BASE INSTALLATION DETAILS - SL10-5/NSL-80
- http://www.seattle.gov/light/engstd/docs2/U2-11.40-NDK-40.pdf
-
MANDRELING AND CLEANING OF DUCTS AND CONDUITS - U2-11.40/NDK-40
- http://www.seattle.gov/light/engstd/docs2/U4-5-NCB-50.pdf
-
INSTALLATION OF SECONDARY BUS BAR - U4-5/NCB-50
- http://www.seattle.gov/light/engstd/docs2/U5-1.10-NCB-110.pdf
-
SUBMERSIBLE MULTIPLE CONNECTOR INSTALLATION FOR ALUMINUM OR COPPER SECONDARY CABLE-TYPE USE - U5-1.10/NCB-110
- http://www.seattle.gov/light/engstd/docs2/U10-5.3-NTP-40.pdf
-
NETWORK TRANSFORMER ANCHOR BEAM FOR SEISMIC LOADING (EARTHQUAKE ANCHORS) - U10-5.3/NTP-40
- http://www.seattle.gov/light/engstd/docs2/U26.pdf
-
INSPECTION AND REPAIR PROCEDURES FOR PRECAST VAULTS AND MANHOLES - U2-6/NVH-20
- http://www.seattle.gov/light/engstd/docs2/U43.pdf
-
BENDING, TRAINING, RACKING AND RE-REELING OF UNDERGROUND PRIMARY CABLE - U4-3/NCI-170
- http://www.seattle.gov/light/engstd/docs2/u57.pdf
-
INTERCEPTING EXISTING UNDERGROUND SERVICE - U5-7
- http://www.seattle.gov/light/engstd/docs2/u72.pdf
-
RIGID ALUMINUM CONDUIT - U7-2/NDK-130
- http://www.seattle.gov/light/engstd/docs2/U95.pdf
-
577 VAULT TRANSFORMER AND JUNCTION BOX INSTALLATION, GROUNDING AND CONNECTIONS - U9-5
- http://www.seattle.gov/light/engstd/docs2/u131.pdf
-
ELECTRICAL INSULATING OIL SAMPLING AND TESTING FLAT GAP - U13-1/NGE-50
- http://www.seattle.gov/light/engstd/docs2/U216.pdf
-
VAULT, MANHOLE, HANDHOLE NUMBER IDENTIFICATION - U2-16
- http://www.seattle.gov/light/engstd/docs2/U428.pdf
-
BENDING, TRAINING, AND RACKING UNDERGROUND SECONDARY CABLE (SERVICES AND/OR BUS TIES) - U4-2.8/NCI-150
- http://www.seattle.gov/light/engstd/docs2/U433.pdf
-
CABLE TAGGING AND PHASE MARKINGS - U4-3.3
- http://www.seattle.gov/light/engstd/docs2/u436.pdf
-
DUCT EDGE PROTECTION - U4-3.6/NCI-70
- http://www.seattle.gov/light/engstd/docs2/U437.pdf
-
FIRE AND ELECTRIC ARC PROOFING OF CABLES - U4-3.7/NCI-90
- http://www.seattle.gov/light/engstd/docs2/U527.pdf
-
J BOX MOUNTING AND GROUNDING - U5-2.7
- http://www.seattle.gov/light/engstd/docs2/u529.pdf
-
2000 AMP, 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUM. TO ALUM. AND ALUM. TO COPPER SECONDARY CABLES - U5-2.9
- http://www.seattle.gov/light/engstd/docs2/u1055.pdf
-
VIBRATION DAMPERS NETWORK TYPE AND SINGLE PHASE TRANSFORMERS - U10-5.5/NTP-50
- http://www.seattle.gov/light/engstd/docs2/U1213.pdf
-
METER LOCATION AND CONDUIT ENTRANCE DETAILS FOR SECONDARY UNDERGROUND RESIDENTIAL SERVICE, CLASS 320 MAXIMUM - U12-1.3/NMT-10
- http://www.seattle.gov/light/engstd/docs2/u5281.pdf
-
PRIMARY CABLE PREPARATION, GENERAL - U5-2.81/NSP-290
- http://www.seattle.gov/light/engstd/docs2/u5285.pdf
-
TERMINATOR ELBOW RECEPTACLE INSTALLATION #8 KERITE CABLE - U5-2.8.5
- http://www.seattle.gov/light/engstd/docs2/U5287.pdf
-
200 AMPERE ELBOW SEALING ON 1/0, 28 KV JACKETED CONCENTRIC NEUTRAL CABLE - U5-2.8.7
- http://www.seattle.gov/light/engstd/docs2/U7108.pdf
-
CABLE IDENTIFICATION - U7-10.8/NDK-110
- http://www.seattle.gov/light/engstd/docs2/U51505.pdf
-
SEPARABLE CONNECTOR (ELBOW), 200 A, LOADBREAK - U5-15.05
- http://www.seattle.gov/light/engstd/docs2/U51605.pdf
-
SEPARABLE CONNECTOR (ELBOW), 200 A, DEADBREAK - U5-16.05
- http://www.seattle.gov/light/engstd/docs2/U51710.pdf
-
SEPARABLE CONNECTOR (T-BODY), 150 kV BIL, DEADBREAK - U5-17.10/NSP-305
- http://www.seattle.gov/light/engstd/docs2/U52620.pdf
-
TERMINATION, 200 kV BIL, COLD SHRINK - U5-26.20/NSP-285
- http://www.seattle.gov/light/engstd/docs2/U53201.pdf
-
SPLICE, STRAIGHT, 28 KV, XLP OR EPR INSULATED CABLE - U5-3.20.1/NSP-170
- http://www.seattle.gov/light/engstd/docs2/U53203.pdf
-
GROUNDING SPLICES ON 28 kV DRAIN WIRE-SHIELDED CABLE - U5-3.20.3
- http://www.seattle.gov/light/engstd/docs2/U53204.pdf
-
GROUNDING 3M COLD SHRINK SPLICES ON 28 kV FLAT STRAP CABLE - U5-3.20.4
- http://www.seattle.gov/light/engstd/docs2/U53221.pdf
-
JACKET SEALING WHEN SPLICING JACKETED 1/0 28 kV C.N. CABLE TO BARE 1/0 28 kV C.N. CABLE - U5-3.22.1
- http://www.seattle.gov/light/engstd/docs2/Ntp41.pdf
-
SEISMIC ANCHORING FOR OIL FILLED SPECIALTY TRANSFORMERS - NTP-41
- http://www.seattle.gov/light/engstd/docs2/U2-12-1-NVH-60.pdf
-
SUMP PUMP PIPE INSTALLATION, VAULTS and MANHOLES NEW 2" or REPAIR 1-1/4" - U2-12.1/NVH-60
- http://www.seattle.gov/light/engstd/docs2/d15.pdf
-
TEMPERATURE CONVERSION TABLE - D1-5/NGE-60
- http://www.seattle.gov/light/engstd/docs2/nsp321.pdf
-
25kV 600 AMP, Straight Receptacle Installation lnstructions - NSP-321
- http://www.seattle.gov/light/engstd/docs2/Ncb20.pdf
-
GROUNDING NETWORK SYSTEM TRANSFORMER VAULTS WET, DRY, OR SPOT - COPPER BUS - NCB-20
- http://www.seattle.gov/light/engstd/docs2/u435.pdf
-
CREEPAGE OF CABLE - U4-3.5/NCI-130
- http://www.seattle.gov/light/engstd/docs2/d141.pdf
-
AMPACT TAP CHART - D14-1
- http://www.seattle.gov/light/engstd/docs2/d44.pdf
-
BRACES - D4-4
- http://www.seattle.gov/light/engstd/docs2/d73.pdf
-
115 KV TRANSMISSION, 50-ft STEEL POLE FOR CEDAR FALLS LINE TO REPLACE 15 METER CONCRETE, OR 50-ft AND 55-ft WOOD POLES - D7-3
- http://www.seattle.gov/light/engstd/docs2/U1014.pdf
-
PADMOUNT TRANSFORMER INSTALLATION, GROUNDING AND CONNECTIONS 240/120 V, 1Ø, 3W, 25 THROUGH 167 kVA - U10-1.4
- http://www.seattle.gov/light/engstd/docs2/171410.pdf
-
STREETLIGHT CIRCUIT TAGGING AND IDENTIFICATION SYSTEM - 1714.10
- http://www.seattle.gov/light/engstd/docs2/U9-7.3.pdf
-
Grounding and Connection Diagram, Single Phase 26 kV Distribution Transformer - U9-7.3
- http://www.seattle.gov/light/engstd/docs2/U1-4-11-NCI-60.pdf
-
CABLE PULLING CALCULATIONS Maximum Pulling Tensions for Installing Electrical Wire and Cables (Underground) - U1-4.11/NCI-60
- http://www.seattle.gov/light/engstd/docs2/NDK-150.pdf
-
Insulation Detail for City Light Duct Banks That Cross Steam Lines - NDK-150
- http://www.seattle.gov/light/engstd/docs2/U2-11-2-NDK-20.pdf
-
REINFORCEMENT OF CONCRETE ENCASED DUCT RUNS - U2-11.2/NDK-20
- http://www.seattle.gov/light/engstd/docs2/U11-8.pdf
-
Commercial Subway Transformer 750 through 2500 kVA, Standard Installation - U11-8
- http://www.seattle.gov/light/engstd/docs2/DU10-5-1.pdf
-
15/26 kV Distribution Three-Phase Transformer Installation Cluster Mounted, Pole Top - DU10-5.1
- http://www.seattle.gov/light/engstd/docs2/D10-5-1.pdf
-
15/26 kV Distribution Three-Phase Transformer Installation Cluster Mounted, Pole Top - D10-5.1
- http://www.seattle.gov/light/engstd/docs2/U9-7-5.pdf
-
Transformer Installation, Grounding and Connections 120/240 V and 240/480 V, 3-Phase, 4-Wire - U9-7.5
- http://www.seattle.gov/light/engstd/docs2/U9-7-3.pdf
-
Grounding and Connection Diagram, Single Phase 26 kV Distribution Transformer - U9-7.3
- http://www.seattle.gov/light/engstd/docs2/1712-00.pdf
-
Streetlight Luminaire Installation on Wood Poles - 1712.00
- http://www.seattle.gov/light/engstd/docs2/U2-12.4-NVH-70.pdf
-
Sump Installation for Existing and Cast-in-Place Vaults or Manholes - U2-12.4/NVH-70
- http://www.seattle.gov/light/engstd/docs2/U1-4.51-NTP-100.pdf
-
Transformer Secondary Lead Sizes for Underground Installations - U1-4.51/NTP-100
- http://www.seattle.gov/light/engstd/docs2/U1-4.12-NCI-61.pdf
-
Pulling Cable Around Blocks - U1-4.12/NCI-61
- http://www.seattle.gov/light/engstd/docs2/D10-5.pdf
-
15/26 kV Distribution Three-Phase Transformer Installation, Cluster Mounted - D10-5
- http://www.seattle.gov/light/engstd/docs2/0232-05.pdf
-
Underground Residential Equipment Location of 577 Vaults and Secondary Handholes - 0232.05
- http://www.seattle.gov/light/engstd/docs2/U2-13-1-NVH-50.pdf
-
Typical Handhole With Conduit - U2-13.1/NVH-50
- http://www.seattle.gov/light/engstd/docs2/0674-06.pdf
-
In-Building Vault Lighting and Receptacle Requirements, Looped Radial System - 0674.06
- http://www.seattle.gov/light/engstd/docs2/NSP-320.pdf
-
DEADBREAK STRAIGHT LINE CONNECTOR 600 AMP, 13 KV and 26 KV - NSP-320
- http://www.seattle.gov/light/engstd/docs2/0095-05.pdf
-
Pole Attachments, Automated Meter Reading and Cellular Phone Antennas - 0095.05
- http://www.seattle.gov/light/engstd/docs2/0010-07.pdf
-
How to Mark Up and Submit a Standard for Revision - 0010.07
- http://www.seattle.gov/light/engstd/docs2/NCB10.pdf
-
GROUNDING NETWORK SYSTEM DRY TRANSFORMER VAULTS, ALUMINUM BUS - NCB-10
- http://www.seattle.gov/light/engstd/docs2/U2-11-3-NDK-30.pdf
-
TERMINATION of EXISTING DUCTS in NEW VAULTS or MANHOLES - U2-11.3/NDK-30
- http://www.seattle.gov/light/engstd/docs2/0468-90.pdf
-
Exothermic Connection System - 0468.90
- http://www.seattle.gov/light/engstd/docs2/d812.pdf
-
26 kV, 3-Pole Gang Operated Air Break Switch, Unitized - D8-12
- http://www.seattle.gov/light/engstd/docs2/d9114.pdf
-
26 kV DEADENDS - D9-11.4
- http://www.seattle.gov/light/engstd/docs2/d21.pdf
-
Standard Spacing of Arms - D2-1
- http://www.seattle.gov/light/engstd/docs2/NCB150.pdf
-
Installation of Alley Wall Risers and Cans - NCB-150
- http://www.seattle.gov/light/engstd/docs2/Nsp100.pdf
-
Three Conductor, 13.8 kV Straight Splice - Polyethylene Insulation - NSP-100
- http://www.seattle.gov/light/engstd/docs2/0072-01.pdf
-
Wildlife Protection, Small Birds and Animals - 0072.01
- http://www.seattle.gov/light/engstd/docs2/NCI-100.pdf
-
CABLE SUPPORT BRACKET WALL MOUNTED - NCI-100
- http://www.seattle.gov/light/engstd/docs2/U5-14-NSP-310.pdf
-
600 AMPERE PRIMARY EQUIPMENT TERMINATION - U5-14/NSP-310
- http://www.seattle.gov/light/engstd/docs2/U2-14-2.pdf
-
TYPICAL VAULT OR HANDHOLE INSTALLATION (5 ft X 7 ft X 7 ft AND SMALLER) - U2-14.2
- http://www.seattle.gov/light/engstd/docs2/U2-15-1.pdf
-
INSTALLATION OF RING TYPE VAULTS - U2-15.1
- http://www.seattle.gov/light/engstd/docs2/U2-22.pdf
-
PRE-CAST PANEL VAULT INSTALLATION, GENERAL NON-NETWORK AREA - U2-22
- http://www.seattle.gov/light/engstd/docs2/U5-1-02.pdf
-
Splices And Taps, 600 Volt, Aluminum To Aluminum, Aluminum To Copper, Copper To Copper - U5-1.02
- http://www.seattle.gov/light/engstd/docs2/U11-9.pdf
-
Transformer And Network Protector Secondary Bolting and Taping - U11-9 / NTP-110
- http://www.seattle.gov/light/engstd/docs2/U5103.pdf
-
Application Data For Heat-Shrinkable Splice Covers And Cable Caps - U5-1.03/NCB-100
- http://www.seattle.gov/light/engstd/docs2/NCB70.pdf
-
Traffic and Streetlight Services in Network Areas - NCB-70
- http://www.seattle.gov/light/engstd/docs2/DU114.pdf
-
Cable Limiters - Distribution - DU11-4
- http://www.seattle.gov/light/engstd/docs2/NTP-90.pdf
-
Cable Limiters - Network - NTP-90
- http://www.seattle.gov/light/engstd/docs2/1730-00.pdf
-
Streetlight Fusing Schedule, Individual - 1730.00
- http://www.seattle.gov/light/engstd/docs2/DU55.pdf
-
Pole Termination, 600 Volt Underground to Overhead 1. Notes - DU5-5
- http://www.seattle.gov/light/engstd/docs2/U5-17-05.pdf
-
Separable Connector (T-Body), 125 kV BIL, Deadbreak - U5-17.05/NSP-304
- http://www.seattle.gov/light/engstd/docs2/U1-4-15_NCI-20.pdf
-
GUIDE FOR HIGH DC VOLTAGE FIELD TESTING OF INSULATED POWER CABLE - U1-4.15/NCI-20
- http://www.seattle.gov/light/engstd/docs2/0257.06 .pdf
-
Ceiling Channel for In-Building Vaults - 0257.06
- http://www.seattle.gov/light/engstd/docs2/0461-10.pdf
-
Grounding Electrodes for Handholes and Vaults - 0461.10
- http://www.seattle.gov/light/engstd/docs2/u5284.pdf
-
600 Amp Primary Connectors and Cable Mounting Methods - U5-2.8.4/NSP-300
- http://www.seattle.gov/light/engstd/docs2/U7-10-1-NDK-80.pdf
-
Secondary Conduit Riser Pole Base Detail - U7-10.1/NDK-80
- http://www.seattle.gov/light/engstd/docs2/U7-10-2-NDK-90.pdf
-
Primary Conduit Riser Pole Base Detail - U7-10.2/NDK-90
- http://www.seattle.gov/light/engstd/docs2/U9-5-5.pdf
-
Three-Phase Loadbreak Vault, 612 and Larger - U9-5.5
- http://www.seattle.gov/light/engstd/docs2/1716-38.pdf
-
Streetlight Pole, Chief Seattle, Foundation, Base, and Collar Installation - 1716.38
- http://www.seattle.gov/light/engstd/docs2/0751-00.pdf
-
Customer Requirements, In-Building Transformer Vaults, Network and Looped Radial Systems - 0751.00
- http://www.seattle.gov/light/engstd/docs2/0226.06.pdf
-
Installation of Fluidized Thermal Backfill - 0226.06
- http://www.seattle.gov/light/engstd/docs2/0751-60.pdf
-
Concurrent Customer Requirements, In-Building Transformer Vaults, Looped Radial System - 0751.60
- http://www.seattle.gov/light/engstd/docs2/0214-00.pdf
-
Clearances between SCL Underground Structures and Other Utility Structures in the Public Right-of-Way - 0214.00
- http://www.seattle.gov/light/engstd/docs2/0121-03.pdf
-
Single-Phase Angle Pole Top Assemblies - 0121.03
- http://www.seattle.gov/light/engstd/docs2/0101-05.pdf
-
Single-Phase Dead End Pole Top Assemblies for View Areas - 0101.05
- http://www.seattle.gov/light/engstd/docs2/0121-05.pdf
-
Single-Phase Dead End Pole Top Assemblies - 0121.05
- http://www.seattle.gov/light/engstd/docs2/0101-03.pdf
-
Single-Phase Angle Pole Top Assembly for View Areas - 0101.03
- http://www.seattle.gov/light/engstd/docs2/0101-01.pdf
-
Single-Phase Tangent Pole Top Assembly for View Areas - 0101.01
- http://www.seattle.gov/light/engstd/docs2/0100-11.pdf
-
LR Bracket Installation - 0100.11
- http://www.seattle.gov/light/engstd/docs2/0121-01.pdf
-
Single-Phase Tangent Pole Top Assembly - 0121.01
- http://www.seattle.gov/light/engstd/docs2/0474-08.pdf
-
Looped Radial and Network Dry Vault Service Entrance Bus Duct - 0474.08
- http://www.seattle.gov/light/engstd/docs2/0751-77.pdf
-
In-building Vault Equipment Clearances - 0751.77
- http://www.seattle.gov/light/engstd/docs2/0094-01.pdf
-
Communication Enclosures on SCL Wood Poles - 0094.01
- http://www.seattle.gov/light/engstd/docs2/1716.07.pdf
-
Streetlight Handhole and Conduit Requirements - 1716.07
- http://www.seattle.gov/light/engstd/docs2/U7-10.9_NDK-120F06042015.pdf
-
GROUNDING CONDUIT RISERS ON POLES - U7-10.9/NDK-120
- http://www.seattle.gov/light/engstd/docs2/NVH-80.pdf
-
Network Area Requirements for Panel or Cast-in-place Vaults - NVH-80
- http://www.seattle.gov/light/engstd/docs2/U9-7.7.pdf
-
Transformer Installation, Grounding and Connections 208Y/120, 240Y/138, and 480Y/277 V, 3-Phase, 4-Wire Subtractive Polarity - U9-7.7
- http://www.seattle.gov/light/engstd/docs2/0222-02.pdf
-
Requirements for Duct Banks in the Public Right-of-Way - 0222.02
- http://www.seattle.gov/light/engstd/docs2/0123.05.pdf
-
Three-Phase Dead End Pole Top Assemblies - 0123.05
- http://www.seattle.gov/light/engstd/docs2/0123.03.pdf
-
Three-Phase Angle Pole Top Assemblies - 0123.03
- http://www.seattle.gov/light/engstd/docs2/0123.01.pdf
-
Three-Phase Tangent Pole Top Assemblies - 0123.01
- http://www.seattle.gov/light/engstd/docs2/0103.05.pdf
-
Three-Phase Dead End Pole Top Assemblies for View Areas - 0103.05
- http://www.seattle.gov/light/engstd/docs2/NCI-62.pdf
-
Pulling Iron Installation for In-Building Vaults, Network System - NCI-62
- http://www.seattle.gov/light/engstd/docs2/0103.03.pdf
-
Three-Phase Angle Pole Top Assembly for View Areas - 0103.03
- http://www.seattle.gov/light/engstd/docs2/0103.01.pdf
-
Three-Phase Tangent Pole Top Assembly for View Areas - 0103.01
- http://www.seattle.gov/light/engstd/docs2/U12-5_NMT-20.pdf
-
Meter Socket Connections and conductor Identification 200 Ampere Maximum - U12-5/NMT-20
- http://www.seattle.gov/light/engstd/docs2/DU5-15.6.pdf
-
Pole Termination, 3Ø, 1200 A, 2-750 kcmil, 1/C, or 2-1000 kcmil, 1/C Cables Per Phase - DU5-15.62
- http://www.seattle.gov/light/engstd/docs2/D8-19.pdf
-
26/34.5 kV Upright Switch, 1200 A, 3 Pole, Gang Operated, for Wood Pole Mounting - D8-19
- http://www.seattle.gov/light/engstd/docs2/1710.50.pdf
-
STREETLIGHT SYSTEM GROUNDING AND BONDING - 1710.50
- http://www.seattle.gov/light/engstd/docs2/0226.11.pdf
-
Backfill Operations, General Requirements - 0226.11
- http://www.seattle.gov/light/engstd/docs2/U10-5.2.pdf
-
Pad Construction for Pad-mounted Switchgear - U10-5.2
- http://www.seattle.gov/light/engstd/docs2/u126.pdf
-
Mapping Symbols - U1-2.6
- http://www.seattle.gov/light/engstd/docs2/U10-5.pdf
-
Padmount Switch Installation Guideline - U10-5
- http://www.seattle.gov/light/engstd/docs2/0451.01.pdf
-
Grounding Electrodes for Distribution Poles - 0451.01
- http://www.seattle.gov/light/engstd/docs2/0093.02.pdf
-
Utility Pole Attachments - 0093.02
- http://www.seattle.gov/light/engstd/docs2/0093.06.pdf
-
Communications Bracket Installation - 0093.06
- http://www.seattle.gov/light/engstd/docs2/0751.49.pdf
-
In-Building Transformer Vault Doors - 0751.49
- http://www.seattle.gov/light/engstd/docs2/0233.05.pdf
-
Secondary Handhole Grounding - 0233.05
- http://www.seattle.gov/light/engstd/docs2/D8-20.pdf
-
26/34.5 kV Vertical Switch, 1200 A, 3 Pole, Gang Operated, for Wood Pole Mounting, 1200 A Cable Termination Industry Standards - D8-20
- http://www.seattle.gov/light/engstd/docs2/DU5-1.pdf
-
Joint Preparation For Bolted And Compression Joints With Copper And/Or Aluminum (Plus Steel To Copper) - DU5-1/NSV-30
- http://www.seattle.gov/light/engstd/docs2/U10-1.2.pdf
-
Transformer Pad, Commercial and Industrial Underground from Overhead - U10-1.2
- http://www.seattle.gov/light/engstd/docs2/0652.01.pdf
-
Transformer Pad, Installation and Grounding, Single Phase, 25-167 kVA - 0652.01
- http://www.seattle.gov/light/engstd/docs2/0652.03.pdf
-
Transformer Pad, Installation and Grounding, Three-Phase, 75-300 kVA - 0652.03
- http://www.seattle.gov/light/engstd/docs2/0652.05.pdf
-
Transformer Pad, Installation and Grounding, Three Phase, 500-1500 kVA - 0652.05
- http://www.seattle.gov/light/engstd/docs2/0652.07.pdf
-
Transformer Pad, Installation and Grounding, Three Phase, 2000-2500 kVA - 0652.07
- http://www.seattle.gov/light/engstd/docs2/1716.12.pdf
-
Streetlight, Precast, Concrete Foundation Installation - 1716.12
- http://www.seattle.gov/light/engstd/docs2/1716.34.pdf
-
Requirements for Streetlight Pole Mounting and Grouting - 1716.34
- http://www.seattle.gov/light/engstd/docs2/NCB-140.pdf
-
Fire Detection Installation Details and Wiring Diagram for Dry Vault - NCB-140
- http://www.seattle.gov/light/engstd/docs2/NCB-141.pdf
-
Fire Detection Installation Details and Wiring Diagram for Wet Vaults - NCB-141
- http://www.seattle.gov/light/engstd/docs2/U9-6.pdf
-
577 VAULT WITH THREE LOADBREAK JUNCT ION BOX ES, INSTALLATION, GROUNDING AND CONNECTIONS - U9-6
- http://www.seattle.gov/light/engstd/docs2/0224.05.pdf
-
Requirements for Underground Services on Private Property - 0224.05
- http://www.seattle.gov/light/engstd/docs2/U10-7.pdf
-
Requirements for Transformer Pads and External, Below-Grade Transformer Service Vaults, Looped Radial System - U10-7
- http://www.seattle.gov/light/engstd/docs2/U7-10_NDK-70.pdf
-
Conduit Risers on Poles - U7-10/NDK-70