Home Zone: John Muir

Updated: May 2024

Take the Community Needs Survey!

Encuesta de necesidades de la comunidad en la Zona Residencial de John Muir
 
Khảo sát nhu cầu cộng đồng ở John Muir Home Zone (Khu Vực Nhà Ở John Muir)
 
Bulshada Aagga Guriga John Muir Waxay U Baahan Tahay Sahan
 
John Muir Home Zone 社區需求調查
 
Sarbey ng Pangangailangan sa Komunidad ng John Muir Home Zone
 
ጆን ሙር የቤት ዞን የማህበረሰብ ፍላጎት ዳሰሳ ጥናት 
 
ዳህሳሳዊ መጽናዕቲ ድልየታት ማሕበረሰብ ኣብ መንበሪ ኣባይቲ John Muir ሰባትን ተሽከርከርቲን ብሓባር ዝጥቀሙሉ ጎደና (Home Zone)

Get involved and stay informed: Sign up to receive email updates

John Muir Home Zone Proposed Boundaries

An image describing the steps of the Home Zone planning process. Step 1 is to identify key safety issues and prioritize those issues. Step 2 is to determine possible solutions that fit within the Home Zone budget. Step 3 is to draft a neighborhood-wide Home Zone plan, which will be reviewed by the Steering Committee and the larger neighborhood. Step 4 is to design the projects once the Home Zone plan is approved. Step 5 is to construct the projects the year after the Home Zone plan is approved by the community and to follow up with traffic studies and other evaluations to determine how effective the Home Zone projects were.

Transportation

Greg Spotts, Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Transportation

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.